Home / Browse projects / Mumbai Suburban, Maharashtra / CHANDAK VANSHAM
CHANDAK VANSHAM
By CHANDAK REALTORS PRIVATE LIMITED
RG-MH-31816 · RERA P51800080145 · Last updated on MahaRERA portal: 25 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDAK VANSHAM is a Residential / Group Housing project by CHANDAK REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080145 on 30 Apr 2025. Possession is promised by 31 Dec 2031. 52 of the 525 units on this registration are recorded sold or booked, and 0 of 154 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameCHANDAK VANSHAM
- TypeResidential / Group Housing
- Location
- Swami Vivekanand Road
- Vile Parle West
- Vileparle
- Andheri
- Mumbai Suburban
- 400056
- Pincode400056
- RERA no.P51800080145
- ReraGenie IDRG-MH-31816
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Apr 2025
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings14 building records
- Documents filed79 files
Current status
Figures as on 25 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PLOT A Tower 1 | NA | 26 | 17 | 42 | 0 | 42 |
| PLOT A Tower 2 | NA | 26 | 17 | 28 | 0 | 28 |
| PLOT A Tower 3 | NA | 26 | 17 | 28 | 0 | 28 |
| PLOT A Tower 4 | NA | 26 | 17 | 56 | 0 | 56 |
| PLOT A Tower 5 | NA | 26 | 17 | 52 | 0 | 52 |
| PLOT B Tower 1 | NA | 22 | 17 | 28 | 0 | 28 |
| PLOT B Tower 2 | NA | 22 | 17 | 27 | 0 | 27 |
| PLOT B Tower 3 | NA | 22 | 17 | 28 | 0 | 28 |
| PLOT B Tower 4 | NA | 22 | 17 | 56 | 0 | 56 |
| PLOT B Tower 5 | NA | 22 | 17 | 28 | 0 | 28 |
| PLOT B Tower 6 | NA | 22 | 17 | 28 | 0 | 28 |
| PLOT B Tower 7 | NA | 22 | 17 | 41 | 0 | 41 |
| PLOT B Tower 8A | NA | 22 | 17 | 42 | 0 | 42 |
| PLOT B Tower 8B | NA | 22 | 17 | 41 | 0 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building14
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Excavation, at 0%.
PLOT A Tower 10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT A Tower 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT A Tower 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT A Tower 40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT A Tower 50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 8A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PLOT B Tower 8B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed907
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| PLOT A Tower 1 | 56 | 56 |
| PLOT A Tower 2 | 55 | 55 |
| PLOT A Tower 3 | 55 | 55 |
| PLOT A Tower 4 | 56 | 56 |
| PLOT A Tower 5 | 57 | 57 |
| PLOT B Tower 1 | 70 | 70 |
| PLOT B Tower 2 | 70 | 70 |
| PLOT B Tower 3 | 70 | 70 |
| PLOT B Tower 4 | 70 | 70 |
| PLOT B Tower 5 | 70 | 70 |
| PLOT B Tower 6 | 70 | 70 |
| PLOT B Tower 7 | 70 | 70 |
| PLOT B Tower 8A | 70 | 70 |
| PLOT B Tower 8B | 68 | 68 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Nutan Jeevan Co-operative Housing Society Limited | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YMS Consultants Ltd |
| Engineer | Chirag Shah |
| Engineer | Gopal Madugula |
| Chartered Accountant | Singhvi and Singhvi |
| Partner | Role in project |
|---|---|
| CHANDAK REALTORS PRIVATE LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 220/2014 | High Court of Bombay | Pending |
| 1407/2024 | City Civil Court Dindoshi | Pending |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601533 | KUMAR DAYAL VARANDANI | CHANDAK REALTORS PRIVATE LIMITED | 20/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1-31032026.pdf | 25 Apr 2026 |
| Form 2File: Form-2-CRPL-Vansham.pdf | 25 Apr 2026 |
| Form 3File: Form 3-March 26-Vansham-Compressed.pdf | 25 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold-Vansham-31032026.pdf | 25 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-Chandak Vansham-2025-26.pdf | 23 Apr 2026 |
| Form 1File: Kripa Nagar Form 1-31-12-2025.pdf | 21 Jan 2026 |
| Form 2File: Form 2--Vansham project-Dec 25.pdf | 21 Jan 2026 |
| Form 3File: Chandak Vansham Form 3 Signed.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Chandak Vansham-Sold unsold-31-12-2025.pdf | 21 Jan 2026 |
| Form 1File: Form 1.pdf | 17 Oct 2025 |
| Form 2File: CRPL KRIPA FORM 2.pdf | 17 Oct 2025 |
| Form 3File: Vansham-Form 3-30092025.pdf | 17 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Chandak Vansham-sold and unsold-30092025.pdf | 17 Oct 2025 |
| Form 1File: Kripa nagar Form 1.pdf | 20 Jul 2025 |
| Form 2File: Form-2 -Chandak Vansham June -25_-final.pdf | 20 Jul 2025 |
| Form 3File: New Form-3 _MahaRERA Kripanagar updated JUN25.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Vansham-Sold unsold.pdf | 20 Jul 2025 |
| Other - TechnicalFile: Declaration about floors-Kripa nagar-18042025.pdf | 18 Apr 2025 |
| Other - TechnicalFile: Kripa Nagar-Declaration about plot area alongwith dd receipt-17042025.pdf | 17 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Kripa Nagar-FirstCC.pdf | 4 Apr 2025 |
| Declaration about Commencement CertificateFile: Kripa Nagar-Revised declaration about CC-17042025.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-Engineer Certificate-Chandak Vansham-25032025.pdf | 29 Mar 2025 |
| Building plan approvalFile: Kripanagar LOI-31052024.pdf | 28 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATEForm 1-Chandak Vansham-28032025.pdf | 28 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED FORM 3-23042025-Chandak Vansham-RERA Application.pdf | 28 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Kripanagar LOI-31052024.pdf | 28 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report to AFS-Chandak Vansham-28032025-compressed-PV.pdf | 28 Mar 2025 |
| Proforma of Agreement for saleFile: RERA AFS - Nutan Jeevan RERA Purposes-28032025-Clean-PV.pdf | 28 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest-Aditya sir-Chandak Vansham.pdf | 28 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Merged-Finance and litigation encrumbances-Chandak Vansham.pdf | 27 Mar 2025 |
| Proforma of Allotment letterFile: Allotment Letter -Chandak Vansham-28032025 -PV.pdf | 27 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A(about Bank Details)-Chandak Vansham.pdf | 27 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report to allotment letter-Chandak Vansham -PV version.pdf | 27 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Merged-Finance and litigation encrumbances-Chandak Vansham.pdf | 27 Mar 2025 |
| Other - FinanceFile: Letter from Architect Area Statement Revised on 18042025.pdf | 27 Mar 2025 |
| Other - TechnicalFile: Chandak Vansham-One plot-04042025.pdf | 27 Mar 2025 |
| Other - TechnicalFile: Declaration about FSI-CHnadak Vansham-04042025.pdf | 27 Mar 2025 |
| Other - TechnicalFile: Letter from Architect Area Statement Revised on 18042025.pdf | 27 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest-Abhay sir-Chandak Vansham.pdf | 27 Mar 2025 |
| Declaration in FORM BFile: Decalaration-Form B-By Promoter-Chandak Vansham-26032025.pdf | 26 Mar 2025 |
| Copy of the legal title reportFile: RERA Title Report 25032025-uploaded.pdf | 25 Mar 2025 |
| PAN CardFile: CRPL PAN Card.pdf | 22 Mar 2025 |
| CERSAI detailsFile: Megered Cersai-Chandak Vansham.pdf | 22 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Kripa Nagar-Disclosure of secured-unsceured alongwith CA certificate.pdf | 22 Mar 2025 |
| Building plan approvalFile: Plot B-Ground Floor Plan.pdf | 21 Mar 2025 |
| Building plan approvalFile: Car Parking Plan-merged.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-1st to 4th Floor Plan.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-5th to 9th Floor Plan.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-10th to 14th Floor Plan.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-Terrace Plan-after 14th floor plan.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-Diagram-1 to 4.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-Diagram-5 to 8.pdf | 21 Mar 2025 |
| Building plan approvalFile: Plot B-Section Plans.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-Section Plans.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-Diagram-5 to 8.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-Diagram-1 to 4.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-Terrace Plan-after 14th floor plan.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-10th to 14th Floor Plan.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-5th to 9th Floor Plan.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-1st to 4th Floor Plan.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot B-Ground Floor Plan.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Car Parking Plan-merged.pdf | 21 Mar 2025 |
| Layout approvalFile: Common-Layout Approval - FSI Sheet.pdf | 20 Mar 2025 |
| Building plan approvalFile: 20250318 Kripa Nagar PDF letter.pdf | 20 Mar 2025 |
| Building plan approvalFile: Plot A-Ground Plan.pdf | 20 Mar 2025 |
| Building plan approvalFile: Plot A-car parking plans.pdf | 20 Mar 2025 |
| Building plan approvalFile: Plot A-1st to 6th Floor Plan.pdf | 20 Mar 2025 |
| Building plan approvalFile: Plot A- 7th to 12th Floor plan.pdf | 20 Mar 2025 |
| Building plan approvalFile: Plot A-13 and 14th floor plan with all diagram.pdf | 20 Mar 2025 |
| Building plan approvalFile: Plot A-Terrace Plan and Sections.pdf | 20 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Common-Layout Approval - FSI Sheet.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot A-Terrace Plan and Sections.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot A-13 and 14th floor plan with all diagram.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot A- 7th to 12th Floor plan.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot A-1st to 6th Floor Plan.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot A-car parking plans.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot A-Ground Plan.pdf | 20 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 20250318 Kripa Nagar PDF letter.pdf | 20 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B -letter from Bank.pdf | 20 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHANDAK VANSHAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vile Parle West6,700+ in Mumbai Suburban
AJOD ONE
AJOD REALTY LLP
GAUTAM DHAN
NEW INDIA CONSTRUCTIONS
AJMERA SHRINGAAR
H J CORPORATION
Imperial Landmark
Neminath and Disha Realtors
PINAL EVANA
Pinal Realty LLP
AVANT PARK WEST
M/s. Kratee Infracon Pvt. Ltd.
See every Mumbai Suburban project, with the district possession charts
Builder: CHANDAK REALTORS PRIVATE LIMITED
CHANDAK REALTORS PRIVATE LIMITED has 5 registrations on MahaRERA, including Chandak Treesourus and Chandak Highscape City 1A. Its filings disclose 10 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if CHANDAK VANSHAM is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDAK VANSHAM?
The registered promoter entity is CHANDAK REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDAK VANSHAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CHANDAK VANSHAM?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CHANDAK VANSHAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDAK VANSHAM?
The professionals named in the filing: Architect: YMS Consultants Ltd; Engineer: Chirag Shah; Engineer: Gopal Madugula; Chartered Accountant: Singhvi and Singhvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDAK VANSHAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback