Home / Browse projects / Mumbai Suburban, Maharashtra / Pruthvi Park View

Completed No litigation declared Residential / Group Housing project

Pruthvi Park View

By Pruthvi Enterprise

RG-MH-58673 · RERA P51800047524 · Last updated on MahaRERA portal: 17 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Pruthvi Park View is a Residential / Group Housing project by Pruthvi Enterprise in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047524 on 7 Nov 2022. The registration is recorded completed; possession was promised by 30 Sep 2025.

At a glance

Project

  • NamePruthvi Park View
  • TypeResidential / Group Housing
  • Location
    • Park Road
    • Vile Parle East
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047524
  • ReraGenie IDRG-MH-58673

Builder

  • NamePruthvi Enterprise
  • Entity typePartnership
  • PartnersAmol Vijaykumar Rege, Binita Amol Rege
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2022PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Nov 2022
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Park View CHS LtdNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Park View CHS Ltd: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area936 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Park View Co-operative Society LimitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2528.28
Proposed, not sanctioned2,528 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNariman Point

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA N J Engineering Consultants LLP
EngineerEpicon Consultants Private Limited
Chartered AccountantAshvin Thumar and Co
PartnerRole in project
Pruthvi Enterprise-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2025

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Society Registration Certificate.pdf17 Feb 2025
Status of ConveyanceFile: Deemed Conveyance1.pdf17 Feb 2025
Status of ConveyanceFile: Deemed Conveyance2.pdf17 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Pruthvi Enterprise FORM 4.pdf23 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Parkview.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Parkview- Architect Certifiacte.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park View Form 1.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parkview Engineers Certificate.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA Certificate Parkview.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Pruthvi Parkview.PDF9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park View - Rera Certificate.PDF13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 CA Certificate.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality assurance.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-CA Certificate.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 2023-24 Pruthvi Enterprise.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Rera Certificate - Park View.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate Parkview FINAL signed.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Parkview -Q2 ' 23.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -ANJ - PARK VIEW.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (Parkview) upload.pdf8 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5- Parkview(Signed).pdf30 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Full C C.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Park View.pdf23 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pruthvi Enterprises - Form 2 - RERA Certificate.pdf23 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booking Inventory.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate Parkview Signed.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sign (1).pdf29 Jun 2023
Details of encumbrances concerned to FinanceFile: Details of Encumbrances.pdf22 Jun 2023
Details of encumbrances concerned to LegalFile: Details of Encumbrances.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineers Certificate.PDF2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-ANJ - PARK VIEW 14-03-23.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A-PARK VIEW 31-03-2023.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificate Parkview Q4 Signed.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A - Form 1 - Pruthvi Enterprise.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Park View for Q3.pdf28 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200258838768_For_Asset_Based_Search_28_01_2023_12_40_51_892.pdf28 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf28 Jan 2023
Proforma of Agreement for saleFile: PARK VIEW AGREEMENT FOR SALE 31102022.pdf31 Oct 2022
Copy of the legal title reportFile: PARK VIEW TITLE CERTIFICATE.pdf22 Oct 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf22 Oct 2022
CERSAI detailsFile: CERSAI REPORT.pdf22 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CORRECTED FORM 3.pdf22 Oct 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf22 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ON SEPAATE BANK.pdf22 Oct 2022
Deviation Report with respect to Allotment letterFile: DEVIATION SHEET.pdf22 Oct 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION SHEET.pdf22 Oct 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf12 Oct 2022
Layout approvalFile: IOD Plan.pdf23 Sep 2022
Building plan approvalFile: IOD Letter.pdf23 Sep 2022
PAN CardFile: Pruthvi Ent- PAN CARD.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: IOD Plan.pdf23 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Letter.pdf23 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Sep 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf23 Sep 2022
Declaration in FORM BFile: FORM B Declaration AFFIDAVIT.pdf23 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf23 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer's Certificate.pdf23 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Pruthvi SHAKUNShahaji Raje Marg51CompletedSep 2023Jan 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pruthvi Park View on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle East6,700+ in Mumbai Suburban

2 kmPruthvi Park ViewCompleted 142Lapsed / revoked 76Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 350 registered projects within 2 km.

Builder: Pruthvi Enterprise

PRUTHVI ENTERPRISE has 3 registrations on MahaRERA, including PRUTHVI SHAKUN and Pruthvi Park View. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Pruthvi Park View is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pruthvi Park View?

The registered promoter entity is Pruthvi Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pruthvi Park View?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pruthvi Park View?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pruthvi Park View?

The professionals named in the filing: Architect: A N J Engineering Consultants LLP; Engineer: Epicon Consultants Private Limited; Chartered Accountant: Ashvin Thumar and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pruthvi Park View?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pruthvi Park View. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pruthvi Park View to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.