PRIMROSE TOWER

By ROHAN VINAYAKRAO RAROKAR

RG-MH-89577 · RERA P50500052859 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
10 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

PRIMROSE TOWER is a Residential / Group Housing project by ROHAN VINAYAKRAO RAROKAR in Nagpur, Maharashtra, registered with MahaRERA as P50500052859 on 5 Oct 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. 18 of the 28 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRIMROSE TOWER
  • TypeResidential / Group Housing
  • Location
    • HINGNA ROAD
    • NIRMAL SHRISHTI - II
    • Turakmari
    • Hingna
    • Nagpur
    • 441122
  • Pincode441122
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500052859
  • ReraGenie IDRG-MH-89577

Builder

  • NameROHAN VINAYAKRAO RAROKAR
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2023PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Oct 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

64%18 of 28 units booked
100.0%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDENTIALNA9728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

RESIDENTIAL: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered1
Open Space22

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,021 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on15 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI2738.8
Proposed, not sanctioned2,739 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 276, GROUND FLOOR, CENTRAL AVENUE ROAD, WARDHMAN NAGAR, NAGPUR-440008
Estimated costRs 5.96 cr
Cost incurredRs 5.96 cr
Work done100.0%
BuildingWingEstimatedIncurred
RESIDENTIALNARs 5.96 crRs 5.96 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAGYA SANJAY GUPTA
EngineerShubham Jawahar Patle
Chartered AccountantVIBHOR KALAMKAR
Chartered AccountantPRASHANT SHARMA
PartnerRole in project
ROHAN VINAYAKRAO RAROKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Nivi Form 5 FY 23-24.pdf25 Jun 2026
Form 5 (FY 2024-2025)File: Nivi Form 5 Fy 24-25.pdf25 Jun 2026
Form 5 (FY 2025-2026)File: Nivi Form 5 FY 25-26.pdf25 Jun 2026
Occupational CertificateFile: OC Certificate.pdf25 Jun 2026
Occupational CertificateFile: Form 4 Architect Certificate-(5).pdf25 Jun 2026
Occupational CertificateFile: Form 1 Architect Withdrawal Application Form1 (2)(3).pdf25 Jun 2026
Occupational CertificateFile: Nivi RERA CA FINAL CERTICATE.pdf25 Jun 2026
Occupational CertificateFile: Affidavit about Association.pdf25 Jun 2026
Withdrawal Update Form 1File: ARCHTECT March-26.pdf5 May 2026
Withdrawal Update Form 2File: Engineer Certif march 2026.pdf5 May 2026
Withdrawal Update Form 3File: Form 3 March-26 NIVI_compressed.pdf5 May 2026
Withdrawal Update Form 1File: ARCHTECT 31 DEC -2025.pdf12 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Dt 31-12-25(2)(2).pdf12 Apr 2026
Withdrawal Update Form 3File: CA CERT QTR 3RD 25-26.pdf12 Apr 2026
Withdrawal Update Form 1File: Architect 31st sep2025.pdf16 Feb 2026
Withdrawal Update Form 2File: FORM 2-Engineer Certificate JUNE - 25.pdf16 Feb 2026
Withdrawal Update Form 3File: CA certificate 2nd qtr Oct to sep-25.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect 31st JUNE 2025.pdf1 Feb 2026
Withdrawal Update Form 2File: FORM 2-Engineer Certificate JUNE - 25.pdf1 Feb 2026
Withdrawal Update Form 3File: CA certificate Apr to June -25.pdf1 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 25.pdf16 Jul 2025
Form 1File: Architect 31st March 2025.pdf16 Jul 2025
Form 2File: 04 FORM 2-Engineer Certificate March - 25.pdf16 Jul 2025
Form 3File: Nivi RERA March-25.pdf16 Jul 2025
Withdrawal Update Form 1File: Architect 31st March 2025.pdf8 Jul 2025
Withdrawal Update Form 2File: 04 FORM 2-Engineer Certificate March - 25.pdf8 Jul 2025
Withdrawal Update Form 3File: Nivi RERA March-25.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 31st Dec 2024.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 FORM 2-Engineer Certificate June - 24.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 FORM 2-Engineer Certificate Sept - 24.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 FORM 2-Engineer Certificate Dec - 24.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 June-24.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sep-24.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dec-24.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold June-24.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Sept-24.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Dec-24.pdf9 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: IDBI Bank Format B.pdf17 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DeclarationofRerabankAccount.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchitectReportDecember2023.pdf12 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchitectReportMarch2024.pdf12 Oct 2024
Disclosure of sold/ booked inventoryFile: BookingInventoryDecember2023.pdf12 Oct 2024
Disclosure of sold/ booked inventoryFile: BookingInventoryMarch2024.pdf12 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACertificatDecember2023.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACertificatMarch2024.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 EngineerCertificate 31st March 24.pdf9 Oct 2024
Layout approvalFile: Amalgamation Map_compressed.pdf28 Jul 2023
Layout approvalFile: 4567 MARGE PLOT RL.pdf28 Jul 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LR DT 26-7-23.pdf28 Jul 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LR DT 26-7-23.pdf28 Jul 2023
Copy of Layout Approval (in case of layout)File: Amalgamation Map_compressed.pdf28 Jul 2023
Copy of Layout Approval (in case of layout)File: 4567 MARGE PLOT RL.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 001 FORM 3_merged.pdf21 Jul 2023
CERSAI detailsFile: CERSAI REPORT 20-7-23.pdf19 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 BANK SAPERATE3 ACCOUNT DECLARATION.pdf16 Jul 2023
Proforma of Agreement for saleFile: draft agreement (1).pdf6 Jul 2023
Deviation Report with respect to Allotment letterFile: Allotment DEVIATION CERTIFICATE.pdf6 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT TO SALE_compressed.pdf6 Jul 2023
Proforma of Allotment letterFile: Allotment letter_compressed.pdf4 Jul 2023
Building plan approvalFile: PLAN APPROVAL.pdf28 Jun 2023
PAN CardFile: MY PAN CARD New.pdf28 Jun 2023
Copy of the legal title reportFile: TITLE REPORT_compressed.pdf28 Jun 2023
Details of encumbrances concerned to FinanceFile: FORMAT - 2 NO INCUMBRANCE CERTIFRICATE.pdf28 Jun 2023
Details of encumbrances concerned to LegalFile: FORMAT - 2 NO INCUMBRANCE CERTIFRICATE.pdf28 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN APPROVAL.pdf28 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMIT.pdf28 Jun 2023
Declaration about Commencement CertificateFile: FORMAT - D DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf28 Jun 2023
Declaration in FORM BFile: FORM B_compressed.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE - A SADHYA PAPER.pdf28 Jun 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NIRMAL SHRISHTI - IIP50500028101TURAKMARI, Nagpur79Jan 2021CompletedJun 2023Jul 2022
NIRMAL SHRISHTI - IP50500026343PH NO 77, Nagpur12Sep 2020CompletedJun 2023Aug 2022

How this compares with Nagpur

64%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIMROSE TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NIRMAL SHRISHTI - II2,800+ in Nagpur

2 kmPRIMROSE TOWERCompleted 1Lapsed / revoked 3Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: ROHAN VINAYAKRAO RAROKAR

ROHAN VINAYAKRAO RAROKAR has 3 registrations on MahaRERA, including NIRMAL SHRISHTI - I and NIRMAL SHRISHTI - II. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if PRIMROSE TOWER is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIMROSE TOWER?

The registered promoter entity is ROHAN VINAYAKRAO RAROKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIMROSE TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIMROSE TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIMROSE TOWER?

The professionals named in the filing: Architect: PRAGYA SANJAY GUPTA; Engineer: Shubham Jawahar Patle; Chartered Accountant: VIBHOR KALAMKAR; Chartered Accountant: PRASHANT SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIMROSE TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIMROSE TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIMROSE TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.