ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Purnima

Completed No litigation declared Residential / Group Housing project

Purnima

By Ami Virag Shivpuri

RG-MH-05355 · RERA P51800051454 · Last updated on MahaRERA portal: 17 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
6 of 9Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Purnima is a Residential / Group Housing project by Ami Virag Shivpuri in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051454 on 23 Jun 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 3 of the 9 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NamePurnima
  • TypeResidential / Group Housing
  • Location
    • Vithal Bhai Road
    • TPS VI
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400056
  • Pincode400056
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051454
  • ReraGenie IDRG-MH-05355

Builder

  • NameAmi Virag Shivpuri
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2023First promiseDec 2024Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed71 files

Current status

33%3 of 9 units booked
100.0%Work done, per cost certificate

Figures as on 17 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing-BNA109909

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Wing-B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area889 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Purnima Jayant BhimaniVileparleMumbai Suburban
Dipika Pratap ShroffVileparleMumbai Suburban
Ami Virag ShivpuriVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1332.64
Proposed, not sanctioned1,074 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL SHOPPING CENTRE, SIR M V ROAD, OPP GYMKHANA, ANDHERI-E, MUMBAI-400069
Estimated costRs 6.12 cr
Cost incurredRs 6.12 cr
Work done100.0%
BuildingWingEstimatedIncurred
Wing-BNARs 5.81 crRs 5.81 cr
-NARs 30.60 lakhRs 30.60 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhupendra Patrawala
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Ami Virag Shivpuri-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018156Dec 2024 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EA21022619945Dec 2024 → Dec 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The extension is being sought solely due to procedural delays in obtaining the Occupation Certificate (OC). Despite the project being substantially completed, the pending procedural approvals have impacted the formal completion timeline. Given these circumstances, we kindly request an extension until 31-12-2026 to complete the project and fulfil all regulatory requirements.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Purnima as on Dec 2025.pdf17 Mar 2026
Withdrawal Update Form 2File: Form 2 - Purnima as on Dec 2025.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3 - Purnima as on Dec 2025.pdf17 Mar 2026
Withdrawal Update Form 1File: Form 1 - Purnima as on June 2025.pdf21 Feb 2026
Withdrawal Update Form 1File: Form 1 - Purnima as on Sept 2025.pdf21 Feb 2026
Withdrawal Update Form 1File: Form 1 - Purnima as on Dec 2025.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 - Purnima as on June 2025.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 - Purnima as on Sept 2025.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 - Purnima as on Dec 2025.pdf21 Feb 2026
Withdrawal Update Form 3File: Form 3 - Purnima as on June 2025.pdf21 Feb 2026
Withdrawal Update Form 3File: Form 3 - Purnima as on Sept 2025.pdf21 Feb 2026
Withdrawal Update Form 3File: Form 3 - Purnima as on Dec 2025.pdf21 Feb 2026
Layout approvalFile: Plan.pdf5 Mar 2025
Building plan approvalFile: Plan.pdf5 Mar 2025
Copy of Layout Approval (in case of layout)File: Plan.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on Sep 2024.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on Dec 2024.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on Sep 2024.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on Dec 2024.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on Sep 2024.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on Dec 2024.pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on June 2024.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on June 2024.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on June 2024.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on March 2024.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on March -2024.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on March 2024.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on June 2023.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on Sep 2023.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Purnima as on Dec 2023.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on June 2023.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on September 2023.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purnima as on December 2023.pdf13 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on June-2023.pdf13 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on September-2023.pdf13 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Purnima as on December 2023.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate as on 30-06-2023.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate as on 30-09-2023.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate as on 31-12-2023.pdf11 Mar 2024
Declaration in FORM BFile: Form B.pdf1 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AMI.pdf1 Dec 2023
Declaration in FORM BFile: Form B.pdf28 Nov 2023
Declaration in FORM BFile: Form B Purnima .pdf28 Nov 2023
Disclosure of sold/ booked inventoryFile: Circular 29.pdf28 Nov 2023
Copy of the legal title reportFile: Highlighted Revised Legal Title Report - Purnima_11zon.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf12 Jun 2023
CERSAI detailsFile: Declation of Cersai.pdf12 Jun 2023
Other - LegalFile: ilovepdf_merged (3).pdf12 Jun 2023
Other - FinanceFile: ilovepdf_merged (3).pdf12 Jun 2023
Layout approvalFile: Layout Page 1.pdf2 May 2023
Building plan approvalFile: Layout Page 1.pdf2 May 2023
Building plan approvalFile: Layout Page 2.pdf2 May 2023
Copy of Layout Approval (in case of layout)File: Layout Page 1.pdf2 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 1.pdf2 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 2.pdf2 May 2023
Declaration in FORM BFile: Form B Ami.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 compressed.pdf27 Apr 2023
Declaration about Commencement CertificateFile: Format D.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Ami.pdf26 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf26 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation - Allotment.pdf26 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation - AFS.pdf26 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Apr 2023
Proforma of Agreement for saleFile: AFS_Purnima_Ami Virag Shivpuri_03042023.pdf4 Apr 2023
Proforma of Allotment letterFile: Allotment Letter_Deviation_Purnima_Ami Virag Shivpuri_03042023.pdf4 Apr 2023
PAN CardFile: Ami Virag Shivpuri PAN.pdf3 Apr 2023

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Purnima on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TPS VI6,700+ in Mumbai Suburban

2 kmPurnimaCompleted 141Lapsed / revoked 71Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 355 registered projects within 2 km.

Builder: Ami Virag Shivpuri

Ami Virag Shivpuri has 1 registration on MahaRERA, including Purnima. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Purnima is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Purnima?

The registered promoter entity is Ami Virag Shivpuri, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Purnima?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Purnima?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Purnima?

The professionals named in the filing: Architect: Bhupendra Patrawala; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Purnima?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Purnima. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Purnima to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.