Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Pruthvi Ashakiran is a Residential / Group Housing project by Pruthvi Enclave LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080110 on 29 Apr 2025. Possession is promised by 15 Aug 2028. 8 of the 28 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NamePruthvi Ashakiran
- TypeResidential / Group Housing
- Location
- T.P.S. Vile Parle No. IV & IV-A
- Vile Parle East
- Vileparle
- Andheri
- Mumbai Suburban
- 400057
- Pincode400057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800080110
- ReraGenie IDRG-MH-31775
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Apr 2025
- Promised completion15 Aug 2028
- Revised completionNone
- Buildings1 building record
- Documents filed54 files
Current status
Figures as on 11 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Pruthvi Ashakiran | NA | 9 | 8 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
Pruthvi Ashakiran: 48% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Asha Kiran Central Bank Staff Co-Op Hsg Soc Ltd | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Pruthvi Ashakiran | NA | Rs 11.00 cr | Rs 5.00 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANJ Engineering Consultants LLP Vivek Jade |
| Engineer | Epicons Consultants Pvt Ltd |
| Chartered Accountant | Ashvin Hitesh & Associates |
| Partner | Role in project |
|---|---|
| Pruthvi Enclave LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Aug 2028
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1- Pruthvi Ashakiran - 30-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1- Pruthvi Ashakiran - 30-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 - Pruthvi Ashakiran - 30-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 - Pruthvi Ashakiran - 30-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 - Pruthvi Ashakiran - 30-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 - Pruthvi Ashakiran - 30-06-2026.pdf | 11 Jul 2026 |
| Commencement certificateFile: APPROVED F C C - ASHA KIRAN.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Pruthvi Ashakiran as on Mar 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Pruthvi Ashakiran as on Mar 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Pruthvi Ashakiran as on Mar 2026.pdf | 17 Apr 2026 |
| Form 1File: Form 1 - Pruthvi Ashakiran as on Dec 2025.pdf | 20 Jan 2026 |
| Form 2File: Form 2 - Pruthvi Ashakiran as on Dec 2025.pdf | 20 Jan 2026 |
| Form 3File: Form 3 - Pruthvi Ashakiran as on Dec 2025.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Pruthvi Ashakiran as on Dec 2025.pdf | 20 Jan 2026 |
| Form 1File: Form 1 - Pruthvi Ashakiran as on Sep 2025.pdf | 17 Oct 2025 |
| Form 2File: Form 2 - Pruthvi Ashakiran as on Sep 2025.pdf | 17 Oct 2025 |
| Form 3File: Form 3 - Pruthvi Ashakiran as on Sep 2025.pdf | 17 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Pruthvi Ashakiran as on Sep 2025.pdf | 17 Oct 2025 |
| Form 1File: FORM 1 - Pruthvi Ashakiran as on June 2025.pdf | 29 Jul 2025 |
| Form 2File: Form 2 - Pruthvi Ashakiran as on June 2025.pdf | 29 Jul 2025 |
| Form 3File: Form 3 - Pruthvi Ashakiran as on June 2025.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Pruthvi Ashakiran as on June 2025.pdf | 29 Jul 2025 |
| Layout approvalFile: final page 1 pruthvi.pdf | 8 Apr 2025 |
| Building plan approvalFile: final page 1 pruthvi.pdf | 8 Apr 2025 |
| Building plan approvalFile: Sanctioned Layout_2-2.pdf | 8 Apr 2025 |
| Building plan approvalFile: Sanctioned Layout_3-3.pdf | 8 Apr 2025 |
| Building plan approvalFile: Sanctioned Layout_4-end.pdf | 8 Apr 2025 |
| PAN CardFile: Pruthvi Enclave LLP PAN Copy.pdf | 8 Apr 2025 |
| Copy of the legal title reportFile: Final Title Report- Pruthvi Ashakiran.pdf | 8 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Final Encrumbance Letter - Finance.pdf | 8 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Letter - Litigations.pdf | 8 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: final page 1 pruthvi.pdf | 8 Apr 2025 |
| Proforma of Allotment letterFile: AL_Pruthvi Ashakiran_Purthvi Enclave LLP_08032025.pdf | 8 Apr 2025 |
| Declaration in FORM BFile: FORM B - AFFIDAVIT CUM DECLARATION - PROMOTER - ASHAKIRAN.pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (12).pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Pruthvi Ashakiran 08042025.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ashakiran-sign.pdf | 8 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Asha Kiran 1st CC (1).pdf | 8 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Layout_3-3.pdf | 8 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Layout_4-end.pdf | 8 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Layout_2-2.pdf | 8 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: final page 1 pruthvi.pdf | 8 Apr 2025 |
| Declaration about Commencement CertificateFile: REVISED DECLARATION ABOUT CC.pdf | 8 Apr 2025 |
| CERSAI detailsFile: final cersai with dec- pruthvi ashakiran.pdf | 8 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Designated Bank Account.pdf | 8 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: Allotment Deviation Report (2).pdf | 8 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Final Encrumbance Letter - Finance.pdf | 8 Apr 2025 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Letter - Litigations.pdf | 8 Apr 2025 |
| Other - TechnicalFile: Annexure A - Order No 50.pdf | 8 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report -Sale Agreement - Ashakiran_11zon_removed (1)_removed.pdf | 8 Apr 2025 |
| Proforma of Agreement for saleFile: AFS_Pruthvi Asha Kiran_Purthvi Enclave LLP_17042025 (1) final.pdf | 8 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: merged annexure a- pruthvi ashakiran.pdf | 8 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- Bank Final.pdf | 8 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: disc sec unsec with end use- pruthvi ashakiran.pdf | 8 Apr 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Pruthvi Purushottam | FPS No 82 TPS II Park Road Vile Parle East | 8 | Completed | Jun 2022 | Mar 2022 |
| Sanniwas Premises Co-op Soc Ltd | By Public Road Prathana Samaj Road | 32 | Completed | Jun 2018 | Dec 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Pruthvi Ashakiran on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vile Parle East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 351 registered projects within 2 km.
Vijayraj Residency
Vijayraj Realtors
ZEE HAPPY VEENA
ZEE LIFESPACES
Romell Espalier
ROMELL REAL ESTATE PRIVATE LIMITED
ZEE SHAAN
TRISUL DEVELOPERS
SALE BUILDING 1 - CHAMUNDA CROWN AND SALE BUIL
Chamunda Builders & Developers
ARKADE PEARL 1
ARKADE DEVELOPERS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: Pruthvi Enclave LLP
Pruthvi Enclave LLP has 4 registrations on MahaRERA, including Sanniwas Premises Co-Operative Society Ltd. and PRUTHVI PURUSHOTTAM. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Pruthvi Ashakiran is delayed beyond 15 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Pruthvi Ashakiran?
The registered promoter entity is Pruthvi Enclave LLP, a partnership as per the filing. Its GSTIN 27ABWFS5373H1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Pruthvi Ashakiran?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Pruthvi Ashakiran?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Pruthvi Ashakiran?
The professionals named in the filing: Architect: ANJ Engineering Consultants LLP Vivek Jade; Engineer: Epicons Consultants Pvt Ltd; Chartered Accountant: Ashvin Hitesh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pruthvi Ashakiran?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback