Home / Browse projects / Mumbai Suburban, Maharashtra / Purva Clermont Wing E

Registered No litigation declared Commercial project

Purva Clermont Wing E

By Puravankara Limited

RG-MH-29457 · RERA P51800028492 · Last updated on MahaRERA portal: 1 Dec 2025

Source: official MahaRERA filing

Red flags

  • Rs 195.00 crore secured on the land, in favour of TATA CAPITAL HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 77%
18 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Purva Clermont Wing E is a Commercial project by Puravankara Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028492 on 8 Mar 2021. Possession is promised by 30 Jun 2027. 61 of the 79 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePurva Clermont Wing E
  • TypeCommercial
  • Location
    • DP Road
    • Ghatkopar Taluk
    • Deonar Village
    • Mumbai
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • RERA no.P51800028492
  • ReraGenie IDRG-MH-29457

Builder

  • NamePuravankara Limited
  • Entity typeCompany
  • CINL45200KA1986PLC051571
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorAshish Puravankara
  • DirectorNani R Choksey
  • Other registrations6 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2021PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Mar 2021
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Current status

77%61 of 79 units booked
54.5%Work done, per cost certificate

Figures as on 1 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Purva Clermont Wing ENA12807979

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 77%.

Purva Clermont Wing E: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises46%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks77%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 1 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area451 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTATA CAPITAL HOUSING FINANCE LIMITED
Secured amountRs 195.00 crore
CERSAI search filedYes
Declared on25 Nov 2025

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI2008.64
Proposed, not sanctioned2,009 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., 33/1, Ulsoor Road, Bangalore Urban, Karnataka.560042
Estimated costRs 12.98 cr
Cost incurredRs 7.08 cr
Work done54.54%
BuildingWingEstimatedIncurred
Purva Clermont Wing ENARs 8.41 crRs 4.31 cr
-NARs 4.57 crRs 2.77 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIngrain
EngineerSumit Ghogale
Chartered AccountantVDSR & Co LLP
PartnerRole in project
Puravankara Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (RERA) - Wing E Architect Certificate- Sep 25.pdf1 Dec 2025
Withdrawal Update Form 2File: FORM-2, EC_PURVA CLERMONT_WING_E_FY24-25_Q2.pdf1 Dec 2025
Withdrawal Update Form 3File: Purva Clermont RERA Wing E (2).pdf1 Dec 2025
Layout approvalFile: Site Plan Clermont Page 5.pdf30 Aug 2025
Layout approvalFile: Site Plan Clermont Page 1.pdf30 Aug 2025
Layout approvalFile: Site Plan Clermont Page 2.pdf30 Aug 2025
Layout approvalFile: Site Plan Clermont Page 3.pdf30 Aug 2025
Layout approvalFile: Site Plan Clermont Page 4.pdf30 Aug 2025
Building plan approvalFile: Wing E Clermont.pdf30 Aug 2025
Layout approvalFile: Site Plan Clermont Page 5.pdf30 Aug 2025
Withdrawal Update Form 1File: Architect Certificate Clermont Wing E-Jun25.pdf1 Aug 2025
Withdrawal Update Form 2File: Clermont Wing E Engineer Certificate Jun25.pdf1 Aug 2025
Withdrawal Update Form 3File: Purva Clermont RERA Form 3 Mar 25 Wing E.pdf1 Aug 2025
Form 1File: Wing E Form 1.pdf9 Jun 2025
Form 2File: Wing E Form 2.pdf9 Jun 2025
Form 3File: Wing E Form 3.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Wing E.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: NA.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-01-10-2024.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-31-03-2024.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Wing E.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-31-12-2023.pdf14 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-04-07-2022 final (1).pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Clermont-Wing-E_Form-3_sd.pdf2 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Purva Clermont Wing E Form 5.pdf2 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2386578_FurtherCC_signed.pdf25 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-04-04-2022.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-04-04-2022.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-04-04-2022.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (RERA) - Wing E Architect Certificate-Phase-04-04-2022.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 Form 1 (RERA) - Wing E.pdf10 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf6 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3, CA Clermont E-Q1.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3, CA Clermont E-Q2_compressed.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3, CA Clermont E-Q3-21-22.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3, CA Clermont E-Q4-21-22.pdf17 Feb 2023
Details of encumbrancesFile: Encumbrance Final 1.pdf24 Jan 2023
Details of encumbrancesFile: Encumbrance final 2.pdf24 Jan 2023
Details of encumbrancesFile: Encumbrance final 3.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-Clermont -WING-E-1A FY 2021-22_compressed.pdf12 Dec 2022
OtherFile: RERA - Clermont Wing E - 1ST PODIUM FLOOR PLAN-new.pdf9 Dec 2022
OtherFile: RERA - Clermont Wing E - TYPICAL-1ST TO 7TH FLOOR PLAN new.pdf9 Dec 2022
OtherFile: Drawing 1 Layout.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing E Form -3, Chartered Accountant (QU) Clermont E.pdf16 Sep 2022
Declaration in FORM BFile: Purva Clermont Wing E (Form B).pdf22 Feb 2021
OtherFile: Promoter Declaration (Wing E - Bank Account Name).pdf22 Feb 2021
OtherFile: Promoter Declaration (Wing E - Modification of Plan).pdf22 Feb 2021
Building plan approvalFile: Purva Clermont (Site Plan).pdf21 Feb 2021
PAN CardFile: PL PAN.pdf21 Feb 2021
Copy of the legal title reportFile: Purva Clermont (Updated Title Certificate).pdf21 Feb 2021
Details of encumbrancesFile: Purva Clermont (CERTIFICATE OF REGISTRATION OF CHARGE).PDF21 Feb 2021
Details of encumbrancesFile: Purva Clermont (Mortgage).pdf21 Feb 2021
Copy of Layout Approval (in case of layout)File: Purva Clermont (Site Plan).pdf21 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: Purva Clermont (Site Plan).pdf21 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: Purva Clermont CC.pdf21 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (PC Wing E).pdf21 Feb 2021
Proforma of Allotment letterFile: Agreement to Sell (Purva Clermont).pdf21 Feb 2021
Proforma of Allotment letterFile: Purva Clermont Allotment Letter.pdf21 Feb 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Provident Sunworth INice Mysore Road Venkatapura Kengeri Hobli Bengaluru1,440CompletedNov 2015Nov 2015

How this compares with Mumbai Suburban

77%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Purva Clermont Wing E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar Taluk, Deonar Village6,700+ in Mumbai Suburban

Builder: Puravankara Limited

Puravankara Limited has 7 registrations on MahaRERA, including Purva Aspire and Purva Clermont Wing A. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Purva Clermont Wing E is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Purva Clermont Wing E?

The registered promoter entity is Puravankara Limited, a company as per the filing. Its CIN L45200KA1986PLC051571 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Purva Clermont Wing E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Purva Clermont Wing E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Purva Clermont Wing E?

The professionals named in the filing: Architect: Ingrain; Engineer: Sumit Ghogale; Chartered Accountant: VDSR & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Purva Clermont Wing E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Purva Clermont Wing E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Purva Clermont Wing E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.