Home / Browse projects / Pune, Maharashtra / PRAYEJA CITY

Completed No litigation declared Others project

PRAYEJA CITY

By PRAYEJA CITY

RG-MH-24682 · RERA P52100010668 · Last updated on MahaRERA portal: 31 Oct 2023

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 67 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
47 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
9Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

PRAYEJA CITY is a Others project by PRAYEJA CITY in Pune, Maharashtra, registered with MahaRERA as P52100010668 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2024. The completion date has moved by 67 months from the original filing. 9 complaints are on record with the regulator.

At a glance

Project

  • NamePRAYEJA CITY
  • TypeOthers
  • Location
    • Wadgaon Bk
    • Wadgaon Budruk
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010668
  • ReraGenie IDRG-MH-24682

Builder

  • NamePRAYEJA CITY
  • Entity typeOthers
  • Named personsBHANDARI GELADA AOOCIATES LLP, PRAYEJA DEVELOPERS LLP
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseNov 2018Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 30 Nov 2018)
  • Buildings5 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
F1NA100000
F2NA100000
GNA10000
E2NA70000
DNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 31 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

47 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

F191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered2
Open Space65
BuildingClosed/CoveredOpen SpaceTotal
F112627
F212627
E2077
D066

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9768.32
Proposed, not sanctioned9,768 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAVIWAR PETH PUNE 411002

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL J DESHPANDE
EngineerARUN GHOKHALE
PartnerRole in project
PRAYEJA CITY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001452Nov 2018 → Nov 2019

Reason as filed by the promoterThe original due date for completion of the project was 30.11.2018 however the contractors who was responsible for conducting major work contracts has left the project when it was half completed, and we had to look for new contractor with requisite skill set and experience and hence it took time to finalise the new contractor. We have now finalised the new contractor and started the construction work on full swing and completed nearly about 90% of the project. Keeping in view the difficulty of the contractor leaving in mid of the project we request your goodself to kindly allow us extension fo

EXT52100011467Nov 2018 → Dec 2023

Reason as filed by the promoterThe construction work of the above mention project is complete in all aspects within time we have also uploaded Form 4 - Completion certificate given by Architect, due to delay in obtaining E.C Certificate the occupancy certificate is awaiting from local authorities i.e. Pune Municipal Corporation.

Litigation declared3

CaseCourtStatus
CC/15/18/2015DISTRICT CONSUMER DISPUTE REDRESSAL FORUMPENDING
34732/16/2016ADDL JUDGE SMALL CAISES JMFC PUNEPENDING
33/2020/2020National Green TribunalPENDING

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC005000000054044POOJA VIKRAM DALMIAPRAYEJA CITY15/02/2020
CC005000000075018Mr Nilesh Anand PatilBhandari Gelada Associates LLP thorough its partners28/12/2020
CC005000000096109Vipin Sanalal ShahPrayeja City08/10/2021
CC005000000096204Balu Jayantilal DhoshiPrayeja City30/10/2021
CC005000000096213Durgesh Hari AgarwalPrayeja City05/11/2021
CC005000000096219Vihang Navinchandra ShahPrayeja City08/11/2021
CC005000000096222Dilip DoshiPrayeja City09/11/2021
CC005000000096229Ranjan Suresh ShahPrayeja City10/11/2021
CC005000000096241NITIN MAHENDRA SHAHPrayeja City12/11/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: IMG_0001.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: IMG_0004.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: Merged Disclosure for Sold Unsold.pdf2 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold BookedInventory - Building D_compressed.pdf10 May 2022
Disclosure of sold/ booked inventoryFile: Sold BookedInventory - Building E2_compressed.pdf10 May 2022
Disclosure of sold/ booked inventoryFile: Sold BookedInventory - Building F1_compressed.pdf10 May 2022
Disclosure of sold/ booked inventoryFile: Sold BookedInventory - Building F2_compressed.pdf10 May 2022
Disclosure of sold/ booked inventoryFile: Sold BookedInventory - Building G.pdf10 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Prayeja City Phase 1 FY 2019-20 Signed.pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Prayeja City Phase 1 FY 2020-21 Signed.pdf26 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate_compressed-1.pdf19 Feb 2022
Declaration about Commencement CertificateFile: Declaration about commencement_compressed.pdf18 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf17 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prayja City Form 2.pdf17 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Prayeja City Form 2A 30-6-21.pdf17 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Prayeja City Form 2A 30-9-21.pdf17 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Prayeja City Form 2A 31-12-21.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory - D Building.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory - E2 Bulding.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory - F1 Bulding.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory - F2 Bulding.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory - G Bulding.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Building E2 Declaration about sold_unsold-compressed.pdf11 Sep 2021
Disclosure of sold/ booked inventoryFile: Building F1 Declaration about sold_unsold_compressed.pdf11 Sep 2021
Disclosure of sold/ booked inventoryFile: Building F2 Declaration about sold_unsold_compressed.pdf11 Sep 2021
Disclosure of sold/ booked inventoryFile: Building G Declaration about sold_unsold_compressed.pdf11 Sep 2021
Disclosure of sold/ booked inventoryFile: Building D Declaration about sold_unsold_compressed.pdf11 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form -4 Prayeja City.pdf24 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 phase I.pdf12 Feb 2020
Certificates of CA (Form 5)File: Form 5 prayeja city.PDF19 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate 1.pdf12 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf12 May 2018
Layout approvalFile: LAYOUT.pdf31 Jul 2017
Building plan approvalFile: LAYOUT.pdf31 Jul 2017
Copy of the legal title reportFile: Title Search.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf31 Jul 2017
Details of encumbrancesFile: No Encumbrance Certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf31 Jul 2017
Building Plan Approval (IOD)File: LAYOUT.pdf31 Jul 2017
Declaration in FORM BFile: Prayja City 1.pdf31 Jul 2017
Declaration in FORM BFile: Prayja City.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D- Building.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: E2- Building.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F1- Building.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2- BUilding.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: G- Building.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form D.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form E-2.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form F-1.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form F-2.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form G.pdf31 Jul 2017
Proforma of Allotment letterFile: PRAYEJA CITY Allotment letter.pdf31 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRAYEJA PEARLS NO 3 5A 5B 6 PRAYEJA PEARL SINHGAD ROAD WADGAON KHURD BEHIND PRAYEJA CITY PHASE I PUNE MAHARASHTRA96CompletedAug 2016Aug 2016
PRAYEJA CITY PHASE 1S. NO 72 PRAYEJA CITY PHASE 1 SINHGAD ROAD WADGAON BUDRUK NEAR MEDERN BAKERY PUNE MAHARASHTRA 411041350CompletedDec 2012Dec 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 67 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAYEJA CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadgaon Budruk13,700+ in Pune

2 kmPRAYEJA CITYCompleted 43Lapsed / revoked 24Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: PRAYEJA CITY

PRAYEJA CITY has 2 registrations on MahaRERA, including PRAYEJA CITY and PRAYEJA CITY PHASE II. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRAYEJA CITY is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAYEJA CITY?

The registered promoter entity is PRAYEJA CITY, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAYEJA CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRAYEJA CITY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRAYEJA CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAYEJA CITY?

The professionals named in the filing: Architect: SWAPNIL J DESHPANDE; Engineer: ARUN GHOKHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAYEJA CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAYEJA CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAYEJA CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.