Home / Browse projects / Mumbai Suburban, Maharashtra / AJMERA SHRINGAAR
AJMERA SHRINGAAR
RG-MH-06341 · RERA P51800053464 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 4 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AJMERA SHRINGAAR is a Others project by H J CORPORATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053464 on 6 Nov 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 4 of the 90 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameAJMERA SHRINGAAR
- TypeOthers
- Location
- ANSARI ROAD
- VILEPARLE WEST MUMBAI
- Vileparle
- Andheri
- Mumbai Suburban
- 400056
- Pincode400056
- RERA no.P51800053464
- ReraGenie IDRG-MH-06341
Builder
- NameH J CORPORATION
- Entity typePartnership
- PartnersHARSH JASMIN AJMERA, JESAL MANISH AJMERA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Nov 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed111 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AJMERA SHRINGAAR - A WING | NA | 15 | 12 | 45 | 6 | 51 |
| AJMERA SHRINGAAR- B WING | NA | 14 | 12 | 36 | 3 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.
AJMERA SHRINGAAR - A WING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
AJMERA SHRINGAAR- B WING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed133
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| AJMERA SHRINGAAR - A WING | 48 | 48 |
| AJMERA SHRINGAAR- B WING | 85 | 85 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PARLE NANDANVAN CHSL | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AJMERA SHRINGAAR - A WING | NA | Rs 27.50 cr | Rs 16.42 cr |
| AJMERA SHRINGAAR- B WING | NA | Rs 27.50 cr | Rs 16.42 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PATIDAR ALLIANCE |
| Engineer | J W CONSULTANTS LLP |
| Engineer | RAKESH KUMAR SINGH |
| Chartered Accountant | KAILASH SHINARE |
| Chartered Accountant | D. S. MADHAVANI & CO. |
| Partner | Role in project |
|---|---|
| H J CORPORATION | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 512/2022 | City Civil Court | Closed |
| 22/2023 | Bombay High Court | Closed |
| 4992/2023 | Bombay High Court | Closed |
| 512/2022 | Civil Court, Dindoshi | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC.pdf | 15 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A HJC.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form - 1 Architect Certificate.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: Form - 2 AS.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: Form3 - HJC.pdf | 16 Apr 2026 |
| Form 1File: Form-1.pdf | 20 Jan 2026 |
| Form 2File: Form-2.pdf | 20 Jan 2026 |
| Form 3File: Form 3 - 31122025.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory as on 31122025.pdf | 20 Jan 2026 |
| Form 1File: Form 1 HJC.pdf | 23 Oct 2025 |
| Form 2File: Form 2 - HJC.pdf | 23 Oct 2025 |
| Form 3File: Form 3 - 01072025 to 30092025.pdf | 23 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory - HJC.pdf | 23 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 5 -2023-2024.pdf | 7 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 5 - 2024-2025.pdf | 7 Oct 2025 |
| Form 5 (FY 2024-2025)File: HJ Form 5.pdf | 30 Sep 2025 |
| Form 5 (FY 2023-2024)File: FORM-5.pdf | 29 Sep 2025 |
| Form 1File: Form 1- Architect Certificate.pdf | 14 Aug 2025 |
| Form 2File: Form 2 - Engineer Certificate.pdf | 14 Aug 2025 |
| Form 3File: Ashjit CA Certificate 30062025.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - 30062025.pdf | 14 Aug 2025 |
| Form 1File: Form 1.pdf | 19 Jun 2025 |
| Form 2File: Form 2 H J Corporation.pdf | 19 Jun 2025 |
| Form 3File: Form 3.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory.pdf | 19 Jun 2025 |
| Form 1File: Form - 1 Ajmera Shringaar.pdf | 19 Jun 2025 |
| Form 2File: Form 2.pdf | 19 Jun 2025 |
| Form 3File: FORM 3.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Spold and Booked Inventory - 31032024.pdf | 19 Jun 2025 |
| Form 1File: Form - 1 Architect Certificate.pdf | 19 Jun 2025 |
| Form 2File: Form - 2 April to june.pdf | 19 Jun 2025 |
| Form 3File: FORM 3.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory - 30062024.pdf | 19 Jun 2025 |
| Form 1File: Form 1 Jul to Sep.pdf | 19 Jun 2025 |
| Form 2File: Form - 2 July to sept.pdf | 19 Jun 2025 |
| Form 3File: FORM 3 H J Sept 2024.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory - 30092024.pdf | 19 Jun 2025 |
| Form 1File: Form 1 Oct to Dec.pdf | 19 Jun 2025 |
| Form 2File: Form 2 - H J Corporation.pdf | 19 Jun 2025 |
| Form 3File: HJ CA Certificate Oct 2024 to Dec 2024.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory - 31122024.pdf | 19 Jun 2025 |
| Form 1File: Form 1.pdf | 19 Jun 2025 |
| Form 2File: Form - 2.pdf | 19 Jun 2025 |
| Form 3File: Form - 3.pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory - 31032025.pdf | 19 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ashjit.pdf | 6 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HJ CA Certificate.pdf | 6 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Ashjit.pdf | 6 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Ashjit.pdf | 6 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H J Corporation.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2 July to sept.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A H J Corporation.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HJ CA Certificate Oct 2024 to Dec 2024.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jul to Sep.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct to Dec.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 April to june.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 July to sept.pdf | 13 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A July to sept.pdf | 13 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A April to june.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01042024 to 30062024.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01042024 to 30062024.pdf | 9 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H J June 2024.pdf | 4 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H J Sept 2024.pdf | 4 Jan 2025 |
| Proforma of Agreement for saleFile: Ajmera Shringaar FInal Draft of Agreement.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ajmera Shringaar.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 H J Corporation.pdf | 14 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A H J Corporation.pdf | 14 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Ajmera Shringaar.pdf | 11 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Ajmera Shringaar.pdf | 11 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OF H J CORP.pdf | 3 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 H J Corporation.pdf | 7 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A H J Corporation.pdf | 7 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 7 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf | 30 Oct 2023 |
| Other - FinanceFile: Bank Details.pdf | 27 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Letter-Legal_page-0001.pdf | 18 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances Letter-Legal_page-0001.pdf | 18 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in Other Real Estate Organization.pdf | 18 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- All 111 filed documents as one ZIP, foldered, with a manifest
Keep AJMERA SHRINGAAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILEPARLE WEST MUMBAI6,700+ in Mumbai Suburban
CHANDAK VANSHAM
CHANDAK REALTORS PRIVATE LIMITED
AJOD ONE
AJOD REALTY LLP
GAUTAM DHAN
NEW INDIA CONSTRUCTIONS
Imperial Landmark
Neminath and Disha Realtors
PINAL EVANA
Pinal Realty LLP
AVANT PARK WEST
M/s. Kratee Infracon Pvt. Ltd.
See every Mumbai Suburban project, with the district possession charts
Builder: H J CORPORATION
H J CORPORATION has 1 registration on MahaRERA, including AJMERA SHRINGAAR. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if AJMERA SHRINGAAR is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AJMERA SHRINGAAR?
The registered promoter entity is H J CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AJMERA SHRINGAAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AJMERA SHRINGAAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AJMERA SHRINGAAR?
The professionals named in the filing: Architect: PATIDAR ALLIANCE; Engineer: J W CONSULTANTS LLP; Engineer: RAKESH KUMAR SINGH; Chartered Accountant: KAILASH SHINARE; Chartered Accountant: D. S. MADHAVANI & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AJMERA SHRINGAAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback