ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / PRITY PARK B AND C BLDG PHASE 2

Registration lapsed No litigation declared Residential / Group Housing project

PRITY PARK B AND C BLDG PHASE 2

By S D BHALERAO ASSOCIATES

RG-MH-10038 · RERA P51700003821 · Last updated on MahaRERA portal: 18 Oct 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 8 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
4 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 70%
8Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

PRITY PARK B AND C BLDG PHASE 2 is a Residential / Group Housing project by S D BHALERAO ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700003821 on 6 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 48 months from the original filing. 8 complaints are on record with the regulator.

At a glance

Project

  • NamePRITY PARK B AND C BLDG PHASE 2
  • TypeResidential / Group Housing
  • Location
    • G B ROAD
    • OWALA
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700003821
  • ReraGenie IDRG-MH-10038

Builder

  • NameS D BHALERAO ASSOCIATES
  • Entity typePartnership
  • PartnersPRATIMA SANJAY BHALERAO, PRASHANT KARUNAKARAN PILLAI
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Aug 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B wingNA100000
C WingNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 70%.

B wing46%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Wing44%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered2
Open Space16
BuildingClosed/CoveredOpen SpaceTotal
B wing189
C Wing189

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,165 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3524.18
Proposed, not sanctioned3,524 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAkruti SMC, Khopat, Thane West

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManav Consultants
EngineerAssociated Consultants
PartnerRole in project
S D BHALERAO ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700005243Dec 2019 → Dec 2020

Reason as filed by the promoterWe wish to inform you that we have already registered our ongoing project, “Prity Park” B & C Bldg. Phase-2, the project bears RERA registration No. P51700003821. While registering, we had declared the date of completion of this project as 31/12/2019. We are developing this Project as a Joint-Developer. We have faced unexpected liquidity crunch in the real estate market on account of demonetization. We also wish state that we had to overcome non-co-operation of the co-Developers who were not forthcoming to co-operate with us in executing the said Project. We, as Joint-Developers had therefore

EXT51700012681Dec 2019 → Dec 2023

Reason as filed by the promoterWe wish to humbly inform you that we are developing the real estate project Prity Park B & C building, Phase II which bears RERA Registration No. P51700003821. The project was registered with a proposed completion date as Dec-2017 and a revised proposed completion date as 31.12.2019. Subsequently, the completion date of the project was extended by us on 30.12.2020 by submitting and complying with the requirements of the RERA Authority. The MahaRERA Authority was pleased to grant us extensions till 30.12.2020. In the meanwhile, due to the pandemic situation, the MahaRERA Authority had revised t

Litigation declared3

CaseCourtStatus
88/2015/2015JMFC Court ThaneHearing
115/2013/2013Session Court ThaneHearing
583/2013/2013Session Court ThaneHearing

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000057792Purshottam ChandrapotaM/s S.D. Bhalerao Associates24/01/2019
CC006000000057805Purshottam ChandrapotaM/s. S.D. Bhalerao Associates24/01/2019
CC006000000078696Sandeep M BhammerM/s S D Bhalerao Associates29/03/2019
CC006000000078698Vishal M BhammerM/s S D Bhalerao Associates29/03/2019
CC006000000078970SANTOSH KUMAR SENS D BHALERAO ASSOCIATES20/04/2019
CC006000000089598SHASHANK RAMCHANDRA MANOHARSANJAY D BHALERAO04/06/2019
CC006000000192249VIJAY ANANT GHORPADES.D.BHALERAO and ASSOCIATES09/03/2020
CC006000000397819PRITY RAJPUTS D BHALERAO ASSOCIATES27/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: Discolsure sold flat Prity Park.pdf18 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf18 Oct 2022
Proforma of Allotment letterFile: Allotment Letter (new format).pdf10 Oct 2022
Declaration about Commencement CertificateFile: Declaration about C C.pdf4 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A March-2020.pdf4 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A March-2021.pdf4 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY 2017-18.pdf4 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19.pdf4 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf4 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf4 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank account opening.pdf4 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Allot prity park.pdf4 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report sale agree.pdf4 Oct 2022
OtherFile: Other.pdf15 Feb 2018
OtherFile: Others.pdf3 Nov 2017
Declaration in FORM BFile: Affidavit Cum Declaration NEW.pdf30 Jul 2017
Layout approvalFile: Declaration Of layout.pdf28 Jul 2017
Details of encumbrancesFile: Declaration of encum.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Declaration Of layout.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form1).pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Certificate for Prity Park.pdf28 Jul 2017
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf28 Jul 2017
Copy of the legal title reportFile: Title Report.pdf20 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Jul 2017
Building plan approvalFile: Approval Plan.pdf16 Jul 2017
PAN CardFile: SDB Associates Pancard.pdf16 Jul 2017
Building Plan Approval (IOD)File: Approval Plan.pdf16 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PRITY PARK WING ASurvey No 100 Hissa No 1 to 4 Village Owala G B Road Thane west78CompletedMar 2012Late, Apr 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRITY PARK B AND C BLDG PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OWALA7,600+ in Thane

2 kmPRITY PARK B AND C BLDG Completed 70Lapsed / revoked 19Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 139 registered projects within 2 km.

Builder: S D BHALERAO ASSOCIATES

S D BHALERAO ASSOCIATES has 2 registrations on MahaRERA, including PRITY PARK B AND C BLDG PHASE 2 and DEEPMALA CHS LTD. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that PRITY PARK B AND C BLDG PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRITY PARK B AND C BLDG PHASE 2 is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRITY PARK B AND C BLDG PHASE 2?

The registered promoter entity is S D BHALERAO ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRITY PARK B AND C BLDG PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRITY PARK B AND C BLDG PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRITY PARK B AND C BLDG PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRITY PARK B AND C BLDG PHASE 2?

The professionals named in the filing: Architect: Manav Consultants; Engineer: Associated Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRITY PARK B AND C BLDG PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRITY PARK B AND C BLDG PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRITY PARK B AND C BLDG PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.