Home / Browse projects / Mumbai Suburban, Maharashtra / PRIYAM RESIDENCY

Registered No litigation declared Residential / Group Housing project

PRIYAM RESIDENCY

By PRIYAM PROJECTS (I) PRIVATE LIMITED

RG-MH-18252 · RERA P51800066519 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 33.00 crore secured on the land, in favour of Aditya Birla Housing Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 18 months from the original
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 57%
57 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

PRIYAM RESIDENCY is a Residential / Group Housing project by PRIYAM PROJECTS (I) PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800066519 on 11 Jun 2024. Possession is promised by 30 Dec 2027. The completion date has moved by 18 months from the original filing. 32 of the 89 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NamePRIYAM RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • CHINCHOLI BUNDER
    • MALAD EAST
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800066519
  • ReraGenie IDRG-MH-18252

Builder

  • NamePRIYAM PROJECTS (I) PRIVATE LIMITED
  • Entity typeCompany
  • CINU68200MH2010PTC207537
  • DirectorsAWAKASH MRITTUNJAY SINGH, AMIT VINODANAND MISHRA

Key dates

this monthRegisteredJun 2024First promiseJun 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Jun 2026)
  • Buildings3 building records
  • Documents filed90 files

Current status

36%32 of 89 units booked
53.8%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
wing - AWING-A121239039
WING - BWING-B161642042
WING-CWing-C74808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 57%.

wing - A · wing WING-A50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
WING - B · wing WING-B43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure48%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
WING-C · wing Wing-C43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure48%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70
BuildingClosed/CoveredTotal
wing - A WING-A3232
WING - B WING-B3131
WING-C Wing-C77

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,201 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Ltd
Secured amountRs 33.00 crore
CERSAI search filedYes
Declared on8 Aug 2025
LandownerVillageDistrict
ACADEMY OF LIBERAL ARTSJuhuMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5172.12
Proposed, not sanctioned4,016 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchD.VACHA ROAD122 BACKBAY RECLAMATION,CHURCHGATEMUMBAIMAHARASHTRA400 020
Estimated costRs 162.32 cr
Cost incurredRs 87.38 cr
Work done53.83%
BuildingWingEstimatedIncurred
wing - AWING-ARs 51.10 crRs 29.13 cr
WING - BWING-BRs 51.10 crRs 29.13 cr
WING-CWing-CRs 51.10 crRs 29.13 cr
-NARs 9.02 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectREDKAR & REDKAR
EngineerMukesh Kumar
EngineerRupam Ghosh
Chartered AccountantJKD and Associates Birendrakumar Jha
Chartered AccountantDK & Co.
PartnerRole in project
PRIYAM PROJECTS (I) PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09062621294Jun 2026 → Dec 2027

Reason as filed by the promoterThe completion of the project PRIYAM RESIDENCY (Registration No. P51800066519) has been delayed due to a combination of unforeseen and unavoidable circumstances that affected the overall construction schedule and project execution timeline. The project was impacted by disruptions in the availability of construction materials, fluctuations in material prices, and delays in procurement and supply chain management. In addition, there were shortages of skilled and unskilled labour during critical stages of construction, which adversely affected the pace of work. Further, delays were experienced in

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Priyam FORM 1 jan to mar-26.pdf27 Jun 2026
Withdrawal Update Form 2File: Priyam FORM 2 jan to mar-26.pdf27 Jun 2026
Withdrawal Update Form 3File: form 3 priyam jan to march 2026.pdf27 Jun 2026
Withdrawal Update Form 1File: Priyam FORM 1 jan to mar-26.pdf9 Jun 2026
Withdrawal Update Form 2File: Priyam FORM 2 jan to mar-26.pdf9 Jun 2026
Withdrawal Update Form 3File: form 3 priyam jan to march 2026.pdf9 Jun 2026
Declaration and undertaking (Annexure A)File: annexure a priyam.pdf6 Jun 2026
Building plan approvalFile: Approved Plan_Till 13 floor (3).pdf6 Jun 2026
Withdrawal Update Form 1File: Priyam FORM 1 jan to mar-26.pdf6 Jun 2026
Withdrawal Update Form 2File: Priyam FORM 2 jan to mar-26.pdf6 Jun 2026
Withdrawal Update Form 3File: FORM-3 JAN TO MARCH 2026 PRIYAM.pdf6 Jun 2026
Withdrawal Update Form 1File: Form-1 Priyam Projects Oct to dec-25.pdf10 Apr 2026
Withdrawal Update Form 2File: Form- 2 Priyam Projects Oct to Dec-25.pdf10 Apr 2026
Withdrawal Update Form 3File: Form- 3 Priyam Projects Oct to Dec-25.pdf10 Apr 2026
Withdrawal Update Form 1File: Form-1 Priyam Projects Oct to dec-25.pdf25 Mar 2026
Withdrawal Update Form 2File: Form- 2 Priyam Projects Oct to Dec-25.pdf25 Mar 2026
Withdrawal Update Form 3File: Form- 3 Priyam Projects Oct to Dec-25.pdf25 Mar 2026
Building plan approvalFile: Approved Plan_Till 13 floor (2).pdf18 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A Priyam 23-24.pdf9 Dec 2025
Form 5 (FY 2024-2025)File: Form-5.pdf8 Dec 2025
Withdrawal Update Form 1File: Form-1 Priyam Jul to Sep-25.pdf16 Oct 2025
Withdrawal Update Form 2File: Form-2 Priyam Apr to Jun-25.pdf16 Oct 2025
Withdrawal Update Form 3File: Form-3 Priyam Apr to Jun-25.pdf16 Oct 2025
Withdrawal Update Form 1File: Form-1 Priyam Jul to Sep-25.pdf13 Oct 2025
Withdrawal Update Form 2File: Form-2 Priyam Apr to Jun-25.pdf13 Oct 2025
Withdrawal Update Form 3File: Form-3 Priyam Apr to Jun-25.pdf13 Oct 2025
Withdrawal Update Form 1File: Form-1 Priyam Jul to Sep-25.pdf11 Oct 2025
Withdrawal Update Form 1File: Form-1 Priyam Jul to Sep-25.pdf11 Oct 2025
Withdrawal Update Form 2File: Form-2 Priyam Apr to Jun-25.pdf11 Oct 2025
Withdrawal Update Form 2File: Form-2 Priyam Apr to Jun-25.pdf11 Oct 2025
Withdrawal Update Form 3File: Form-3 Priyam Apr to Jun-25.pdf11 Oct 2025
Withdrawal Update Form 3File: Form-3 Priyam Apr to Jun-25.pdf11 Oct 2025
Building plan approval or NA orderFile: CC up to 13 floors.pdf16 Sep 2025
Building plan approvalFile: Approved Plan_Till 13 floor.pdf16 Sep 2025
Form 1File: Form-1 till Mar-24.pdf12 Aug 2025
Form 2File: Form - 2 till Mar-24.pdf12 Aug 2025
Form 3File: Form - 3 till Mar-24.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30-06-2024.pdf12 Aug 2025
Form 1File: Form-1.pdf12 Aug 2025
Form 2File: Form-2.pdf12 Aug 2025
Form 3File: Form-3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30-09-2024.pdf12 Aug 2025
Form 1File: Form-1 Priyam Oct to Dec-24.pdf12 Aug 2025
Form 2File: Form-2 Priyam Oct to Dec-24.pdf12 Aug 2025
Form 3File: Form-3 Priyam Projects Oct to Dec-24 - Revised.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30-12-2024.pdf12 Aug 2025
Form 1File: Form-1 Priyam.pdf12 Aug 2025
Form 2File: Form-2 Priyam.pdf12 Aug 2025
Form 3File: Form-3 Priyam_compressed (1).pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31-03-2025.pdf12 Aug 2025
Proforma of Agreement for saleFile: PRIYAM RESIDENCY RERA AGREEMENT.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Priyam Oct to Dec-24.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Priyam Oct to Dec-24.pdf24 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANE.pdf28 Feb 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANE.pdf28 Feb 2025
Other - FinanceFile: ENCUMBRANE.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 aeter.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 aeternum.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 aeternum.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD AETE.pdf23 Oct 2024
Other - LegalFile: output.pdf6 Jun 2024
Other - LegalFile: lease deed 1.pdf4 Jun 2024
Other - LegalFile: lease deed 2.pdf4 Jun 2024
Other - LegalFile: lease deed 3.pdf4 Jun 2024
Other - LegalFile: lease deed 4.pdf4 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ministry Of Corporate Affairs - MCA Services.pdf13 May 2024
Other - TechnicalFile: Specimen format of Declaration - layout.pdf11 May 2024
Layout approvalFile: Drawing (7)_3-end.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: Drawing (7)_3-end.pdf30 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: MALAD 2409659_FurtherCC_signed (1).pdf30 Apr 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf29 Apr 2024
Building plan approvalFile: MALAD 2306968_IOD_signed (1).pdf29 Apr 2024
PAN CardFile: COMPANY PAN.pdf29 Apr 2024
Copy of the legal title reportFile: 20000603195356.pdf29 Apr 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (3) (2).pdf29 Apr 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (3) (2).pdf29 Apr 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf29 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: MALAD 2306968_IOD_signed (1).pdf29 Apr 2024
Declaration about Commencement CertificateFile: CC COVERING LETTER.pdf29 Apr 2024
Declaration in FORM BFile: 1 Declaration in FORM B (4) (4).pdf29 Apr 2024

How this compares with Mumbai Suburban

36%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIYAM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

Builder: PRIYAM PROJECTS (I) PRIVATE LIMITED

PRIYAM PROJECTS (I) PRIVATE LIMITED has 1 registration on MahaRERA, including PRIYAM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PRIYAM RESIDENCY is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIYAM RESIDENCY?

The registered promoter entity is PRIYAM PROJECTS (I) PRIVATE LIMITED, a company as per the filing. Its CIN U68200MH2010PTC207537 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIYAM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIYAM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIYAM RESIDENCY?

The professionals named in the filing: Architect: REDKAR & REDKAR; Engineer: Mukesh Kumar; Engineer: Rupam Ghosh; Chartered Accountant: JKD and Associates Birendrakumar Jha; Chartered Accountant: DK & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIYAM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIYAM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIYAM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.