ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Pune Wakad Project

Registered No litigation declared Residential / Group Housing project

Pune Wakad Project

By Lodha Developers Limited

RG-MH-31358 · RERA P52100079692 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2031Possession promisedmoved 12 months from the original
3 of 27Construction stages doneacross 3 buildings; furthest along: Plinth, 70%
490 of 490Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Pune Wakad Project is a Residential / Group Housing project by Lodha Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100079692 on 20 Mar 2025. Possession is promised by 29 Jun 2031. The completion date has moved by 12 months from the original filing. 0 of the 490 units on this registration are recorded sold or booked, and 3 of 27 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePune Wakad Project
  • TypeResidential / Group Housing
  • Location
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079692
  • ReraGenie IDRG-MH-31358

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • DirectorWTDRajendra Narpatmal Lodha
  • WtdRaunika Malhotra
  • MdAbhishek Mangalprabhat Lodha
  • DirectorsMukund Manohar Chitale, Rajeev Bakshi, Harita Gupta, Rajinder Pal Singh, Ashwani Kumar, LEE ANTHONY POLISANO, Shaishav Dharia
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredMar 2025First promiseJun 2030Revised toJun 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Mar 2025
  • Promised completion29 Jun 2031
  • Revised completionRevised to 29 Jun 2031 (originally 30 Jun 2030)
  • Buildings3 building records
  • Documents filed90 files

Current status

0%0 of 490 units booked
9.5%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T-1NA38351560156
T-2NA38351670167
T-3NA38351670167

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 70%.

T-119%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
T-217%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
T-315%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth35%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1038

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,038
Closed/Covered330
Separate Building708
BuildingClosed/CoveredSeparate BuildingTotal
T-13300330
T-20332332
T-30376376

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area19,487 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jan 2026
LandownerVillageDistrict
GOELPUSHP DEVELOPERS LLPPune (CB)Pune
SHREE BALAJI VENTURESPune (CB)Pune
Kaluram Baban Kaspate And OTHERSPune (CB)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI80794.85
Proposed, not sanctioned80,795 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Bombay Hub, Kamla Mills Compound,Senapati Bapat Marg,Lower Parel,Mumbai 400013
Estimated costRs 295.33 cr
Cost incurredRs 27.98 cr
Work done9.47%
BuildingWingEstimatedIncurred
-NARs 182.41 crRs 17.28 cr
T-1NARs 112.92 crRs 10.70 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeepmkamble and associates
EngineerK C Shah Consultants
EngineerSaket Deodhar
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A
PartnerRole in project
Lodha Developers Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05062621243Jun 2030 → Jun 2031

Reason as filed by the promoterThe applicant promoter respectfully submits that the project has been delayed due to circumstances beyond the control of the promoter, primarily relating to issues concerning the requirement of Environmental Clearance (EC) and jurisdictional ambiguity between the Central and State authorities for granting such clearance. The project site falls within a 5-kilometre radius of PCMC Jurisdiction Zone (Critically Polluted Area), due to which clarification was required regarding whether the Environmental Clearance wsas to be granted by the Central Government or the State Government. During this peri

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601753Deepak Singh NarwariaLodha Developers Limited27/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Jun 2031

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A - Pune Wakad Project - P52100079692.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1 - Pune Wakad Project - P52100079692.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Wing C - Form1.pdf10 Feb 2026
Withdrawal Update Form 2File: New Form 2 Pune Wakad Project.pdf10 Feb 2026
Withdrawal Update Form 3File: 0900_001.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1 - Pune Wakad Project.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 - Pune Wakad Project.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 - Pune Wakad Project.pdf23 Jan 2026
Layout approvalFile: Highlighted Wakad Rera Tower 1 2 3.pdf20 Jan 2026
Building plan approvalFile: Building Plan 1.pdf20 Jan 2026
Building plan approvalFile: Building Plan 2.pdf20 Jan 2026
Building plan approvalFile: Building Plan 3.pdf20 Jan 2026
Building plan approvalFile: Building Plan 4.pdf20 Jan 2026
Building plan approvalFile: Building Plan 5.pdf20 Jan 2026
Building plan approvalFile: Building Plan 7.pdf20 Jan 2026
Building plan approvalFile: Building Plan 6.pdf20 Jan 2026
Building plan approvalFile: Building Plan 9.pdf20 Jan 2026
Building plan approvalFile: Building Plan 8.pdf20 Jan 2026
Building plan approvalFile: Building Plan 10.pdf20 Jan 2026
Building plan approvalFile: Building Plan 11.pdf20 Jan 2026
Withdrawal Update Form 1File: Wing C - Form1.pdf19 Jan 2026
Withdrawal Update Form 2File: New Form 2 Pune Wakad Project.pdf19 Jan 2026
Withdrawal Update Form 3File: 0900_001.pdf19 Jan 2026
Form 1File: Wakad Form 1.pdf15 Jan 2026
Form 2File: Wakad Form 2.pdf15 Jan 2026
Form 3File: Wakad Form 3.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 25 .pdf15 Jan 2026
Self-declaration of Quarterly ProgressFile: Wakad Plans Plan 1.pdf15 Jan 2026
OthersFile: Wakad Plans Plan 2.pdf15 Jan 2026
Form 1File: Form 1- Pune Wakad Project.pdf16 Oct 2025
Form 2File: Form 2- Pune Wakad Project.pdf16 Oct 2025
Form 3File: Form 3- Pune Wakad Project.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold -Pune Wakad Project.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Pune Wakad Project.pdf13 Oct 2025
Form 2A (FY 2024-2025)File: Pune Wakad Project - P52100079692 - Form 2A.pdf25 Aug 2025
Form 1File: Form -1 Wakad- June-25.pdf18 Jul 2025
Form 2File: Form -2 Wakad- June-25.pdf18 Jul 2025
Form 3File: Form -3 Wakad- June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold -ok.pdf18 Jul 2025
Form 1File: Form 1-Pune Wakad.pdf1 Jul 2025
Form 2File: Form 2-Pune Wakad.pdf1 Jul 2025
Form 3File: Form 3- Wakad project.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold -Wakad project.pdf1 Jul 2025
Building plan approvalFile: scan_compressed_rotated.pdf29 Mar 2025
Building plan approvalFile: scan_compressed_rotated.pdf29 Mar 2025
Building plan approvalFile: scan_compressed_rotated.pdf29 Mar 2025
Building plan approvalFile: scan_compressed_rotated.pdf29 Mar 2025
Building plan approvalFile: scan_compressed_rotated.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: scan_compressed_rotated.pdf29 Mar 2025
Copy of the legal title reportFile: RERA New Format-Wakad, Pune.pdf18 Mar 2025
Layout approvalFile: Techincal Land Declaration wakad.pdf17 Mar 2025
Copy of Layout Approval (in case of layout)File: Techincal Land Declaration wakad.pdf17 Mar 2025
Other - LegalFile: 1_POA_Goelpushp to MDL_Registered_13032025 - converted.pdf17 Mar 2025
Other - LegalFile: Leagl Declaration wakad.pdf17 Mar 2025
Other - LegalFile: 3_POA_Goelpushp to MDL_Registered_13032025 - converted.pdf17 Mar 2025
Other - LegalFile: 2_POA_Goelpushp to MDL_Registered_13032025 - converted.pdf17 Mar 2025
Other - FinanceFile: Fina Declaration Bank.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 0900_001.pdf10 Mar 2025
Building plan approvalFile: Section Plan - converted (2).pdf23 Feb 2025
Building plan approvalFile: 3 (1) - converted.pdf23 Feb 2025
Building plan approvalFile: 4 (1) - converted-rotated.pdf23 Feb 2025
Declaration in FORM BFile: Form B Wakad Rs 500 MDL.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Section Plan - converted (2).pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 (1) - converted.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 (1) - converted-rotated.pdf23 Feb 2025
Proforma of Agreement for saleFile: AFS wakad.pdf23 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Pune Wakad.pdf19 Feb 2025
Layout approvalFile: layout for Rera-compressed.pdf14 Feb 2025
Copy of Layout Approval (in case of layout)File: layout for Rera-compressed.pdf14 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 20250204182459.pdf14 Feb 2025
Building plan approvalFile: Typical Floor - converted (1).pdf3 Feb 2025
Details of encumbrances concerned to FinanceFile: Fiannce Encum.pdf3 Feb 2025
Details of encumbrances concerned to FinanceFile: Legal Encum.pdf3 Feb 2025
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing C - Form1.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Form 2 Pune Wakad Project.pdf3 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC (1).pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor - converted (1).pdf3 Feb 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Lodha Belmondo - Tower 31P52100020172Belmondo, Pune85Mar 2019CompletedMar 2025Apr 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pune Wakad Project on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmPune Wakad ProjectCompleted 128Lapsed / revoked 48Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 264 registered projects within 2 km.

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pune Wakad Project is delayed beyond 29 Jun 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pune Wakad Project?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pune Wakad Project?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pune Wakad Project?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pune Wakad Project?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pune Wakad Project?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeepmkamble and associates; Engineer: K C Shah Consultants; Engineer: Saket Deodhar; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pune Wakad Project?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pune Wakad Project. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pune Wakad Project to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.