Registered No litigation declared Residential / Group Housing project

Pride Panorama

By Landcare Realty LLP

RG-MH-95656 · RERA P51800048083 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 85%
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Pride Panorama is a Residential / Group Housing project by Landcare Realty LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048083 on 8 Dec 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NamePride Panorama
  • TypeResidential / Group Housing
  • Location
    • Andheri Kurla Road
    • Sakinaka
    • Village Mohili
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048083
  • ReraGenie IDRG-MH-95656

Builder

  • NameLandcare Realty LLP
  • Entity typeOthers
  • Named personSanjay Baboo Jain
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed99 files

Current status

26.9%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WingNA160000
E WingNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 85%.

D Wing69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E Wing69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed135

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots135
Closed/Covered135
BuildingClosed/CoveredTotal
D Wing6868
E Wing6767

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,384 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Fizza Alihusain Boxwala & OthersPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8859.63
Proposed, not sanctioned8,860 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch386 Veer Sawarkar Marg opp Siddhivinayak Mandir Prabhadevi Mumbai
Estimated costRs 105
Cost incurredRs 28
Work done26.85%
BuildingWingEstimatedIncurred
-NARs 52Rs 14
E WingNARs 27Rs 7
D WingNARs 26Rs 7

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMandviwala Qutub & Associates
ArchitectSpaceage Consultants
EngineerJW Consultant
EngineerEngineering Creation Services Consultant
EngineerM B Andurlekar & Associates
EngineerRAHUL ALDAR
Chartered AccountantSP Jain & Associates
PartnerRole in project
Landcare Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf18 Apr 2026
Form 2File: Form 2.PDF18 Apr 2026
Form 3File: Form 3 - Landcare.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf18 Apr 2026
OthersFile: Form 3 - Promoter.pdf18 Apr 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Landcare.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Landcare.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Landcare.pdf16 Jan 2026
Form 3File: Form 3.pdf17 Oct 2025
OthersFile: Form 3 - Promoter.pdf17 Oct 2025
Form 1File: Form 1.pdf17 Oct 2025
Form 2File: Form 2.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Invetory.pdf17 Oct 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: FORM - 2.pdf18 Jul 2025
Form 3File: Form 3 -Owner.pdf18 Jul 2025
OthersFile: Form 3 - Promoter.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3 -Owner.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - PII.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - PII.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - PII - Promoter.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 - PI.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 - PII.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A - PII.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Landcare.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Promoter.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 -.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 3 -.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate - PII.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate_Phase_II.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - PII - Owner.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - PII -Landcare.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PII.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate P II.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Landcare - Phase II.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Promoter - Phase II.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate Phase II.pdf19 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Phase II.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase II.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase II - Landowner.pdf19 Jun 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf30 Nov 2022
Layout approvalFile: IOD Letter.pdf12 Oct 2022
Building plan approvalFile: IOD 1.pdf12 Oct 2022
Building plan approvalFile: IOD 2.pdf12 Oct 2022
Building plan approvalFile: IOD 3.pdf12 Oct 2022
Building plan approvalFile: IOD 4.pdf12 Oct 2022
Building plan approvalFile: IOD 5.pdf12 Oct 2022
Building plan approvalFile: IOD 6.pdf12 Oct 2022
Building plan approvalFile: IOD 7.pdf12 Oct 2022
Building plan approvalFile: IOD 8.pdf12 Oct 2022
Building plan approvalFile: IOD 9.pdf12 Oct 2022
Building plan approvalFile: IOD 10.pdf12 Oct 2022
Building plan approvalFile: IOD 11.pdf12 Oct 2022
Copy of Layout Approval (in case of layout)File: IOD Letter.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 1.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 2.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 3.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 4.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 5.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 6.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 7.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 8.pdf12 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD 9.pdf12 Oct 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pride Panorama on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sakinaka, Village Mohili6,700+ in Mumbai Suburban

2 kmPride PanoramaCompleted 52Lapsed / revoked 26Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 120 registered projects within 2 km.

Builder: Landcare Realty LLP

Landcare Realty LLP has 2 registrations on MahaRERA, including Pride Panorama and Pride Panorama. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Pride Panorama is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pride Panorama?

The registered promoter entity is Landcare Realty LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pride Panorama?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pride Panorama?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pride Panorama?

The professionals named in the filing: Architect: Mandviwala Qutub & Associates; Architect: Spaceage Consultants; Engineer: JW Consultant; Engineer: Engineering Creation Services Consultant; Engineer: M B Andurlekar & Associates; Engineer: RAHUL ALDAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pride Panorama?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pride Panorama. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pride Panorama to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.