ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Presidential Park Phase 2

Registered No litigation declared Plotted project

Presidential Park Phase 2

By Oneness Realtors

RG-MH-96641 · RERA P52100054843 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 22 months from the original
12 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Presidential Park Phase 2 is a Plotted project by Oneness Realtors in Pune, Maharashtra, registered with MahaRERA as P52100054843 on 15 Feb 2024. Possession is promised by 31 Oct 2026. The completion date has moved by 22 months from the original filing. 27 of the 39 units on this registration are recorded sold or booked.

At a glance

Project

  • NamePresidential Park Phase 2
  • TypePlotted
  • Location
    • Gat No. 37P
    • Mauje Sate
    • Taluka- Maval
    • Pune- 412106.
    • Mawal
    • Sate
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054843
  • ReraGenie IDRG-MH-96641

Builder

  • NameOneness Realtors
  • Entity typePartnership
  • PartnersVinod Kishanchand Matani, Kishin Hotchand Matani
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2024First promiseDec 2024Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2024)
  • BuildingsNot stated in filing
  • Documents filed84 files

Current status

69%27 of 39 units booked
100.0%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area22,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Dec 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority Pune

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIcici Bank Ltd, Shop No 20-21, Jarvari Society, Pimple Saudagar, Pune- 411027
Estimated costRs 83.74 lakh
Cost incurredRs 83.74 lakh
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 83.74 lakhRs 83.74 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtit Admulwar Planners (OPC) PVT. LTD.
EngineerRohinee Badgujar
EngineerSANJAY R RAMARAP
Chartered AccountantPravin Pise and Associates
Chartered AccountantRavi Pahlani
Chartered AccountantK N J Associates
PartnerRole in project
Oneness Realtors-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024939Dec 2024 → Dec 2025

Reason as filed by the promoterWe are unable to commence construction due to significant financial constraints arising from unforeseen circumstances, such as rising material costs and changes in lending policies. These challenges have disrupted our cash flow despite careful planning and responsible allocation of collected funds toward pre-construction activities. To address this, we are actively pursuing additional funding avenues, renegotiating terms with vendors, and implementing cost optimization measures. We are committed to complete all construction activities by 31/12/2025. We sincerely request MahaRERA’s understandin

EA29122519110Dec 2024 → Oct 2026

Reason as filed by the promoterIt is respectfully submitted that all construction activities of the project have been completed in all respects, and the documentation process for obtaining the Completion Certificate is currently in progress. However, the issuance of the Completion Certificate has been delayed due to non-availability of concerned officers at PCMC Corporation, as they are presently engaged in election-related duties. The delay is purely administrative and beyond the control of the promoter. The allottees/customers are fully informed of the situation and are extending their full cooperation, and no objections

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Presedentital ph 2.pdf24 Jul 2026
Withdrawal Update Form 2File: Form 2 Presedentital.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3 Presedentital Ph 2.pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1 (2).pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 Presedential Ph 2.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 RERA - issued_Sate - 31-03-2026_Signed (2) (1) (1) (1)_page-0001.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf27 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf27 Mar 2026
Withdrawal Update Form 3File: F3 Phase2.pdf27 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 (6) (1)_FY 2024-25 (2) (1).pdf24 Mar 2026
Form 1File: Final F1.pdf19 Mar 2026
Form 2File: ENGINEER CERTIFICATE_0001.pdf19 Mar 2026
Form 3File: Form 3 RERA - issued_Sate - 31_12_2024.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold (1).pdf19 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 (8) (1)_FY 2023-24 (1) (1).pdf19 Mar 2026
Form 2A (FY 2023-2024)File: 23-24.pdf20 Feb 2026
Form 2A (FY 2024-2025)File: 24-25.pdf20 Feb 2026
Form 2A (FY 2025-2026)File: 25-26.pdf20 Feb 2026
Form 1File: Form 1.pdf14 Feb 2026
Form 2File: Form 2.pdf14 Feb 2026
Form 3File: Form 3 March.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold PHASE II (1).pdf14 Feb 2026
Form 1File: Form 1 Sep 2024.pdf30 Jan 2026
Form 2File: Form 2 Sep 2024.pdf30 Jan 2026
Form 3File: Form 3 Sep 2024.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: 4 Disclosure of sold_ booked inventory.pdf30 Jan 2026
Withdrawal Update Form 1File: Arrchitects Certificate June 25 (1).pdf29 Dec 2025
Withdrawal Update Form 1File: Arrchitects Certificate Sep 2025 (1) (1).pdf29 Dec 2025
Withdrawal Update Form 2File: presidential park phase 2 june 25 (2).pdf29 Dec 2025
Withdrawal Update Form 2File: presidential park phase 2sep (1) (1).pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 RERA - issued_Sate Q1 FY25-26 - 20_06_2025.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 RERA - issued_Sate Q2 FY25-26 - 30_09_2025 (4).pdf29 Dec 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 s.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf19 Jul 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 s.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf19 Jul 2025
Declaration in FORM BFile: presidential form b 2.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2023.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold March 2024.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 2024.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Sep 2024.pdf17 Dec 2024
Declaration about Commencement CertificateFile: pressidential 2.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A LATEST FORMAT 1.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arrchitects Certificate (1).pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arrchitects Certificate.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arrchitects Certificate (2).pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arrchitects Certificate (1).pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arrchitects Certificate (3).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 3 2024 PH 2.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 9 2024 PH 2.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 6 2024 PH 2.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 12 2023 PH 2.pdf13 Dec 2024
Other - TechnicalFile: Higlighted Layout.pdf10 Feb 2024
Other - LegalFile: Annexure A.pdf9 Feb 2024
Copy of the legal title reportFile: Sate Title Report_compressed.pdf23 Jan 2024
Other - LegalFile: Sale Deed comp1 to 60.pdf23 Jan 2024
Other - LegalFile: Sale Deed comp61 to 134.pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC MAil SS .pdf8 Jan 2024
CERSAI detailsFile: 1 CERSAI details (5) (1).pdf25 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SATE (1).pdf25 Dec 2023
Proforma of Agreement for saleFile: Agreement for sale Presidential park state.pdf25 Dec 2023
Proforma of Allotment letterFile: Allotment Form Sate_compressed.pdf25 Dec 2023
Building plan approval or NA orderFile: guvjyc012.pdf22 Dec 2023
Layout approvalFile: sate006_compressed (1).pdf22 Dec 2023
PAN CardFile: Pan of Firm.pdf22 Dec 2023
Copy of the legal title reportFile: SATE Search Title.pdf22 Dec 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (10) (1).pdf22 Dec 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (10) (1).pdf22 Dec 2023
Copy of Layout Approval (in case of layout)File: sate006_compressed (1).pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: guvjyc012.pdf22 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Com Sate_compressed.pdf22 Dec 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (38) (1).pdf22 Dec 2023
Declaration in FORM BFile: ONESS REALTORS PHASE 2.pdf22 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annuxure A Kishin Sir.pdf22 Dec 2023

How this compares with Pune

69%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 22 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Presidential Park Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mawal13,700+ in Pune

2 kmPresidential Park Phase Completed 5Lapsed / revoked 5Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: Oneness Realtors

Oneness Realtors has 2 registrations on MahaRERA, including Presidential Park Phase 1 and Presidential Park Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Presidential Park Phase 2 is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Presidential Park Phase 2?

The registered promoter entity is Oneness Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Presidential Park Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Presidential Park Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Presidential Park Phase 2?

The professionals named in the filing: Architect: Atit Admulwar Planners (OPC) PVT. LTD.; Engineer: Rohinee Badgujar; Engineer: SANJAY R RAMARAP; Chartered Accountant: Pravin Pise and Associates; Chartered Accountant: Ravi Pahlani; Chartered Accountant: K N J Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Presidential Park Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Presidential Park Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Presidential Park Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.