ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Priya Blossoms

Registered No litigation declared Residential / Group Housing project

Priya Blossoms

By Sanjay Laxmanrao Narad

RG-MH-91729 · RERA P50500055967 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
17 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Priya Blossoms is a Residential / Group Housing project by Sanjay Laxmanrao Narad in Nagpur, Maharashtra, registered with MahaRERA as P50500055967 on 2 May 2024. Possession is promised by 31 Jan 2027. 9 of the 26 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NamePriya Blossoms
  • TypeResidential / Group Housing
  • Location
    • Chintamani Nagar
    • Nagpur
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • 440025
  • Pincode440025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055967
  • ReraGenie IDRG-MH-91729

Builder

  • NameSanjay Laxmanrao Narad
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredMay 2024PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion31 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

35%9 of 26 units booked
98.0%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Priya BlossomsNA9726026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Priya Blossoms: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership16

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area733 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
LandownerVillageDistrict
Pradip Shripad JoshiNagpur (M Corp.)Nagpur
Giresh Vasantrao DeshkarNagpur (M Corp.)Nagpur
Chinmay Nishikant KaleNagpur (M Corp.)Nagpur
Suresh Mukundrao DeshmukhNagpur (M Corp.)Nagpur
Mahesh Ramesh BakalNagpur (M Corp.)Nagpur
Kamalakar Laxmikant KaleNagpur (M Corp.)Nagpur
Pralhad Mahadeorao BokadeNagpur (M Corp.)Nagpur
Mukund Pralhad DeshpandeNagpur (M Corp.)Nagpur
Prabhakar Harichandra MohadikarNagpur (M Corp.)Nagpur
Neeta Dinkar deshpandeNagpur (M Corp.)Nagpur
Shashank Madhukar DeshpandeNagpur (M Corp.)Nagpur
Shashi Kamalakar kaleNagpur (M Corp.)Nagpur
Arun Nayan TiwariNagpur (M Corp.)Nagpur
Vikas Marotrao BarapatreNagpur (M Corp.)Nagpur
Vijay Prabhakar SawarkarNagpur (M Corp.)Nagpur
Radhika Mukund DeshpandeNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI2343.13
Proposed, not sanctioned2,343 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP AGRASEN CHATTRALAYA,RAVINAGAR SQUARE,AMRAVATI ROAD,NAGPUR
Estimated costRs 3.83 cr
Cost incurredRs 3.75 cr
Work done98.02%
BuildingWingEstimatedIncurred
Priya BlossomsNARs 3.83 crRs 3.75 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYashwant Pochalwar
EngineerSajid Ali Khan
Chartered AccountantCA Adhish Agarwal
Chartered AccountantA S MUNDADA & CO
PartnerRole in project
M/s. Lifestyle Infrastructure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Priya From 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Priya Blossoms Form2.pdf28 Apr 2026
Withdrawal Update Form 3File: Priya Blossoms Form3_compressed.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1- 30-06-25.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1- 30-09-25.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1- 31-12-25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form -2 30-06-2025.pdf20 Jan 2026
Withdrawal Update Form 2File: priya 30-09-2025 form-2.pdf20 Jan 2026
Withdrawal Update Form 2File: priya 31-12-2025 form-2.pdf20 Jan 2026
Withdrawal Update Form 3File: Priya CA 30-06-2025_compressed.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 30-09-2025_compressed.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 31-12-2025_compressed.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: From 5.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A (1).pdf17 Jun 2025
Form 1File: priya blossoms-Q1 24-25 arc FORM 1.pdf13 Jun 2025
Form 2File: priya blossoms-Q1 24-25 eng FORM 2.pdf13 Jun 2025
Form 3File: Form 3 CA Certification - PRIYA BLOSSOMS - 2024-25-Q1.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: priya blossoms-Q1 24-25 Sold & booked.pdf13 Jun 2025
Form 1File: priya blossoms-Q2 24-25 arc FORM 1.pdf13 Jun 2025
Form 2File: priya blossoms-Q2 24-25 eng FORM 2.pdf13 Jun 2025
Form 3File: Form 3 CA Certification - PRIYA BLOSSOMS - 2024-25-Q2.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: priya blossoms-Q2 24-25 Sold & booked.pdf13 Jun 2025
Form 1File: FORM-1 ARCHITECT Q3 2024-25.pdf13 Jun 2025
Form 2File: FORM - 2 - Q3 2024-25 REVISED.pdf13 Jun 2025
Form 3File: Form 3 CA Certification - PRIYA BLOSSOMS - 2024-25-Q3.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-booked inventory Q3 2024-25.pdf13 Jun 2025
Form 1File: FORM-1 REVISED.pdf13 Jun 2025
Form 2File: FORM - 2 - Q4 2024-25 REVISED.pdf13 Jun 2025
Form 3File: Form 3 CA Certification - PRIYA BLOSSOMS - 2024-25-Q4.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-booked inventory Q4 2024-25.pdf13 Jun 2025
Form 1File: FORM-1 REVISED.pdf13 Jun 2025
Form 2File: FORM - 2 - Q4 2024-25 REVISED.pdf13 Jun 2025
Form 3File: Form 3 CA Certification - PRIYA BLOSSOMS - 2024-25-Q4.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-booked inventory Q4 2024-25.pdf13 Jun 2025
Withdrawal Update Form 1File: FORM-1 REVISED.pdf13 Jun 2025
Withdrawal Update Form 2File: FORM - 2 - Q4 2024-25 REVISED.pdf13 Jun 2025
Withdrawal Update Form 3File: Form 3 CA Certification - PRIYA BLOSSOMS - 2024-25-Q4.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc - Q1.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC - Q2.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Q1.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Q2.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Q1.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG - Q2.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: SUS - Q1.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: SUS - Q2.pdf27 Dec 2024
Other - LegalFile: priya blossoms form b.pdf16 Apr 2024
Building plan approvalFile: DWG-1_compressed.pdf21 Mar 2024
Building plan approvalFile: DWG-2.pdf21 Mar 2024
Building plan approvalFile: DWG-3.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: DWG-1_compressed.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: DWG-2.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: DWG-3.pdf21 Mar 2024
CERSAI detailsFile: cersai declaration.pdf5 Mar 2024
Other - TechnicalFile: order 50 declaration.pdf5 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report_200299200082_For_Asset_Based_Search_04_03_2024_18_48_55_157.pdf4 Mar 2024
Layout approvalFile: layout map.pdf2 Mar 2024
Copy of the legal title reportFile: Legal Tital Report.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: Encombrance Certificate.pdf2 Mar 2024
Details of encumbrances concerned to LegalFile: Encombrance Certificate.pdf2 Mar 2024
Copy of Layout Approval (in case of layout)File: layout map.pdf2 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Building Permission.pdf2 Mar 2024
Declaration about Commencement CertificateFile: declaration - commencement certificate.pdf2 Mar 2024
Declaration in FORM BFile: Form B.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: sold_-_booked_inventory[1].pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA.pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann- A disclosure of interest.pdf2 Mar 2024
Proforma of Agreement for saleFile: Agreement To sale RERA Draft PDF.pdf2 Mar 2024
Proforma of Allotment letterFile: NEW ALLOTMENT LETTER.pdf2 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank encumbrance -REVISED.pdf2 Mar 2024
Deviation Report with respect to Allotment letterFile: deviation of allotment letter.pdf2 Mar 2024
Deviation Report with respect to model copy of AgreementFile: deviation of model copy of agreement.pdf2 Mar 2024
PAN CardFile: Pan SN.pdf27 Feb 2024

How this compares with Nagpur

35%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Priya Blossoms on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur2,800+ in Nagpur

2 kmPriya BlossomsCompleted 34Lapsed / revoked 16Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: Sanjay Laxmanrao Narad

SANJAY LAXMANRAO NARAD has 5 registrations on MahaRERA, including BALAJI ENCLAVE and Majestic Om. Its filings disclose 7 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Priya Blossoms is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Priya Blossoms?

The registered promoter entity is Sanjay Laxmanrao Narad, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Priya Blossoms?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Priya Blossoms?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Priya Blossoms?

The professionals named in the filing: Architect: Yashwant Pochalwar; Engineer: Sajid Ali Khan; Chartered Accountant: CA Adhish Agarwal; Chartered Accountant: A S MUNDADA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Priya Blossoms?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Priya Blossoms. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Priya Blossoms to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.