Home / Browse projects / Nashik, Maharashtra / PURPLE AASHRAY APARTMENT

Completed No litigation declared Residential / Group Housing project

PURPLE AASHRAY APARTMENT

By KIRAN JAYANTIBHAI PATEL

RG-MH-33702 · RERA P51600050208 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

PURPLE AASHRAY APARTMENT is a Residential / Group Housing project by KIRAN JAYANTIBHAI PATEL in Nashik, Maharashtra, registered with MahaRERA as P51600050208 on 27 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NamePURPLE AASHRAY APARTMENT
  • TypeResidential / Group Housing
  • Location
    • PIPELINE ROAD
    • SATPUR
    • Nashik
    • 422007
  • Pincode422007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600050208
  • ReraGenie IDRG-MH-33702

Builder

  • NameKIRAN JAYANTIBHAI PATEL
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Mar 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PURPLE AASHRAY APARTMENTNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

PURPLE AASHRAY APARTMENT: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Open Space33

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area283 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
RITESHKUMAR R ARORANashik (M Corp.)Nashik
SUPRIYA RITESH ARORANashik (M Corp.)Nashik

Approvals and building plan

Permissible FSI893.56
Proposed, not sanctioned894 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANGAPUR ROAD, NASHIK

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT A PAWAR
EngineerROHAN K GUMARE
Chartered AccountantCA RASHMI LONIKAR
PartnerRole in project
KIRAN JAYANTIBHAI PATEL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Apr 2025

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Inventory 31-03-2025.pdf2 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC.pdf1 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024.pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q2.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q3.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q2.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q3.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q2.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q3.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory 24-25 Q2.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory 24-25 Q3.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Q4.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Q1.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q4.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q1.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate as on 01 01 24.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engine certificate till 02 01 2024.pdf19 Feb 2024
Disclosure of sold/ booked inventoryFile: signed Sold unsold inventory till dec 23.pdf19 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: both signed Form 3 CA certificate Dec 23 QTR compressed.pdf19 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf13 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-03-2023.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIGNED ENGG REPORT JUN 23.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-03-2023 form 3 signed_compressed.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed form 3 30-06-2023.PDF11 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A RERA.pdf25 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Undertaking on promoter letterhead purple aashray.pdf3 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration RERA Format A.pdf20 Feb 2023
Proforma of Agreement for saleFile: 11-02-2023 signed with clause MODEL DRAFT COPY.pdf11 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 11-2-2023 signed Bank Account Rectification For RERA.pdf11 Feb 2023
Deviation Report with respect to model copy of AgreementFile: 11-2-2023 DEVIATION COMPRESSEDmaharera pdf.pdf11 Feb 2023
Layout approvalFile: 4-2-2023 MANDATORY DOCUMENT.pdf4 Feb 2023
Copy of Layout Approval (in case of layout)File: 4-2-2023 MANDATORY DOCUMENT.pdf4 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 ARCHITECT CERTIFICATE .pdf4 Feb 2023
CERSAI detailsFile: 4-2-2023 CERSAI DECLARATION.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4-2-2023 FORM 3 SIGNED PURPLE AASHRAY.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 LAND OWNER PURPLE SIGNED.PDF4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: new directors Rera Disclosure.pdf4 Feb 2023
Building plan approvalFile: 19 Purple Aashray Building Approved Plan.pdf3 Feb 2023
PAN CardFile: 1 PAN Card.pdf3 Feb 2023
Copy of the legal title reportFile: 8 Title Search Purple Aashray_compressed.pdf3 Feb 2023
Details of encumbrances concerned to FinanceFile: Rera Financial Encumbrance.pdf3 Feb 2023
Details of encumbrances concerned to LegalFile: Rera Financial Encumbrance.pdf3 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 19 Purple Aashray Building Approved Plan.pdf3 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 18 Commencement Certificate.pdf3 Feb 2023
Declaration about Commencement CertificateFile: 32 द commencement .pdf3 Feb 2023
Declaration in FORM BFile: 13 Form B landowner.pdf3 Feb 2023
Proforma of Allotment letterFile: 11 ALLOTMENT_LETTER purple .pdf3 Feb 2023
Deviation Report with respect to Allotment letterFile: 36 Deviation Report RERA Allotment letter .pdf3 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PURPLEHEIGHTSNASHIK28CompletedDec 2022May 2021

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PURPLE AASHRAY APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATPUR4,100+ in Nashik

2 kmPURPLE AASHRAY APARTMENTCompleted 153Lapsed / revoked 39Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: KIRAN JAYANTIBHAI PATEL

KIRAN JAYANTIBHAI PATEL has 2 registrations on MahaRERA, including PURPLEHEIGHTS and PURPLE AASHRAY APARTMENT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if PURPLE AASHRAY APARTMENT is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PURPLE AASHRAY APARTMENT?

The registered promoter entity is KIRAN JAYANTIBHAI PATEL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PURPLE AASHRAY APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PURPLE AASHRAY APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PURPLE AASHRAY APARTMENT?

The professionals named in the filing: Architect: HEMANT A PAWAR; Engineer: ROHAN K GUMARE; Chartered Accountant: CA RASHMI LONIKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PURPLE AASHRAY APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PURPLE AASHRAY APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PURPLE AASHRAY APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.