ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Prozone Palms

Registered Litigation declared Residential / Group Housing project

Prozone Palms

By Hagwood Commercial Developers Private Limited

RG-MH-01567 · RERA P50500004915 · Last updated on MahaRERA portal: 29 Jan 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 82 complaints at MahaRERA
  • Completion date moved by 103 months
  • 5 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 103 months from the original
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
82Complaints at MahaRERAon this registration
Jump to the 290 documents Report an error

Prozone Palms is a Residential / Group Housing project by Hagwood Commercial Developers Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500004915 on 9 Aug 2017. Possession is promised by 31 Jul 2027. The completion date has moved by 103 months from the original filing. 82 complaints are on record with the regulator.

At a glance

Project

  • NameProzone Palms
  • TypeResidential / Group Housing
  • Location
    • OFF WARDHA ROAD
    • CHINCHBHUVAN
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440025
  • Pincode440025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500004915
  • ReraGenie IDRG-MH-01567

Builder

  • NameHagwood Commercial Developers Private Limited
  • Entity typeCompany
  • CINU45201MH2006PTC164110
  • GSTIN27AABCH7508Q1Z2
  • Managing DirectorSudhanshu Subodh Chaturvedi
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 31 Dec 2018)
  • Buildings4 building records
  • Documents filed290 files

Current status

100.0%Work done, per cost certificate

Figures as on 29 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PallazioNA170000
SplendourNA170000
Splendour 2NA170000
MilanoNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 29 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Pallazio91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Splendour91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Splendour 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Milano91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
Pallazio11
Splendour11
Splendour 211
Milano11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,925 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Dec 2025

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION
Permissible FSI32285.26
Proposed, not sanctioned32,285 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround and 1st Floor, Spring Field, Swami Samarth Nagar, Lokhandwala, Andheri West, Mumbai - 400053
Estimated costRs 12,771
Cost incurredRs 12,771
Work done100.0%
BuildingWingEstimatedIncurred
SplendourNARs 3,433Rs 3,433
PallazioNARs 2,864Rs 2,864
MilanoNARs 2,852Rs 2,852
Splendour 2NARs 2,547Rs 2,547
-NARs 1,076Rs 1,076

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavi Sonkusare Architects
EngineerSemac Consultants Pvt Ltd
EngineerRavi GOTE
Chartered AccountantABB & Associates
Chartered AccountantMSKA & Associates
PartnerRole in project
Hagwood Commercial Developers Private Limited-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500000771Dec 2018 → Apr 2020

Reason as filed by the promoterThe project completion is affected due to cancellation of Aviation NOC by AAI, Nagpur. The matter is in appeal under GSR 751 (E) with “The Chairman Appellate Committee, through The General Manager (ATM-NOC), Airports Authority of India, New Delhi” and their decision is awaited. With reference to the same you are requested to extend the project validity by one year.

EXT50500003870Dec 2018 → Apr 2020

Reason as filed by the promoterWrit Petition filed on 18th Nov 2019 in Bombay High Court, Nagpur Bench challenging cancellation of Aviation NOC and rejection of Appeal. Stay Order dated 19th Nov 2019 received. Proceedings Pending at Hon'ble High Court.

EXT50500006363Dec 2018 → Jan 2021

Reason as filed by the promoterIn Nov 2019, we had submitted an application for obtaining OC from local authority (Nagpur Municipal Corporation - NMC) through application dated 26th Nov 2019. Same was rejected by NMC by letter dated 6th March 2020 on grounds of pending Writ Petition WP No 7635/2019. A fresh writ petition was filed against the said rejection on 9th March 2020 vide Writ Petition no. 1473/2020. Due to the ongoing pandemic, only urgent matters are being heard in the High Court. Both the Writ Petitions are being heard together. The last hearing on the subject matter was heard on 03rd July 20 wherein AAI had soug

EXT50500008955Dec 2018 → Jan 2024

Reason as filed by the promoterAviation NOC was issued in 2012, same was rejected in 2017 post construction of four residential buildings. Appeal against the rejection was filed in 2018 which was rejected in 2019 by AAI Appellate Committee. Writ petition was filed against the cancellation of NOC and Rejection of Appeal vide WP NO 7635/2019 at Bombay High Court (Nagpur bench). In Nov 2019, we had submitted an application for obtaining OC from local authority (Nagpur Municipal Corporation - NMC) upto the height (floors) undisputed by Appellate Committee. Same was rejected by NMC in March 2020 on grounds of pending Writ Petiti

EXT50500024442Dec 2018 → Jul 2027

Reason as filed by the promoterThe Project construction is completed and Part OC is already received upto 11 floors out of total 14 floors in August 2022. Full Occupancy for balance three floors is on hold by the Nagpur Municipal Corporation (NMC) due to ongoing litigation (Writ Petition no. WP/5386/2023 filed in Bombay High Court, Nagpur Bench) with Airports Authority of India (AAI) for renewal of Aviation NOC. Extension is needed so that full OC can be obtained post achieving closure of the ongoing litigation. Promoter is following up with authorities for speedy closure of ongoing litigation.

Litigation declared3

CaseCourtStatus
AT004000000154596/2023RERAOngoing
AT004000000154597/2023RERAOngoing
CC004000000090604 /2024RERAOngoing

Complaints filed with MahaRERA82

Case no.ComplainantRespondentFiled
CC004000000010069Saket Sunil GotheAnil Singh24/07/2018
CC004000000030320SAKET GOTHEHAGWOOD COMMERCIAL DEVELOPERS PVT LTD28/12/2021
CC004000000010074Sachin DhanorkarAnil Singh17/08/2018
CC004000000090604Sachin DhanorkarSudhanshu Subodh Chaturvedi22/04/2024
CC004000000010086VRUSHALI MURLI LAHOTIHagwood Commercial Developers Private Limited through its Managing Director Mr. Sudhanshu Chaturvedi02/01/2019
CC004000000010087SACHIN PANDHARI SAWARBANDHEHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED THROUGH MR. SUDHANSHU CHATURVEDI, MANAGING DIRECTOR10/01/2019
CC004000000010089SARLADEVI NARAYAN AGRAWALHAGWOOD COMMERCIAL DEVELOPER PVT LTD.,09/01/2019
CC004000000010103Rahul Madhukar DeshmukhM/s Hagwood Commercial Developers Pvt. Ltd. & Ors.01/06/2019
CC004000000020106Ratankumar Tarachand MadanM/s. Hagwood Commercial Developers Pvt. Ltd.26/06/2019
CC004000000020108Mr. Vijay Ramchandra ChavanHagwood Commercial Developers Private Limited08/07/2019
CC004000000030170Yugpradhan Pannalal MehtaM/s. Hagwood Commercial Developers Pvt. Ltd.17/01/2020
CC004000000030171ANUJ YUGPRADHAN MEHTAM/s. Hagwood Commercial Developers Pvt. Ltd.17/01/2020
CC004000000030173Smt. Kavita JainM/s. Hagwood Commercial Developers Pvt. Ltd. (Through It's Principal Officers)21/02/2020
CC004000000030174Smt. Sunita JainM/s. Hagwood Commercial Developers Pvt. Ltd. (Through It's Principal Officers)21/02/2020
CC004000000030175Shri. Vinay JainM/s. Hagwood Commercial Developers Pvt. Ltd. (Through It's Principal Officers)21/02/2020
CC004000000030205Mr. Sudhir Umakant Vedpathak and Mrs. Vaishali Sudhir VedpathakM/s. Hagwood Commercial Developers Pvt. Ltd.04/11/2020
CC004000000030206Mrs. Ratna Abhijeet Vedpathak and Mr. Abhijeet Arvind VedpathakM/s. Hagwood Commercial Developers Pvt. Ltd.04/11/2020
CC004000000030207Mrs. Alka Upendra Vedpathak and Mr. Upendra Raghunath VedpathakM/s. Hagwood Commercial Developers Pvt. Ltd.04/11/2020
CC004000000030226Shri. Pramod Vishnudas DhanwadeM/s. Hagwood Commercial Developers Pvt. Ltd.12/12/2020
CC004000000030227Shri. Nilesh Vijay Patil & Smt. Sonali Nilesh PatilM/s. Hagwood Commercial Developers Pvt. Ltd.12/12/2020
CC004000000030251Shri. Rabjyot Singh TuliM/s. Hagwood Commercial Developers Pvt. Ltd.13/04/2021
CC004000000030261Smt. Mandeep Kaur TuliM/s. Hagwood Commercial Developers Pvt. Ltd.14/06/2021
CC004000000030262Shri. Rajendra Ramchandra ChaudhariM/s. Hagwood Commercial Developers Pvt. Ltd.14/06/2021
CC004000000030263Shri. Anant Pundlik MataleM/s. Hagwood Commercial Developers Pvt. Ltd.14/06/2021
CC004000000030264Shri. Ranjit Dhyaneshwarrao KhandarM/s. Hagwood Commercial Developers Pvt. Ltd.14/06/2021
CC004000000030319Shri. Shirish R Bhange & Smt. Madhavi S BhangeM/s. Hagwood Commercial Developers Pvt. Ltd.05/12/2021
CC004000000030182Sachin Sumatkumar JejaniHagwood Commercial Developers Private Limited30/07/2020
CC004000000030183Kirti Jejani and Sumat JejaniHagwood Commercial Developers Private Limited06/08/2020
CC004000000030209DR. AJAY SOOD & DR. ANITA SOODHagwood Commercial Developers Private Limited05/12/2020
CC004000000030282RAHUL KHANDELWALHagwood Commercial Developers Private Limited10/07/2021
CC004000000030283GAUTAM KHANDELWALHagwood Commercial Developers Private Limited10/07/2021
CC004000000030305ALOK AGRAWALHagwood Commercial Developers Private Limited10/09/2021
CC004000000030306SANDEEP AGRAWALHagwood Commercial Developers Private Limited10/09/2021
CC004000000030200Dr. Aruna Kishore JadhavHagwood Commercial Developers Private Limited15/10/2020
CC004000000030229Dolly Viresh AhujaHagwood Commercial Developers Pvt. Ltd.22/12/2020
CC004000000030258V RAVIKUMAR AND KALA RAVIKUMARHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED05/06/2021
CC004000000030259RAVIKUMAR VARADARAJANHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED06/06/2021
CC004000000030269PAWAN ARUN DESHMUKH AND ASHWINI PAWAN DESHMUKHHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED11/06/2021
CC004000000030275SHIVAKUMAR VHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED19/06/2021
CC004000000030273PRAKASH MANOHAR GAMOTE AND SUNITA PRAKASH GAMOTEHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED18/06/2021
CC004000000030274SWAPNIL BHARATRAO JADHAV AND INDRAYANI SWAPNIL JADHAVHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED19/06/2021
CC004000000030290Hagwood Commercial Developer Pvt LtdAnuj Yugpradhan Mehta26/07/2021
CC004000000030291Hagwood Commercial Developers Pvt LtdSmt Kavita Mukesh Jain26/07/2021
CC004000000030292Hagwood Commercial Developers Pvt LtdKirti Jejani and Sumat Jejani26/07/2021
CC004000000030293Hagwood Commercial Developers Pvt LtdRatan Tarachand Madan26/07/2021
CC004000000030294Hagwood Commercial Developers Pvt LtdSachin Sumatkumar Jejani26/07/2021
CC004000000030295Hagwood Commercial Developers Pvt LtdSmt Sunita Deepak Jain26/07/2021
CC004000000030296Hagwood Commercial Developers Pvt LtdVinaykumar Jain26/07/2021
CC004000000030297Hagwood Commercial Developers Pvt LtdYugpradhan Pannalal Mehta26/07/2021
CC004000000030361AJAY ANANTRAO DUDDALWARHAGWOOD COMMERCIAL DEVELOPERS PVT LTD29/04/2022
CC004000000030368Pankaj Jugalkishor AgrawalHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED12/05/2022
CC004000000030365YASHWANT KUMAR SINGHHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED11/05/2022
CC004000000030367ASHISH BHANUDAS DUDDALWARHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED12/05/2022
CC004000000030369RAJENDRA GOPALRAO JADHAVHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED13/05/2022
CC004000000030370PANKAJ RAMASHRAY TIWARIHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED13/05/2022
CC004000000030371AMIT BINODCHANDRA SARKARHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED14/05/2022
CC004000000030373VIJAY BHAGWAT FULZELEHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED16/05/2022
CC004000000030374KOMALCHAND MAROTRAO LIKHARHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED16/05/2022
CC004000000030379MANOJ LAXMIKANT ITKELWARHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED18/05/2022
CC004000000030380NIRANJAN TRIMBAK HOLAYHAGWOOD COMMERCIAL DEVELOPERS PRIVATE LIMITED18/05/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Dec 2024

Documents filed290

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 290 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 20180103 form 1.pdf29 Jan 2026
Form 2File: Hagwood Form 2 Dec17.pdf29 Jan 2026
Form 3File: Form 3 Withdrawal Certificate Hagwood - Dec.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-dec 17.pdf29 Jan 2026
Form 1File: 20180403 form 1.pdf29 Jan 2026
Form 2File: Hagwood Form 2 030418.pdf29 Jan 2026
Form 3File: Hagwood Form 3 Mar18.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-mar 18.pdf29 Jan 2026
Form 1File: Hagwood Form 1 Jun18.pdf29 Jan 2026
Form 2File: Hagwood Form 2 Jun18.pdf29 Jan 2026
Form 3File: Hagwood Form 3 Jun18.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-jun 18.pdf29 Jan 2026
Form 1File: 20181003 form 1.pdf29 Jan 2026
Form 2File: RERA form 2 Sep 18.pdf29 Jan 2026
Form 3File: Hagwood Form 3 Sep 2018.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-sep 18.pdf29 Jan 2026
Form 1File: 20190103 form 1.pdf29 Jan 2026
Form 2File: RERA form 2 Dec 18.pdf29 Jan 2026
Form 3File: Hagwood Form 3 Dec 2018.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-dec 18.pdf29 Jan 2026
Form 1File: 20190403 form 1.pdf29 Jan 2026
Form 2File: RERA form 2 Mar 19.pdf29 Jan 2026
Form 3File: RERA form 3 March 19.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-mar 19.pdf29 Jan 2026
Form 1File: 20190703 form 1.pdf29 Jan 2026
Form 2File: Form 2 Engineer cert- June 19.pdf29 Jan 2026
Form 3File: Form 3 CA Certificate -Hagwood-CAS-June 19.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-jun 19.pdf29 Jan 2026
Form 1File: 20191003 form 1.pdf29 Jan 2026
Form 2File: Form 2 Engineer Cert- Sept 19.pdf29 Jan 2026
Form 3File: Form 3 CA Certificate -Hagwood-CAS-Sep 19.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-sep 19.pdf29 Jan 2026
Form 1File: 20200103 form 1.pdf29 Jan 2026
Form 2File: Form-2 03-01-2020.pdf29 Jan 2026
Form 3File: Form 3 Dec 19.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-dec 19.pdf29 Jan 2026
Form 1File: 20200403 form 1.pdf29 Jan 2026
Form 2File: From-2 03-04-2020.pdf29 Jan 2026
Form 3File: Form 3 March 20.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: DF-mar 20.pdf29 Jan 2026
Form 1File: 20200703 form 1.pdf29 Jan 2026
Form 2File: Form -2 03-07-2020.pdf29 Jan 2026
Form 3File: Form 3 June 20.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2020-06-30.pdf29 Jan 2026
Form 1File: 20200703 form 1.pdf29 Jan 2026
Form 2File: Form -2 03-07-2020.pdf29 Jan 2026
Form 3File: Form 3 June 20.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2020-06-30.pdf29 Jan 2026
Form 1File: 20201003 form 1.pdf29 Jan 2026
Form 2File: 2020 09 HAGWOOD FORM 2.pdf29 Jan 2026
Form 3File: hagwood commercial devp 30th sept 20.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2020-09-30.pdf29 Jan 2026
Form 1File: 20210103 form 1.pdf29 Jan 2026
Form 2File: 2020 12 HAGWOOD FORM 2.pdf29 Jan 2026
Form 3File: Form 3 hagwood commercial devp 31st dec 20.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2020-12-31.pdf29 Jan 2026
Form 1File: 20210403 form 1.pdf29 Jan 2026
Form 2File: 2021 03 HAGWOOD FORM 2.pdf29 Jan 2026
Form 3File: Form 3 hagwood commercial devp 31st mar 21.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2021-03-31.pdf29 Jan 2026
Form 1File: 20211002 form 1.pdf29 Jan 2026
Form 2File: 2021 09 HAGWOOD FORM 2.pdf29 Jan 2026
Form 3File: Form3 hagwood commercial devp pvt ltd 30th sept 21.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2021-09-30.pdf29 Jan 2026
Form 1File: Form 1 - 4-01-2022.pdf29 Jan 2026
Form 2File: Form2 04-01-2022.pdf29 Jan 2026
Form 3File: Form 3 DEC 2021.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2021-12-31.pdf29 Jan 2026
Form 1File: Form 1 - 4-04-2022.pdf29 Jan 2026
Form 2File: Form 2 04-04-2022.pdf29 Jan 2026
Form 3File: Form 3 MARCH 2022.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2022-03-31.pdf29 Jan 2026
Form 1File: Form 1 - 4-07-2022.pdf29 Jan 2026
Form 2File: Form 2 04-07-2022.pdf29 Jan 2026
Form 3File: Form 3 JUNE 2022.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2022-06-30.pdf29 Jan 2026
Form 1File: Form 1 - 4-10-2022.pdf29 Jan 2026
Form 2File: Form 2 Hagwood - Sep 22.pdf29 Jan 2026
Form 3File: Form 3 SEP 2022.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: PP- 2022-09-30.pdf29 Jan 2026

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 103 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prozone Palms on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHINCHBHUVAN2,800+ in Nagpur

2 kmProzone PalmsCompleted 15Lapsed / revoked 6Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Hagwood Commercial Developers Private Limited

Hagwood Commercial Developers Private Limited has 2 registrations on MahaRERA, including Prozone Palms and Prozone Palms Elante. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Prozone Palms is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prozone Palms?

The registered promoter entity is Hagwood Commercial Developers Private Limited, a company as per the filing. Its CIN U45201MH2006PTC164110 and GSTIN 27AABCH7508Q1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prozone Palms?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prozone Palms?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Prozone Palms?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prozone Palms?

The professionals named in the filing: Architect: Ravi Sonkusare Architects; Engineer: Semac Consultants Pvt Ltd; Engineer: Ravi GOTE; Chartered Accountant: ABB & Associates; Chartered Accountant: MSKA & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prozone Palms?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prozone Palms. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prozone Palms to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.