Home / Browse projects / Thane, Maharashtra / PRECIOUS ICON PHASE II

Registered No litigation declared Residential / Group Housing project

PRECIOUS ICON PHASE II

By RKR Construction

RG-MH-31229 · RERA P51700079563 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
68 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

PRECIOUS ICON PHASE II is a Residential / Group Housing project by RKR Construction in Thane, Maharashtra, registered with MahaRERA as P51700079563 on 12 Mar 2025. Possession is promised by 30 Mar 2028. 4 of the 72 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NamePRECIOUS ICON PHASE II
  • TypeResidential / Group Housing
  • Location
    • Survey No.49
    • Hissa No. 10C
    • Mouje - Pale
    • Ambernath
    • Pali
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079563
  • ReraGenie IDRG-MH-31229

Builder

  • NameRKR Construction
  • Entity typePartnership
  • GSTIN27AAXFR8885R1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHaresh Bhajanlal Matta, Jaydeep Ashok Bhoir, Swaraj Ashok Bhoir, Navin Ramesh Bansal, Ishwarlal Nathu Chavan, Suresh Dhanraj Dhameja, Deepak Murlidhar Matta
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredMar 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2025
  • Promised completion30 Mar 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed57 files

Current status

6%4 of 72 units booked
48.1%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3NA8832032
BUILDING NO 4NA8840040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

BUILDING NO 330%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 430%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed99

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots99
Open Space99
BuildingOpen SpaceTotal
BUILDING NO 34444
BUILDING NO 45555

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,394 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Ishwari Anand SonesarUlhasnagar (M Corp.)Thane
Manoj Anand SonesarUlhasnagar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI3855.26
Proposed, not sanctioned3,855 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANGA APARMENT, SHOP NO 1-4 NETAJI CHOWK, ULHASNAGAR E
Estimated costRs 14.07 cr
Cost incurredRs 6.77 cr
Work done48.13%
BuildingWingEstimatedIncurred
BUILDING NO 4NARs 7.04 crRs 3.87 cr
BUILDING NO 3NARs 5.27 crRs 2.90 cr
-NARs 1.76 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIrish Design Studio
EngineerM Nandwani Structural Consultants
Chartered AccountantFatehchandani & Co
Chartered AccountantMUKESH GURNANI
Chartered AccountantVRP & Associates
PartnerRole in project
RKR Construction-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2028

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 01 ICON 3 4 RKR Cosnt.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Icon 34 RKR Const.pdf20 Apr 2026
Withdrawal Update Form 3File: Signed Form 3 Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: 6 Form 01 CD ICON RKR Const.pdf20 Jan 2026
Withdrawal Update Form 1File: RKR CONST_BLDNG NO 3 ND 4.pdf20 Jan 2026
Withdrawal Update Form 2File: ICON Bldg No 3 4 Form 02 Q2 RKR Const.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 Precious Icon Bldng No 3 nd 4.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 RKR Construction Phase II.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 RKR Construction Phase II.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: RKR construction- Form 5 scanned signed.pdf29 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3 RKR Construction Phase II Singed_11zon.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ICON B3 B4 Q4.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ICON Phase 3 4 Form 2 Q4.pdf21 Apr 2025
Other - FinanceFile: Icon II Land Owner Decleration.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKR Construction Phase II.pdf3 Mar 2025
Other - LegalFile: 2 Affidavit cum Declaration ICON BLDG 3 and 4.pdf28 Feb 2025
Other - LegalFile: 1b Death Certificate.pdf28 Feb 2025
Other - LegalFile: 1c 49 10 c new satbara sonesar 20-03.pdf28 Feb 2025
Other - LegalFile: 4 Verification of Commencement Certificate RKR Construction.pdf28 Feb 2025
Other - LegalFile: Form B affidavit Haresh Matta Rkr construction 27 02 25.pdf28 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 2 Form B Bank.pdf17 Feb 2025
Details of encumbrances concerned to FinanceFile: 1 NO ENCUMBRANCES ICON 3 and 4.pdf5 Feb 2025
Other - LegalFile: 6A Plan copy.pdf5 Feb 2025
Declaration about Commencement CertificateFile: 8 DECLARATION OF CC ICON 3 and 4.pdf5 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 4 FORMAT A BANK.pdf5 Feb 2025
Details of encumbrances concerned to LegalFile: 1 NO ENCUMBRANCES ICON 3 and 4.pdf5 Feb 2025
Proforma of Agreement for saleFile: 2 Draft Agreement.pdf5 Feb 2025
Layout approvalFile: 02 Plan copy-output.pdf16 Jan 2025
Building plan approvalFile: 02 Plan copy-output.pdf16 Jan 2025
PAN CardFile: RKR CONSTRUCTION PAN CARD.pdf16 Jan 2025
Copy of the legal title reportFile: 08 CD RKR 49_10 C title.pdf16 Jan 2025
Details of encumbrances concerned to FinanceFile: No encumbrances.pdf16 Jan 2025
Copy of Layout Approval (in case of layout)File: 02 Plan copy-output.pdf16 Jan 2025
Proforma of Allotment letterFile: allotment letter_11zon.pdf16 Jan 2025
Declaration in FORM BFile: Affidavit Form 'B' (HBM).pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 01 CD ICON RKR Const.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 FORM 2 ICON BLDG 3 and 4.pdf16 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Verification of Commencement Certificate RKR Construction.pdf16 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 9 CC RKR Const Wing 3 4.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 02 Plan copy-output.pdf16 Jan 2025
CERSAI detailsFile: Cersai Report.pdf16 Jan 2025
CERSAI detailsFile: CERSAI DECLARATION.pdf16 Jan 2025
Deviation Report with respect to Allotment letterFile: NO DEVIATION.pdf16 Jan 2025
Details of encumbrances concerned to LegalFile: No encumbrances.pdf16 Jan 2025
Other - TechnicalFile: ANNEXURE A.pdf16 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation report_11zon.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: HBM Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Swaraj Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SDD Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Navin Bansal Annexure A .pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Jaydeep Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Jagdish Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: IB Annexure A.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DMM Annexure A.pdf16 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: disclosure 15125.pdf16 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: CA Cert Loan Disc.pdf16 Jan 2025

How this compares with Thane

6%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRECIOUS ICON PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambernath7,600+ in Thane

2 kmPRECIOUS ICON PHASE IICompleted 51Lapsed / revoked 14Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 94 registered projects within 2 km.

Builder: RKR Construction

RKR Construction has 3 registrations on MahaRERA, including PRECIOUS ICON and PRECIOUS ICON PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PRECIOUS ICON PHASE II is delayed beyond 30 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRECIOUS ICON PHASE II?

The registered promoter entity is RKR Construction, a partnership as per the filing. Its GSTIN 27AAXFR8885R1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRECIOUS ICON PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRECIOUS ICON PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRECIOUS ICON PHASE II?

The professionals named in the filing: Architect: Irish Design Studio; Engineer: M Nandwani Structural Consultants; Chartered Accountant: Fatehchandani & Co; Chartered Accountant: MUKESH GURNANI; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRECIOUS ICON PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRECIOUS ICON PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRECIOUS ICON PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.