Home / Browse projects / Thane, Maharashtra / Precious Harmony NX

Registered No litigation declared Others project

Precious Harmony NX

By P.G. CONSTRUCTIONS

RG-MH-51691 · RERA P51700049260 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
27 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
110 of 179Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Precious Harmony NX is a Others project by P.G. CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700049260 on 3 Feb 2023. Possession is promised by 31 Dec 2026. 69 of the 179 units on this registration are recorded sold or booked, and 27 of 44 construction stages are filed complete.

At a glance

Project

  • NamePrecious Harmony NX
  • TypeOthers
  • Location
    • Survey No. 40 Hissa No. 1/2
    • Belawali
    • Ambernath
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049260
  • ReraGenie IDRG-MH-51691

Builder

  • NameP.G. CONSTRUCTIONS
  • Entity typePartnership
  • PartnersHaresh Bhajanlal Matta, Jitesh Kamlakar Ghorpade, Payal Avinash Patkar, Riya Ajay Patkar, Ajay Dattatray Patkar, Avinash Dattatray Patkar, Gaurav Kamlakar Ghorpade

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed69 files

Current status

39%69 of 179 units booked
85.0%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA8828432
B WingNA8728028
C WingNA8756056
D WingNA8763063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

A Wing72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
B Wing80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
C Wing80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
D Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes90%

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,930 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Manoj Ramkrishna NarkhedeDOMBIVLIThane
Pradeep Dagadu DhakeDOMBIVLIThane
Shridhar Dattatray PatilBadlapur (M Cl)Thane
Usha Shaligram GulveDOMBIVLIThane
Manoj R NarkhedeDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Nagarparishad
Permissible FSI8590.45
Proposed, not sanctioned8,590 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 51, Ved Bunglow, Near Old Talathi Office, Kulgaon Badlapur East, Badlapur 421503
Estimated costRs 23.84 cr
Cost incurredRs 20.28 cr
Work done85.04%
BuildingWingEstimatedIncurred
D WingNARs 7.36 crRs 7.36 cr
C WingNARs 6.63 crRs 5.97 cr
A WingNARs 4.41 crRs 2.64 cr
B WingNARs 3.46 crRs 3.11 cr
-NARs 1.99 crRs 1.19 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavindra Ghormode
EngineerAtul Kudtarkar and Associates Pvt Ltd
Chartered AccountantMukesh Gurnani
Chartered AccountantVRP & Associates
PartnerRole in project
P.G. CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 B and c wing.pdf24 Apr 2026
Withdrawal Update Form 2File: PG Const Form 2.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 PG Constructions.pdf24 Apr 2026
Withdrawal Update Form 1File: PG Const form 1.pdf24 Mar 2026
Withdrawal Update Form 1File: PG Const form 1.pdf24 Mar 2026
Withdrawal Update Form 2File: PG Const Form 02 Q03.pdf24 Mar 2026
Withdrawal Update Form 2File: PG Const Form 02 Q03.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 PG Constructions.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 PG Constructions.pdf24 Mar 2026
Withdrawal Update Form 1File: PG Const form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: PG Const Form 02 Q03.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 PG Constructions.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 01_ PG A_merged.pdf20 Jan 2026
Withdrawal Update Form 2File: PG Const Form 02 Q03.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 PG Constructions.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 01_ PG A_merged.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_PG Const .pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 PG Constructions.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: P G Construction Form 5 scanned signed.pdf30 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 PG Const Q4 2024-25_11zon.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01_Arch Form _PG Const _11zon.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_ENG Form _PG Const _11zon.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed PG Const Form 3 Q 3 2024-25_11zon.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_merged_11zon.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2_11zon.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 PG Constructions.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P G Const Form 01 ABCD ARC Com.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PG Const Form 02 Wing ABCD.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P G Form 1_11zon.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PG Form 2 B C D wing q1.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PG Constructions.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PG Constructions.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PG Const Q4_ Wing B C Form 1.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PG Const Q4_ Wing D Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PG Const Q4_ Wing D B C Form 2_11zon.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PGConst Form 1_compressed.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PG Construction Annual Report.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PG Const Form 1_Q2 23-24 Arch Certificate_11zon (1).pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PG Const Form 2_Q2 23-24 Eng Certificate_11zon.pdf20 Oct 2023
Proforma of Agreement for saleFile: Draft AFS 270123.pdf27 Jan 2023
Building plan approvalFile: 05 PG Plan Copy 02_11zon.pdf20 Jan 2023
Copy of the legal title reportFile: Title Certificate_RERA_compressed.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 05 PG Plan Copy 02_11zon.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ajay Patkar.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Avinash Patkar.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gaurav Ghorpade.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Haresh Matta.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Jitesh Ghorpade.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Payal Ghorpade.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Riya Patkar.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Jan 2023
Layout approvalFile: 5 PG Plan Copy 01_compressed.pdf9 Jan 2023
Building plan approvalFile: 5 PG Plan Copy 01_compressed.pdf9 Jan 2023
PAN CardFile: 2 Pan card P G Const.pdf9 Jan 2023
Details of encumbrances concerned to FinanceFile: 3 No Encumbrance.pdf9 Jan 2023
Details of encumbrances concerned to LegalFile: 3 No Encumbrance.pdf9 Jan 2023
Copy of Layout Approval (in case of layout)File: 5 PG Plan Copy 01_compressed.pdf9 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 PG Plan Copy 01_compressed.pdf9 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 C C Copy PG Const.pdf9 Jan 2023
Declaration about Commencement CertificateFile: 8 PG construction commencement certificate.pdf9 Jan 2023
Declaration in FORM BFile: 9 Affidavit_Haresh Matta_compressed.pdf9 Jan 2023
CERSAI detailsFile: 16 CERSAI Declaration.pdf9 Jan 2023
Proforma of Allotment letterFile: 24 allotment letter_compressed.pdf9 Jan 2023
Proforma of Agreement for saleFile: 36 p g construction self declaration.pdf9 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 34 P G construction Format A.pdf9 Jan 2023
Deviation Report with respect to Allotment letterFile: 35 Deviation wrt Allotment.pdf9 Jan 2023
Deviation Report with respect to model copy of AgreementFile: 36 p g construction self declaration.pdf9 Jan 2023

How this compares with Thane

39%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Precious Harmony NX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Belawali, Ambernath7,600+ in Thane

2 kmPrecious Harmony NXCompleted 187Lapsed / revoked 70Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 351 registered projects within 2 km.

Builder: P.G. CONSTRUCTIONS

P.G. CONSTRUCTIONS has 1 registration on MahaRERA, including Precious Harmony NX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Precious Harmony NX is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Precious Harmony NX?

The registered promoter entity is P.G. CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Precious Harmony NX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Precious Harmony NX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Precious Harmony NX?

The professionals named in the filing: Architect: Ravindra Ghormode; Engineer: Atul Kudtarkar and Associates Pvt Ltd; Chartered Accountant: Mukesh Gurnani; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Precious Harmony NX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Precious Harmony NX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Precious Harmony NX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.