Home / Browse projects / Thane, Maharashtra / Precious Imperial
Precious Imperial
By RKR REALITY
RG-MH-30651 · RERA P51700030999 · Last updated on MahaRERA portal: 2 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Precious Imperial is a Others project by RKR REALITY in Thane, Maharashtra, registered with MahaRERA as P51700030999 on 29 Sep 2021. The registration is recorded completed; possession was promised by 31 Aug 2025.
At a glance
Project
- NamePrecious Imperial
- TypeOthers
- Location
- Ambernath
- Ambarnath(M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- RERA no.P51700030999
- ReraGenie IDRG-MH-30651
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Sep 2021
- Promised completion31 Aug 2025
- Revised completionNone
- Buildings1 building record
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Precious Imperial - Building 1 | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Precious Imperial - Building 1: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed58
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Amrut Laxmi Developers | Ambarnath(M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pramod Kamble |
| Engineer | Pramod Kamble |
| Chartered Accountant | Fatehchandani & Co |
| Chartered Accountant | Chanchlani & Associates |
| Partner | Role in project |
|---|---|
| RKR REALITY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Aug 2024
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: signed Form 5 RKR Reality precious Imperial.pdf | 2 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf | 12 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC.pdf | 12 Aug 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 [UT].pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR B01 Form 01 _ Q1 2024-25.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR B01 Form 02 REALITY B-01.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR Reality Ph 1 F1 31-12-2021.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RKR Reality_Precious Imperial_ Q4 2021-22_11zon.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR Reality Ph 1 F1 30-06-2022.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR Reality Ph 1 F1 30-09-2022.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR Reality Ph 1 F1 31-12-2022.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR Reality Ph 1 F1 31-03-2023.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR Reality Ph 1 F1 30-06-2023.pdf | 10 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR Reality Ph 1 F2 31-12-2021.pdf | 10 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RKR Eng Certificate Q4 2021-22.pdf | 10 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR Reality Ph 1 F2 30-06-2022.pdf | 10 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR reality Ph 1 F2 30-09-2022.pdf | 10 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR Reality Ph 1 F2 31-12-2022.pdf | 10 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR Reality Ph 1 F2 30-06-2023.pdf | 10 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RKR Reality Quality Assurance Cert Ph 1 31-03-2022.pdf | 10 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RKR Reality Quality Assurance Cert Ph 1 31-03-2023.pdf | 10 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RKR Reality Quality Assurance Cert Ph 1 31-03-2024.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 31-12-2021_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 31-03-2022_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 30-06-2022_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 30-09-2022_Comp.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 31-12-2022_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 30-06-2023_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 30-09-2023_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 31-12-2023_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 31-03-2024_11zon (1).pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 10-06-2024_11zon.pdf | 10 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR P-1 30-05-2024.pdf | 30 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A RKR.pdf | 30 May 2024 |
| Other - TechnicalFile: ANNEXURE A RKR PLOT.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR reality B1 Form 01 _Q4.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR reality B1 Form 02 _Q4.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR B01 FORM 01 Q3 2023-24 (Imperial).pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR B01 FORM 02 Q3 2023-24 (Imperail).pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PRECIOUS IMPERIAL FORM 5.pdf | 18 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKR B1 Form 1Q2_compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RKR FORM 2 B1 Q2_compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RKR Reality CA Certificate Mar23_11zon.pdf | 20 Apr 2023 |
| Layout approvalFile: 2022-4-24-11-57-24 1 5_11zon.pdf | 23 Mar 2023 |
| Building plan approvalFile: 2022-4-24-11-58-25 2 5_11zon.pdf | 23 Mar 2023 |
| Building plan approvalFile: 2022-4-24-11-59-31 3 5_11zon.pdf | 23 Mar 2023 |
| Building plan approvalFile: 2022-4-24-12-0-28 4 5_11zon.pdf | 23 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: 2022-4-24-11-57-24 1 5_11zon.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2022-4-24-11-58-25 2 5_11zon.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2022-4-24-11-59-31 3 5_11zon.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2022-4-24-12-0-28 4 5_11zon.pdf | 23 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RKR Reality Form 5 RERA.pdf | 17 Jan 2023 |
| Declaration about Commencement CertificateFile: Latest Form D Declaration.pdf | 16 Sep 2021 |
| Copy of the legal title reportFile: 2A Search Report.pdf | 10 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate.pdf | 10 Sep 2021 |
| Proforma of Allotment letterFile: 8 RERA Draft Agreement.pdf | 10 Sep 2021 |
| Layout approvalFile: 7 RKR PLAN COPY.pdf | 9 Sep 2021 |
| Building plan approvalFile: 5 Commencement Certificate.pdf | 9 Sep 2021 |
| PAN CardFile: 1 PAN of Firm.pdf | 9 Sep 2021 |
| Copy of the legal title reportFile: 2 Legal Title Report.pdf | 9 Sep 2021 |
| Details of encumbrancesFile: 4 No Encumbrance.pdf | 9 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: 7 RKR PLAN COPY.pdf | 9 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Commencement Certificate.pdf | 9 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 5 Commencement Certificate.pdf | 9 Sep 2021 |
| Declaration in FORM BFile: 10 Form B Builder.pdf | 9 Sep 2021 |
| Proforma of Allotment letterFile: 9 Draft Allotment.pdf | 9 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
Keep Precious Imperial on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ambernath7,600+ in Thane
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: RKR REALITY
RKR REALITY has 4 registrations on MahaRERA, including Precious Imperial and PRECIOUS IMPERIAL PHASE II. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Precious Imperial is delayed beyond 31 Aug 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Precious Imperial?
The registered promoter entity is RKR REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Precious Imperial?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Precious Imperial?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Precious Imperial?
The professionals named in the filing: Architect: Pramod Kamble; Engineer: Pramod Kamble; Chartered Accountant: Fatehchandani & Co; Chartered Accountant: Chanchlani & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Precious Imperial?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback