Home / Browse projects / Thane, Maharashtra / PRITHVI PRIDE BUILDING NO 2

Registered No litigation declared Residential / Group Housing project

PRITHVI PRIDE BUILDING NO 2

By PRITHVI LAND DEVELOPERS

RG-MH-18127 · RERA P51700076775 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 12 months from the original
0 of 11Construction stages donefurthest along: Excavation, 70%
104 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

PRITHVI PRIDE BUILDING NO 2 is a Residential / Group Housing project by PRITHVI LAND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700076775 on 28 Jun 2024. Possession is promised by 31 Dec 2029. The completion date has moved by 12 months from the original filing. 7 of the 111 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRITHVI PRIDE BUILDING NO 2
  • TypeResidential / Group Housing
  • Location
    • NEXT TO RNA VIVA
    • NEAR SILVER SARITA COMPLEX
    • VINAY NAGAR
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700076775
  • ReraGenie IDRG-MH-18127

Builder

  • NamePRITHVI LAND DEVELOPERS
  • Entity typePartnership
  • PartnersJANARDAN RAMPALAT YADAV, MADHAV RAMESH KODE, PRAVIN SHAMJI SHAH, RAJESH BILGU YADAV, DINESH KALURAM YADAV
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024First promiseDec 2028Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed65 files

Current status

6%7 of 111 units booked
16.9%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRITHVI PRIDE BUILDING NO 2NA24241092111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 70%.

PRITHVI PRIDE BUILDING NO 2: 13% average across the applicable activities

ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered27
Open Space86

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area903 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
MADHAV KODEMumbai CityMumbai City
PRAVIN SHAMJI SHAHMumbai CityMumbai City
JANARDAN YADAVMumbai CityMumbai City
ANILKUMAR YADAVMumbai CityMumbai City
RAJESH YADAVMumbai CityMumbai City
DINESH YADAVMumbai CityMumbai City
SHANKAR ANKUSH VIRKARMira-Bhayandar (M Corp.)Thane
MUNSUKH GUDKHAMumbai CityMumbai City
MEGHJI BHANUSHALIMumbai CityMumbai City
VARDHMAN DEVELOPERSMumbai CityMumbai City
SOMCHAND GUTKAMira-Bhayandar (M Corp.)Thane
RAMESH GUTKAMumbai CityMumbai City
SANDEEP GUTKAMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMIRA-BHAYANDAR MUNICIPAL CORPORATION
Permissible FSI13377.26
Proposed, not sanctioned12,687 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 02, THE CORPORATE LOUNGE, MIRA BHAYENDER ROAD, KASHIMIRA, MIRA ROAD EAST, THANE
Estimated costRs 44.22 cr
Cost incurredRs 7.45 cr
Work done16.86%
BuildingWingEstimatedIncurred
PRITHVI PRIDE BUILDING NO 2NARs 43.20 crRs 7.45 cr
-NARs 1.02 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJ'S CONSULTANTS
ArchitectTEJS CONSULTANTS
EngineerJITEN PATEL
Chartered AccountantACG AND ASSOCIATES
Chartered AccountantSTR & ASSOSIATES
PartnerRole in project
PRITHVI LAND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024386Dec 2028 → Dec 2029

Reason as filed by the promoterWhile making the application for Project registration we have inadvertently mentioned the Project completion date 31-12-2028 instead of 31-12-2029. Therefore, we seek further extension till 31-12-2029

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM-2A FY_2024-25.pdf29 Jun 2026
Withdrawal Update Form 1File: PP2 FORM 1 - MAR 2026.pdf12 Jun 2026
Withdrawal Update Form 2File: PP2 FORM 2 - MAR 2026.pdf12 Jun 2026
Withdrawal Update Form 3File: FORM 3 PP2 Q4 MAR 2026-FOR SIGNED.pdf12 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A BLDG NO 02 FY 2025-26.pdf12 Jun 2026
Withdrawal Update Form 1File: PP2 FORM 1 - DEC 2025.pdf5 Mar 2026
Withdrawal Update Form 2File: PP2 FORM 2 - DEC 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: PP2 FORM 3 - DEC 2025 - SIGNED.pdf5 Mar 2026
Withdrawal Update Form 1File: PP2 FORM 1 - SEP 2025.pdf1 Jan 2026
Withdrawal Update Form 2File: PP2 FORM 2 - SEP 2025.pdf1 Jan 2026
Withdrawal Update Form 3File: PP2 FORM 3 - SEP 2025.pdf1 Jan 2026
Form 1File: FORM 1 PP2.pdf23 Aug 2025
Form 2File: FORM 2 PP2.pdf23 Aug 2025
Form 3File: FORM 3 PP2 - SIGNED.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY PP2.pdf23 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_PRITHVI PRIDE 2 Q4-SIGNED.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 2025 PP2.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2025 PP2.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_PP2_Q3 DEC 2024-SIGNED.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: PP2 SOLD AND UNSOLD REVISED 31 12 2024.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_PP2_REVISED.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PP2 SIGNED Q2 SEP 24 SIGNED.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PP2 FORM 1 ARCH CER 29 09 2024.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PP2 FORM 1 ARCH CER 18 12 2024.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PP2 FORM 2 ENG CER SEP 2024.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PP2 FORM 2 ENG CER DEC 2024.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PRITHVI PRIDE BLDG NO 02 FORM 1 MARCH 2024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 2 BLDG NO 02 APR-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG NO 02 APR-24.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: DECLARATION QPR APR TO JUNE 24.pdf23 Jul 2024
Other - LegalFile: DECLARATION QPR APR TO JUNE 24.pdf23 Jul 2024
Other - FinanceFile: DECLARATION QPR APR TO JUNE 24.pdf23 Jul 2024
Other - TechnicalFile: DECLARATION QPR APR TO JUNE 24.pdf23 Jul 2024
Declaration in FORM BFile: PP-2 Extension Form-B.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -PP 3 REVISED.pdf24 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION REVISED PP 2.pdf24 Jun 2024
Copy of the legal title reportFile: PRITHVI PRIDE TITLE REPORT ADV DG NAIK.pdf16 May 2024
Declaration about Commencement CertificateFile: DECLARATION CC PRITHVI PRIDE BLDG NO 02.pdf16 May 2024
Other - LegalFile: PARTNERSHIP DEED LATEST - converted.pdf16 May 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING BLDG NO 02.pdf16 May 2024
Other - TechnicalFile: CC VERIFICATION MAIL.pdf16 May 2024
Other - TechnicalFile: PARTNERSHIP DEED LATEST - converted.pdf16 May 2024
Other - TechnicalFile: DECLARATION ON CC NAME.pdf16 May 2024
Layout approvalFile: LAYOUT HL.pdf11 Apr 2024
Building plan approvalFile: BLDG PLAN BLDG NO 2 (2 OF 3) HL.pdf11 Apr 2024
Copy of Layout Approval (in case of layout)File: LAYOUT HL.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN BLDG NO 2 (2 OF 3) HL.pdf11 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR MADHAV KODE.pdf11 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR DINESH YADAV.pdf11 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR JANARDAN YADAV.pdf11 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR PRAVIN SHAH.pdf11 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MR RAJESH YADAV.pdf11 Apr 2024
Proforma of Allotment letterFile: allotment letter.pdf11 Apr 2024
Proforma of Agreement for saleFile: PRITHVI PRIDE BLDG NO 02 AGREEMENT.pdf11 Apr 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTEMTN PRITHVI PRIDE BLDG NO 02.pdf11 Apr 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT PRITHVI PRIDE BLDG NO 02.pdf11 Apr 2024
Other - TechnicalFile: DECLARATION PLOT AREA BLDG NO 02.pdf11 Apr 2024
PAN CardFile: 1 COMPANY PAN CARD PLD.pdf10 Apr 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FOR FINANCE PRITHVI PRIDE BLDG NO 02.pdf10 Apr 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FOR LEGAL PRITHVI PRIDE BLDG NO 02.pdf10 Apr 2024
Details of encumbrances concerned to LegalFile: DECLARATION FOR FINANCE PRITHVI PRIDE BLDG NO 02.pdf10 Apr 2024
Details of encumbrances concerned to LegalFile: DECLARATION FOR LEGAL PRITHVI PRIDE BLDG NO 02.pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: PRITHVI PRIDE BLDG NO 02 CC HL.pdf10 Apr 2024
Declaration in FORM BFile: RERA FORM-B BLDG NO-2.pdf10 Apr 2024
CERSAI detailsFile: CERSAI DECLARATION PRITHVI PRIDE BLDG NO 02.pdf10 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PRITHVI PRIDE PHASE-IP51800008848MIRA ROAD EAST, Thane165Aug 2017OngoingOct 2022Registered original: Sep 2021Not delivered

How this compares with Thane

6%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRITHVI PRIDE BUILDING NO 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

Builder: PRITHVI LAND DEVELOPERS

PRITHVI LAND DEVELOPERS has 3 registrations on MahaRERA, including PRITHVI PRIDE PHASE-I and PRITHVI PRIDE BUILDING NO 2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PRITHVI PRIDE BUILDING NO 2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRITHVI PRIDE BUILDING NO 2?

The registered promoter entity is PRITHVI LAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRITHVI PRIDE BUILDING NO 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRITHVI PRIDE BUILDING NO 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRITHVI PRIDE BUILDING NO 2?

The professionals named in the filing: Architect: TEJ'S CONSULTANTS; Architect: TEJS CONSULTANTS; Engineer: JITEN PATEL; Chartered Accountant: ACG AND ASSOCIATES; Chartered Accountant: STR & ASSOSIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRITHVI PRIDE BUILDING NO 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRITHVI PRIDE BUILDING NO 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRITHVI PRIDE BUILDING NO 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.