Home / Browse projects / Pune, Maharashtra / PRISTINE PRONEXT

Completed No litigation declared Others project

PRISTINE PRONEXT

By PRISTINE DEVELOPERS

RG-MH-53875 · RERA P52100018913 · Last updated on MahaRERA portal: 22 Nov 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

PRISTINE PRONEXT is a Others project by PRISTINE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100018913 on 12 Dec 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NamePRISTINE PRONEXT
  • TypeOthers
  • Location
    • PINK CITY ROAD
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018913
  • ReraGenie IDRG-MH-53875

Builder

  • NamePRISTINE DEVELOPERS
  • Entity typePartnership
  • PartnerSachin Ishwarchand Goyal
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPENA140000
B TYPENA140000
C TYPENA120000
D TYPENA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

A TYPE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B TYPE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C TYPE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D TYPE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered164
BuildingClosed/CoveredTotal
A TYPE4949
B TYPE5050
C TYPE4040
D TYPE2525

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10018.59
Proposed, not sanctioned10,019 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJINAGAR PUNE 411005

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKALP DESIGNERS
EngineerMILIND KULKARNI
EngineerYUVRAJ PAWAR
Chartered AccountantKAILASH AGARWAL & ASSOCIATES
Chartered AccountantR D KABRA & ASSOCIATES
PartnerRole in project
PRISTINE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2022

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: form3 asof 31-03-22.pdf22 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Pristine developers Form 5.pdf22 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE FORM 2.pdf20 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCITY REGISTRATION CERTIFICATE.pdf10 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: 1650951649768_NAME RESERVATION LETTER_0001.pdf28 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CREFIFICATE.pdf12 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate -FORM 1.pdf26 Mar 2022
Architect’s Certificate on Completion of Project (Form 4)File: Architect's Certificate(FORM 4 ).pdf26 Mar 2022
Certificates of CA (Form 3)File: Pristine Developers Pronext March 21 Form 3.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PRISTINE DEVELOPERS Pronext Form 5.pdf16 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect qtr1.pdf19 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2 Scaned qtr-4.pdf19 Aug 2021
Certificates of CA (Form 3)File: form3 rera Pronext.pdf19 Aug 2021
Certificates of CA (Form 3)File: PRESTINE PRO NEXT 22-6-2020 (1).pdf19 Aug 2021
Form 2AFile: QTR-JUN-20.pdf21 Jun 2021
Form 2AFile: Yearly 2A Certificate.pdf21 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QTR-JUN-20.pdf21 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Pristine Pronext.pdf30 Mar 2021
Details of Restarting of Construction work post lockdownFile: Pronext Pronext Pronext.pdf19 Aug 2020
Layout approvalFile: sanction plan.pdf26 Feb 2020
Copy of Layout Approval (in case of layout)File: sanction plan.pdf26 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC3.pdf26 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC 2.pdf26 Feb 2020
Form 2AFile: PN - JAN 2019.pdf12 Feb 2020
Form 2AFile: PN - JUL 2019.pdf12 Feb 2020
Form 2AFile: PN - OCT 2019.pdf12 Feb 2020
Form 2AFile: PN - JAN 2020.pdf12 Feb 2020
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Pristine Pronext.pdf29 Sep 2019
Details of encumbrancesFile: mortgage index_compressed.pdf27 May 2019
Declaration in FORM BFile: form b.pdf25 May 2019
Declaration in FORM BFile: Form B.pdf25 May 2019
OtherFile: letter to rera.pdf25 May 2019
Form 2AFile: Quality Assurance pronext-1.pdf9 Apr 2019
Layout approvalFile: 1st sanction - layout.pdf10 Dec 2018
Copy of the legal title reportFile: SEARCH AND TITLE.pdf10 Dec 2018
Copy of Layout Approval (in case of layout)File: 1st sanction - layout.pdf10 Dec 2018
Certificates of CA (Form 3)File: FORM 3 SCANNED.pdf10 Dec 2018
Proforma of Allotment letterFile: FLAT AGREEMENT.pdf10 Dec 2018
Building plan approvalFile: 1st page.pdf8 Dec 2018
Layout approvalFile: 1st page.pdf8 Dec 2018
PAN CardFile: PAN CARD.pdf8 Dec 2018
Details of encumbrancesFile: Details of encumbrances.pdf8 Dec 2018
Copy of Layout Approval (in case of layout)File: 1st page.pdf8 Dec 2018
Building Plan Approval (IOD)File: 1st page.pdf8 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 2 (1).pdf8 Dec 2018
Declaration in FORM BFile: Form B.pdf8 Dec 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRISTINE CITY PART 1GAT NO. 157 PRISTINE CITY OPP WEIKFIELD COMPANY BAKORI PUNE 412207261CompletedJan 2016Jan 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRISTINE PRONEXT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmPRISTINE PRONEXTCompleted 84Lapsed / revoked 31Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 267 registered projects within 2 km.

Builder: PRISTINE DEVELOPERS

PRISTINE DEVELOPERS has 4 registrations on MahaRERA, including PRISTINE CITY BEF and Pristine Prolife III. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRISTINE PRONEXT is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRISTINE PRONEXT?

The registered promoter entity is PRISTINE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRISTINE PRONEXT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRISTINE PRONEXT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRISTINE PRONEXT?

The professionals named in the filing: Architect: SANKALP DESIGNERS; Engineer: MILIND KULKARNI; Engineer: YUVRAJ PAWAR; Chartered Accountant: KAILASH AGARWAL & ASSOCIATES; Chartered Accountant: R D KABRA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRISTINE PRONEXT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRISTINE PRONEXT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRISTINE PRONEXT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.