PRITHVI PRIDE BUILDING NO 3
RG-MH-18163 · RERA P51700077237 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRITHVI PRIDE BUILDING NO 3 is a Residential / Group Housing project by PRITHVI LAND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700077237 on 31 Jul 2024. Possession is promised by 31 Dec 2028. 24 of the 79 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NamePRITHVI PRIDE BUILDING NO 3
- TypeResidential / Group Housing
- Location
- NEXT TO RNO VIVA
- NAER SILVER SARITA COMPLEX
- VINAY NAGAR
- MIRA ROAD EAST
- Chavindra
- Thane
- 401107
- Pincode401107
- RERA no.P51700077237
- ReraGenie IDRG-MH-18163
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jul 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRITHVI PRIDE BUILDING NO 3 | NA | 20 | 20 | 79 | 0 | 79 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.
PRITHVI PRIDE BUILDING NO 3: 32% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SNEHAL KALSARIA | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PRITHVI PRIDE BUILDING NO 3 | NA | Rs 26.33 cr | Rs 14.69 cr |
| - | NA | Rs 67.85 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TEJ'S CONSULTANTS |
| Architect | TEJS CONSULTANTS |
| Engineer | JITEN PATEL |
| Chartered Accountant | ACG AND ASSOCIATES |
| Chartered Accountant | STR & ASSOSIATES |
| Partner | Role in project |
|---|---|
| PRITHVI LAND DEVELOPERS | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 479/2013 | CIVIL COURT | CASE DISMISSED |
| 622/2013 | CIVIL COURT | CASE DISMISSED |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: FROM 2A FY_2024-25.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: PP3 FORM 1 MAR 2026.pdf | 12 Jun 2026 |
| Withdrawal Update Form 2File: PP3 FORM 2 MAR 2026.pdf | 12 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 PP3 Q4 MAR 2026-FOR SIGNED.pdf | 12 Jun 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A BLDG NO 03 FY 2025-26.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: PP3 FORM 1 - DEC 2025.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: PP3 FORM 2 - DEC 2025.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: PP3 FORM 3 - DEC 2025-SIGNED.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: PP3 FORM 1 - SEP 2025.pdf | 1 Jan 2026 |
| Withdrawal Update Form 2File: PP3 FORM 2 - SEP 2025.pdf | 1 Jan 2026 |
| Withdrawal Update Form 3File: PP3 FORM 3 - SEP 2025.pdf | 1 Jan 2026 |
| Form 1File: FORM 1 PP3.pdf | 14 Aug 2025 |
| Form 2File: FORM 2 PP3.pdf | 14 Aug 2025 |
| Form 3File: FORM 3 PP3 - SIGNED.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY PP3.pdf | 14 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_PRITHVI PRIDE 3 Q4-SIGNED.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 2025 PP3.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2025 PP3.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PP3 Q2 SEP 24 SIGNED.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Q3 DEC 2024_PP 3-SIGNED.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_PP3 REVISED Q3 DEC 24.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PRITHVI PRIDE BLDG NO 03 FORM 1 MARCH 2024.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PP3 FORM 1 ARCH 29 07 24.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PP3 FORM 1 ARCH 18 12 24.pdf | 4 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG NO 03 APR-24.pdf | 4 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PP3 FORM 2 ENG CER SEP 2024.pdf | 4 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PP3 FORM 2 ENG CER DEC 2024.pdf | 4 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: PP3 SOLD AND UNSOLD 31 12 2024 REVISED.pdf | 4 Jan 2025 |
| Copy of the legal title reportFile: Latest Rera Title certificate-19072024 HL.pdf | 25 Jul 2024 |
| Copy of the legal title reportFile: PRITHVI PRIDE BLDG NO 03 LAND OWNERSHIP DECLARATION.pdf | 25 Jul 2024 |
| Other - LegalFile: PRITHVI PRIDE BLDG NO 03 LAND OWNERSHIP DECLARATION.pdf | 2 Jul 2024 |
| Other - LegalFile: घोडबंदर_220_7_Satbara (1) hl.pdf | 2 Jul 2024 |
| Other - LegalFile: घोडबंदर_220_8_Satbara (1)hl.pdf | 2 Jul 2024 |
| Other - LegalFile: sawant gazet hl - converted.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED REVISED-PP3.pdf | 19 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: DECLARATION FOR LEGAL(revised).pdf | 5 Jun 2024 |
| Details of encumbrances concerned to LegalFile: DECLARATION FOR LEGAL(revised).pdf | 5 Jun 2024 |
| Other - TechnicalFile: cc mail by mbmc to rera.pdf | 3 Jun 2024 |
| Layout approvalFile: LAYOUT HL.pdf | 22 May 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT HL.pdf | 22 May 2024 |
| Other - TechnicalFile: Self Declaration Regarding Plot Area Prithvi Pride bldg no-3.pdf | 22 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC DETAILS OF PRITHVI PRIDE BLDG NO 03.pdf | 21 May 2024 |
| Other - TechnicalFile: declaration cum undertaking.pdf | 21 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MR DINESH YADAV.pdf | 16 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MR RAJESH YADAV.pdf | 16 May 2024 |
| Other - TechnicalFile: CC VERIFICATION MAIL.pdf | 16 May 2024 |
| Declaration in FORM BFile: RERA FORM B BLDG NO-3 PROMOTER.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED REVISED-PP3.pdf | 1 May 2024 |
| Proforma of Agreement for saleFile: PRITHVI PRIDE BLDG NO 03 AGREEMENT.pdf | 1 May 2024 |
| Proforma of Allotment letterFile: allotment letter.pdf | 1 May 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT BLDG NO 03.pdf | 1 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT BLDG NO 03.pdf | 1 May 2024 |
| Building plan approvalFile: BLDG PLAN BLDG NO 3 (3 OF 3) HL.pdf | 30 Apr 2024 |
| PAN CardFile: 1 COMPANY PAN CARD PLD.pdf | 30 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: DECLARATION FINANCE PRITHVI PRIDE BLDG NO 03.pdf | 30 Apr 2024 |
| Details of encumbrances concerned to LegalFile: DECLARATION FINANCE PRITHVI PRIDE BLDG NO 03.pdf | 30 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN BLDG NO 3 (3 OF 3) HL.pdf | 30 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert_RB_314338_449YhSVPSign hl.pdf | 30 Apr 2024 |
| Declaration about Commencement CertificateFile: DECLARATION FOR CC PRITHVI PRIDE BLDG NO 03.pdf | 30 Apr 2024 |
| CERSAI detailsFile: DECLARATION CERSAI PRITHVI PRIDE BLDG NO 03.pdf | 30 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MR JANARDAN YADAV.pdf | 30 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MR MADHAV KODE.pdf | 30 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MR PRAVIN SHAH.pdf | 30 Apr 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PRITHVI PRIDE PHASE-IP51800008848 | MIRA ROAD EAST, Thane | 165 | Aug 2017 | Ongoing | Oct 2022Registered original: Sep 2021 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRITHVI PRIDE BUILDING NO 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MIRA ROAD EAST7,600+ in Thane
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: PRITHVI LAND DEVELOPERS
PRITHVI LAND DEVELOPERS has 3 registrations on MahaRERA, including PRITHVI PRIDE PHASE-I and PRITHVI PRIDE BUILDING NO 2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if PRITHVI PRIDE BUILDING NO 3 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRITHVI PRIDE BUILDING NO 3?
The registered promoter entity is PRITHVI LAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRITHVI PRIDE BUILDING NO 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRITHVI PRIDE BUILDING NO 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRITHVI PRIDE BUILDING NO 3?
The professionals named in the filing: Architect: TEJ'S CONSULTANTS; Architect: TEJS CONSULTANTS; Engineer: JITEN PATEL; Chartered Accountant: ACG AND ASSOCIATES; Chartered Accountant: STR & ASSOSIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRITHVI PRIDE BUILDING NO 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback