Home / Browse projects / Pune, Maharashtra / PRIDE PLATINUM
PRIDE PLATINUM
RG-MH-12960 · RERA P52100021636 · Last updated on MahaRERA portal: 17 Feb 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRIDE PLATINUM is a Residential / Group Housing project by PLATINUM CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100021636 on 15 Jul 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.
At a glance
Project
- NamePRIDE PLATINUM
- TypeResidential / Group Housing
- Location
- BANER
- Haveli
- Pune
- 411045
- Pincode411045
- RERA no.P52100021636
- ReraGenie IDRG-MH-12960
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2019
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings2 building records
- Documents filed57 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRIDE PLATINUM I | NA | 22 | 0 | 0 | 0 | 0 |
| PRIDE PLATINUM J | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
PRIDE PLATINUM I100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PRIDE PLATINUM J100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed179
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| PRIDE PLATINUM I | 89 | 89 |
| PRIDE PLATINUM J | 90 | 90 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PINNAC AECL CONSULTANCY |
| Partner | Role in project |
|---|---|
| PLATINUM CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Jan 2024
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: C A CERT PRIDE PLATINUM 19012024.pdf | 17 Feb 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Pride Platinum Complection form 4.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT PLATINUM I J 31122023.pdf | 9 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT PLATINUM I J 31122023.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTY ASSURANCE CERT PLATINUM I J 31122023.pdf | 8 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PRIDE PLATINUM SOCIETY FORMATION.pdf | 8 Jan 2024 |
| Declaration in FORM BFile: AFF CUM DECLARATION PRIDE PLATINUM I J 02022024.pdf | 4 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAILS PRIDE PLATINUM I J 04012024.pdf | 4 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 NOV 2023.pdf | 4 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Pride Platinum Occupancy Certificate.pdf | 2 Jan 2024 |
| Other - TechnicalFile: Platinum OC mail by PMC to MAHARERA.pdf | 2 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A CERT PLATINUM 01112023.pdf | 10 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Platinum Quality.pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Certificate.pdf | 26 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PCEngineer Cerificate 2023.pdf | 26 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Platinum Quality.pdf | 26 May 2023 |
| Certificates of CA (Form 3)File: PC FORM 3 Signed DSC.pdf | 26 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 PLATINUM 21112022.pdf | 26 May 2023 |
| Layout approvalFile: REvised layout.pdf | 17 Apr 2023 |
| Building plan approvalFile: Revised plan.pdf | 17 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: REvised layout.pdf | 17 Apr 2023 |
| Building Plan Approval (IOD)File: Revised plan.pdf | 17 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Platinum Quality.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT PLATINUM I J 31122022.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT PLATINUM I J 31122022.pdf | 20 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT PLATINUM I J 31122022.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 PLATINUM 23022021.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 PLATINUM 23022021.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 PRIDE PLATINUM 21112022.pdf | 24 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PLATINUM QTY ASSURANCE CERT 30092022.pdf | 14 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PRIDE PLATINUM PLUS QUALITY ASSURANCE CERTIFICATE JAN-FEB-MAR 2022.pdf | 12 Apr 2022 |
| Certificates of CA (Form 3)File: Signd Form 3 Platinum.pdf | 2 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: qulity platinum construction.pdf | 8 Jan 2022 |
| CERSAI detailsFile: Platinum Construction.pdf | 8 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSUARANCE CERTIFICATE PRIDE PLATINUM PLUS I-J JUL-AUG-SEP 2021.PDF | 15 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Platinum CC.pdf | 16 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT PLATINUM PH II.pdf | 16 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY PLATINUM.PDF | 16 Aug 2021 |
| Certificates of CA (Form 3)File: SIGNED Form 3 Platinum Construction.pdf | 16 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSUARANCE CERTIFICATE PRIDE PLATINUM.PDF | 11 May 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QTY ASSURANCE CERT PLATINUM 03012021.pdf | 13 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSUARANCE CERTIFICATE PRIDE PLATINUM PLUS I-J JUL to SEP 2020_compressed.pdf | 16 Oct 2020 |
| Details of encumbrancesFile: SELF DECLARATION IJ BLDG.pdf | 11 Jul 2019 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION IF BLDG.pdf | 11 Jul 2019 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 11 Jul 2019 |
| Building plan approvalFile: LAYOUT.pdf | 9 Jul 2019 |
| Layout approvalFile: SUBJECT PLOT.pdf | 9 Jul 2019 |
| Building plan approvalFile: ODD FLOOR PLAN.pdf | 9 Jul 2019 |
| Building plan approvalFile: FIRST FLOOR PLAN.pdf | 9 Jul 2019 |
| Copy of the legal title reportFile: PLATINUM TITLE REPORT.pdf | 9 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: SUBJECT PLOT.pdf | 9 Jul 2019 |
| Building Plan Approval (IOD)File: LAYOUT.pdf | 9 Jul 2019 |
| Building Plan Approval (IOD)File: ODD FLOOR PLAN.pdf | 9 Jul 2019 |
| Building Plan Approval (IOD)File: FIRST FLOOR PLAN.pdf | 9 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE.pdf | 9 Jul 2019 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 9 Jul 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
Keep PRIDE PLATINUM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BANER13,700+ in Pune
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: PLATINUM CONSTRUCTION
Platinum Construction has 2 registrations on MahaRERA, including PLATINUM RESIDENCY and PRIDE PLATINUM. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PRIDE PLATINUM is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRIDE PLATINUM?
The registered promoter entity is PLATINUM CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRIDE PLATINUM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRIDE PLATINUM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRIDE PLATINUM?
The professionals named in the filing: Architect: PINNAC AECL CONSULTANCY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRIDE PLATINUM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback