Home / Browse projects / Mumbai Suburban, Maharashtra / PRATHMESH DARSHAN

Completed No litigation declared Others project

PRATHMESH DARSHAN

By JAYDEEP MAHALAXMI CONSTRUCTION

RG-MH-24408 · RERA P51800009248 · Last updated on MahaRERA portal: 25 Jul 2023

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 92%
4Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

PRATHMESH DARSHAN is a Others project by JAYDEEP MAHALAXMI CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009248 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. 4 complaints are on record with the regulator.

At a glance

Project

  • NamePRATHMESH DARSHAN
  • TypeOthers
  • Location
    • PANT NAGAR
    • GHATKOPAR
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009248
  • ReraGenie IDRG-MH-24408

Builder

  • NameJAYDEEP MAHALAXMI CONSTRUCTION
  • Entity typePartnership
  • PartnersKARSAN VELJI PATEL, MURJIBHAI DAMJI MINAL, KUNAL KIRTIKUMAR SHETH, RAMESH GUNVANTRAI SALOT, JITENDRA GORDHAN RAJPARA, KANJIBHAI JERAMBHAI DETROJA, MANTHAN HARESH SALOT, MEWALAL DUKHIRAM HALWAI

Key dates

this monthRegisteredAug 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRATHMESH DARSHAN WING A B AND CNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 92%.

PRATHMESH DARSHAN WING A B AND C: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 25 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes5%
Storm Water DrainsYes5%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes5%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,258 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PANT NAGAR RAIL VIEW CHS LTDKurlaMumbai Suburban

Approvals and building plan

Permissible FSI57704.09
Proposed, not sanctioned3,809 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBORIVALI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MOULDER
EngineerZUBER D. JAGIRDAR
Chartered AccountantH. DIWAN & ASSOCIATES
Chartered AccountantDIWAN GOSALIA & ASSOCIATES
PartnerRole in project
JAYDEEP MAHALAXMI CONSTRUCTION-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000302905Ramesh Visanji AnnamM/s Jaydeep Mahalaxmi Construction05/10/2022
CC006000000396832HARSHAL DILIP VAKILJAYDEEP MAHALAXMI CONSTRUCTION (JV)30/07/2023
CC006000000397128Ashwin Purushottam BhanuishaliM/s Jaydeep Mahalaxmi Construction(JV) & Others25/08/2023
CC006000000397790AARTI ASHWIN BHANUSHALIJAYDEEP MAHALAXMI CONSTRUCTION (JV) & OTHERS18/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jun 2023

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form-4.pdf25 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PAGE -1.pdf22 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PAGE-2.pdf22 Jun 2023
Building plan approvalFile: IOD Last.pdf29 Oct 2021
Building plan approvalFile: IOD Last.pdf29 Oct 2021
Building Plan Approval (IOD)File: IOD Last.pdf29 Oct 2021
Building Plan Approval (IOD)File: IOD Last.pdf29 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Last Further CC.pdf29 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 (1).pdf26 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2.pdf26 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER FORM 2A.pdf26 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH_compressed (1).pdf28 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG_compressed (1).pdf28 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: JAYDEEP CC.pdf3 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf1 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf1 Nov 2019
Form 2AFile: Form 2A.pdf1 Nov 2019
Certificates of CA (Form 3)File: CA.pdf30 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf4 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng.pdf31 May 2019
Form 2AFile: Form 2A.pdf31 May 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf17 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Letter.pdf19 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Letter.pdf27 Oct 2018
Certificates of CA (Form 5)File: form 5.pdf24 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certi compressed.pdf22 Aug 2018
Certificates of CA (Form 3)File: ca comp.pdf22 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf13 Aug 2018
Building plan approvalFile: p01.pdf7 Jun 2018
Building plan approvalFile: p02.pdf7 Jun 2018
Building plan approvalFile: p03.pdf7 Jun 2018
Building plan approvalFile: p04.pdf7 Jun 2018
Building plan approvalFile: p05.pdf7 Jun 2018
Building plan approvalFile: p06.pdf7 Jun 2018
Building plan approvalFile: p07.pdf7 Jun 2018
Building Plan Approval (IOD)File: p01.pdf7 Jun 2018
Building Plan Approval (IOD)File: p02.pdf7 Jun 2018
Building Plan Approval (IOD)File: p03.pdf7 Jun 2018
Building Plan Approval (IOD)File: p04.pdf7 Jun 2018
Building Plan Approval (IOD)File: p05.pdf7 Jun 2018
Building Plan Approval (IOD)File: p06.pdf7 Jun 2018
Building Plan Approval (IOD)File: p07.pdf7 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng cert.pdf7 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf5 Jun 2018
Certificates of CA (Form 3)File: CA COMP final.pdf5 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Jun 2018
Certificates of CA (Form 3)File: ca final.pdf3 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (2).pdf31 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-ilovepdf-compressed.pdf31 Jan 2018
Declaration in FORM BFile: declaration jaydeep.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate .pdf30 Jul 2017
Proforma of Allotment letterFile: agree and allotment.pdf30 Jul 2017
Layout approvalFile: jaydeep layout.pdf27 Jul 2017
Building plan approvalFile: jaydeep iod.pdf27 Jul 2017
PAN CardFile: jaydeep pan.pdf27 Jul 2017
Copy of the legal title reportFile: jaydeep title.pdf27 Jul 2017
Details of encumbrancesFile: jaydeep encumb.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: jaydeep layout.pdf27 Jul 2017
Building Plan Approval (IOD)File: jaydeep iod.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: jaydeep cc.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jaydeep archi.pdf27 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRATHMESH DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR6,700+ in Mumbai Suburban

2 kmPRATHMESH DARSHANCompleted 127Lapsed / revoked 91Other 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 343 registered projects within 2 km.

Builder: JAYDEEP MAHALAXMI CONSTRUCTION

JAYDEEP MAHALAXMI CONSTRUCTION has 1 registration on MahaRERA, including PRATHMESH DARSHAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PRATHMESH DARSHAN is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRATHMESH DARSHAN?

The registered promoter entity is JAYDEEP MAHALAXMI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRATHMESH DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRATHMESH DARSHAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRATHMESH DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRATHMESH DARSHAN?

The professionals named in the filing: Architect: SPACE MOULDER; Engineer: ZUBER D. JAGIRDAR; Chartered Accountant: H. DIWAN & ASSOCIATES; Chartered Accountant: DIWAN GOSALIA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRATHMESH DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRATHMESH DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRATHMESH DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.