Home / Browse projects / Thane, Maharashtra / Purva Panorama Tower C

Registered Litigation declared Others project

Purva Panorama Tower C

By Purva Oak Private Limited

RG-MH-31476 · RERA P51700079811 · Last updated on MahaRERA portal: 3 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 20 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2031Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 35%
213 of 368Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Purva Panorama Tower C is a Others project by Purva Oak Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700079811 on 27 Mar 2025. Possession is promised by 31 Mar 2031. 155 of the 368 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NamePurva Panorama Tower C
  • TypeOthers
  • Location
    • Ghodbunder Road
    • Thane
    • Kolshet
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079811
  • ReraGenie IDRG-MH-31476

Builder

  • NamePurva Oak Private Limited
  • Entity typeCompany
  • CINU45309KA2016PTC096197
  • GSTIN27AAICP7850N1ZO
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorNiraj Kumar Gautam
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2025PromisedMar 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2025
  • Promised completion31 Mar 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Current status

42%155 of 368 units booked
4.0%Work done, per cost certificate

Figures as on 3 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Purva Panorama Tower CNA54433680368

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 35%.

Purva Panorama Tower C: 12% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)35%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed647

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots647
Closed/Covered647

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area38,017 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI39257.36
Proposed, not sanctioned39,257 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSERENITY GRND FLR
Estimated costRs 179.98 cr
Cost incurredRs 7.16 cr
Work done3.98%
BuildingWingEstimatedIncurred
Purva Panorama Tower CNARs 132.24 cr-
-NARs 47.74 crRs 7.16 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sandeep Prabhu (Saakaar Architects)
ArchitectArchetype Consultant Pvt Ltd
EngineerSant Kumar Pandey
EngineerSyInteGreat PMC India LLP
Chartered AccountantAKPJ & ASSOCIATES
PartnerRole in project
Purva Oak Private Limited-

Litigation declared20

CaseCourtStatus
CP No 55 of 2016/2016NCLT Mumbai Bench TwoOngoing
COMIP/241/2018Bombay High CourtPending for Hearing NDH is not intimated
152/2018Bombay High CourtPre Admission Stage
84/2015Addl Collector Appeals ThanePre Admission Stage
997/2021Delhi High CourtMatter is pending
CC006000000194578/2021MahaRERAMatter is pending
CC006000000196509/2021MahaRERAMatter is pending
CC006000000333812/2023MahaRERAMatter is pending
CC006000000303162/2022MahaRERAMatter is pending
CC006000000194608/2021MahaRERAMatter is pending
CC006000000354474/2023MahaRERAMatter is pending
AT006000000031691/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031683/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031685/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031680/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031684/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031679/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031681/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031682/2019MahaRERA Appellate TribunalReview Application Filed
AT006000000031682/2021MahaRERA Appellate TribunalMatter is pending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2031

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 04 Layout Plan.pdf3 Apr 2026
Building plan approvalFile: Tower C BP.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 31-12-25.pdf3 Apr 2026
Form 1File: Form 1 Architect.pdf19 Dec 2025
Form 2File: Form 2.pdf19 Dec 2025
Form 3File: CA Certifictae_compressed.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_compressed.pdf19 Dec 2025
Form 1File: Form 1.pdf19 Dec 2025
Form 2File: Form 2.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold.pdf19 Dec 2025
Form 3File: Form 3_compressed.pdf19 Dec 2025
Other - TechnicalFile: Declartion.pdf27 Mar 2025
Details of encumbrances concerned to FinanceFile: Financial Enc_merged.pdf25 Mar 2025
Declaration in FORM BFile: Form B BR.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Mar 2025
Other - LegalFile: Property Card.pdf25 Mar 2025
CERSAI detailsFile: Registered Indenture of Mortgage 4.pdf25 Mar 2025
CERSAI detailsFile: Registered Indenture of Mortgage 3.pdf25 Mar 2025
CERSAI detailsFile: Registered Indenture of Mortgage 2.pdf25 Mar 2025
CERSAI detailsFile: Cersai Declaration.pdf25 Mar 2025
CERSAI detailsFile: Registered Indenture of Mortgage 1.pdf25 Mar 2025
Details of encumbrances concerned to LegalFile: Financial Enc_merged.pdf25 Mar 2025
Other - TechnicalFile: CC Decl.pdf25 Mar 2025
Other - TechnicalFile: CC Layout Plan with T-C.pdf25 Mar 2025
Other - TechnicalFile: Land Area Decl.pdf25 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Decl.pdf25 Mar 2025
Layout approvalFile: Layout Plan.pdf21 Mar 2025
Building plan approvalFile: Bldg Plan.pdf21 Mar 2025
PAN CardFile: PAN Card.pdf21 Mar 2025
Copy of the legal title reportFile: RERA Title Report-1-50.pdf21 Mar 2025
Copy of the legal title reportFile: RERA Title Report-51-84.pdf21 Mar 2025
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (1).pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf21 Mar 2025
Proforma of Allotment letterFile: Draft Allotment Letter.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg Plan.pdf21 Mar 2025
Declaration about Commencement CertificateFile: Declaration - CC.pdf21 Mar 2025
CERSAI detailsFile: Cersai ABS.pdf21 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf21 Mar 2025
Deviation Report with respect to Allotment letterFile: No Dev All.pdf21 Mar 2025
Details of encumbrances concerned to LegalFile: ilovepdf_merged (1).pdf21 Mar 2025
Other - FinanceFile: Registered Indenture of Mortgage Index 2.pdf21 Mar 2025
Other - TechnicalFile: Land Declaration.pdf21 Mar 2025
Other - TechnicalFile: Anx A.pdf21 Mar 2025
Deviation Report with respect to model copy of AgreementFile: No Dev AFS.pdf21 Mar 2025
Proforma of Agreement for saleFile: AFS.pdf21 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DoI.pdf21 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf21 Mar 2025

How this compares with Thane

42%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Purva Panorama Tower C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmPurva Panorama Tower CCompleted 92Lapsed / revoked 17Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: Purva Oak Private Limited

Purva Oak Private Limited has 4 registrations on MahaRERA, including ONE PARK AVENUE - AVENUE 1 and ONE PARK AVENUE - AVENUE 6. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Purva Panorama Tower C is delayed beyond 31 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Purva Panorama Tower C?

The registered promoter entity is Purva Oak Private Limited, a company as per the filing. Its CIN U45309KA2016PTC096197 and GSTIN 27AAICP7850N1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Purva Panorama Tower C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Purva Panorama Tower C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Purva Panorama Tower C?

The professionals named in the filing: Architect: Ar. Sandeep Prabhu (Saakaar Architects); Architect: Archetype Consultant Pvt Ltd; Engineer: Sant Kumar Pandey; Engineer: SyInteGreat PMC India LLP; Chartered Accountant: AKPJ & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Purva Panorama Tower C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Purva Panorama Tower C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Purva Panorama Tower C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.