Prudential 83

By KAUSTUBH DILIP NIKAM

RG-MH-68263 · RERA P52100053210 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 8 months
  • 1 extension taken
  • Rs 20.00 crore secured on the land, in favour of PIRAMAL TRUSTEESHIP SERVICES PRIVATE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedmoved 8 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 45%
56 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Prudential 83 is a Others project by KAUSTUBH DILIP NIKAM in Pune, Maharashtra, registered with MahaRERA as P52100053210 on 23 Oct 2023. Possession is promised by 28 Feb 2027. The completion date has moved by 8 months from the original filing. 4 of the 60 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NamePrudential 83
  • TypeOthers
  • Location
    • S No 121 & 122
    • Pl No 18
    • CTS No 874
    • Prudential 83 Co Op Hsg Society
    • Rambaug Colony
    • Kothrud
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053210
  • ReraGenie IDRG-MH-68263

Builder

  • NameKAUSTUBH DILIP NIKAM
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2023First promiseJun 2026Revised toFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion28 Feb 2027
  • Revised completionRevised to 28 Feb 2027 (originally 25 Jun 2026)
  • Buildings1 building record
  • Documents filed85 files

Current status

7%4 of 60 units booked
13.9%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Prudential 83NA66481260

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

Prudential 83: 22% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered71

Land and ownership16

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,065 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
Encumbrance on the landDeclared present
Charge in favour ofPIRAMAL TRUSTEESHIP SERVICES PRIVATE LIMITED
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on27 May 2026
LandownerVillageDistrict
Chetan Dnyanoba KhaladkarPune (M Corp.)Pune
Sukhdeo Vitthal ChavanPune (M Corp.)Pune
Shantanu Sukhdeo ChavanPune (M Corp.)Pune
Prasad Sukhdeo ChavanPune (M Corp.)Pune
Sunita Sukhdeo ChavanPune (M Corp.)Pune
Nalini Ganesh LimayePune (M Corp.)Pune
Harshad Sukhdeo ChavanPune (M Corp.)Pune
Omkar Shashikant KinikarPune (M Corp.)Pune
Sharadini Shashikant KinikarPune (M Corp.)Pune
Nitin Vasantrao KashidPune (M Corp.)Pune
Late Mrs Aashalata Ramrao SalunkhePune (M Corp.)Pune
Late Shobha Ramrao SalunkhePune (M Corp.)Pune
Rajkumar Vitthalrao GaikwadPune (M Corp.)Pune
Meenakshi Rajkumar GaikwadPune (M Corp.)Pune
Ketan Dnyanoba KhaladkarPune (M Corp.)Pune
Prudential 83 Co Op Hsg Society LtdPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1596.19
Proposed, not sanctioned1,596 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 4/1, Lal Bahadur Shastri Road,Navi Peth, Pune 30
Estimated costRs 24.50 cr
Cost incurredRs 3.40 cr
Work done13.87%
BuildingWingEstimatedIncurred
Prudential 83NARs 23.66 crRs 3.40 cr
-NARs 83.55 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajsing Rajput
EngineerAjit s Kulkarni
Chartered AccountantAghav Wavhal & Associates
Chartered AccountantKailash R Mundada & Co
PartnerRole in project
KAUSTUBH DILIP NIKAM-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025166Jun 2026 → Feb 2027

Reason as filed by the promoterAs per section 6 of the Real Estate (Regulation and Development) Act (RERA), force majeure is a situation where a natural disaster or other calamity affects the regular development of a real estate project Force majeure is a French term that means "superior force". In legal terms, it's a contract provision that allows parties to not fulfill their contractual obligations when unforeseen events prevent them from doing so. In our case, We have received the excavation permission 1-month delayed from application submission to the concerned government department. As permission was received on 25/03/

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf27 May 2026
Withdrawal Update Form 1File: FINAL ARCHITECT FORM 1 31_3_26.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31_3_26 FINAL.pdf27 May 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate_compressed.pdf27 May 2026
Withdrawal Update Form 3File: FORM 3 CA Certificate_compressed.pdf27 May 2026
Form 1File: FINAL ARCHITECT FORM 1 31_3_26.pdf26 May 2026
Form 2File: Form 2 Engineer Certificate 31_3_26 FINAL.pdf26 May 2026
Form 3File: Form 3 CA Certificate - 31_3_26.pdf26 May 2026
Disclosure of Sold and Booked InventoryFile: Updated and Final Disclosure of Sold and Unsold Inventory till 31_03_26 -FINAL.pdf26 May 2026
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Progress 31-03-2026.pdf26 May 2026
Form 1File: FINAL Architect Certificate form 1 for 31-12-25.pdf17 Feb 2026
Form 2File: FINAL Form 2 Engineer Certificate for 31-12-25_organized.pdf17 Feb 2026
Form 3File: FINAL Signed Form 3 CA Certifed till 31-12-25_11zon.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Final Disclosure of Sold and Unsold Inventory till 31-12-25 - Revised.pdf17 Feb 2026
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Progress 31-12-25.pdf17 Feb 2026
Form 1File: Form 1.pdf21 Nov 2025
Form 2File: Form 2.pdf21 Nov 2025
Form 3File: Signed Form 3.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf21 Nov 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Progress.pdf21 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed form 3 Q3 24-25.pdf22 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certiifcate.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Data.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold.pdf18 Apr 2025
Details of encumbrances concerned to FinanceFile: Final Encumbrance Certificate.pdf24 Mar 2025
Details of encumbrances concerned to LegalFile: Final Encumbrance Certificate.pdf24 Mar 2025
Proforma of Agreement for saleFile: DRAFT OF AGREEMENT TO SELL FLAT.pdf24 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A on Vijayshree Developers Letterhead.pdf1 Mar 2025
Declaration in FORM BFile: Form B.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Form 1.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VD Draft RERA FORM 3_.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form .pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Updated Disclosure of Sold and Unsold Inventory .pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sold-Unsold Status for RERA .pdf18 Dec 2024
CERSAI detailsFile: CERSAI Details DT .pdf18 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Scan_Form 2A_FY 2023-24.pdf18 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form B Declaration of RERA Bank Ac on Bank Letterhead_.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed_Form 5_For FY 2023-24.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 23.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 24.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 24.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Dec 23.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 March 24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 June 24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Sept 24.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Updated Form 3_compressed.pdf18 Oct 2023
CERSAI detailsFile: No Encumburrance Certificate.PDF16 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200283634929_For_Asset_Based_Search_16_10_2023_13_49_10_355.pdf16 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account details and declaration.pdf16 Oct 2023
Layout approvalFile: Sanction Plan 1 compressed.pdf10 Oct 2023
Layout approvalFile: Sanction Plan 2 compressed.pdf10 Oct 2023
Layout approvalFile: Sanction Plan 3 compressed.pdf10 Oct 2023
Building plan approvalFile: Sanction Plan 1 compressed.pdf10 Oct 2023
Building plan approvalFile: Sanction Plan 2 compressed.pdf10 Oct 2023
Building plan approvalFile: Sanction Plan 3 compressed.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Sanction Plan 1 compressed.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Sanction Plan 2 compressed.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Sanction Plan 3 compressed.pdf10 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1 compressed.pdf10 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2 compressed.pdf10 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3 compressed.pdf10 Oct 2023
Copy of the legal title reportFile: Legal Title Report 11zon.pdf25 Sep 2023
Proforma of Agreement for saleFile: SAMPLE OF AGREEMENT TO SELL FLAT - PRUDENTIAL 83 (2).pdf25 Sep 2023
PAN CardFile: Kaustubh nikam PAN Card.pdf29 Aug 2023
Details of encumbrances concerned to FinanceFile: No Encumburrance Certificate.PDF29 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumburrance Certificate.PDF29 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Prudential Commencement Certificate.pdf29 Aug 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.PDF29 Aug 2023
Declaration in FORM BFile: Developer.PDF29 Aug 2023
Declaration in FORM BFile: Landowner.PDF29 Aug 2023
Declaration in FORM BFile: Prudential Power of Attorney compressed.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf29 Aug 2023

How this compares with Pune

7%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 8 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prudential 83 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothrud13,700+ in Pune

2 kmPrudential 83Completed 97Lapsed / revoked 50Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 301 registered projects within 2 km.

Builder: KAUSTUBH DILIP NIKAM

KAUSTUBH DILIP NIKAM has 2 registrations on MahaRERA, including CHAFA-CHAMPAKAM and Prudential 83. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Prudential 83 is delayed beyond 28 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prudential 83?

The registered promoter entity is KAUSTUBH DILIP NIKAM, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prudential 83?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prudential 83?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prudential 83?

The professionals named in the filing: Architect: Rajsing Rajput; Engineer: Ajit s Kulkarni; Chartered Accountant: Aghav Wavhal & Associates; Chartered Accountant: Kailash R Mundada & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prudential 83?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prudential 83. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prudential 83 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.