Home / Browse projects / Mumbai Suburban, Maharashtra / East Syde
East Syde
RG-MH-30629 · RERA P51800031002 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
East Syde is a Residential / Group Housing project by VL GAJAMUKH DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031002 on 29 Sep 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 160 of the 237 units on this registration are recorded sold or booked, and 29 of 33 construction stages are filed complete.
At a glance
Project
- NameEast Syde
- TypeResidential / Group Housing
- Location
- VILLAGE GHATKOPAR
- PANT NAGAR
- GHATKOPAR EAST
- BUILDING NO 77 & 79
- GHATKOPAR
- Kurla
- Mumbai Suburban
- 400075
- Pincode400075
- RERA no.P51800031002
- ReraGenie IDRG-MH-30629
Builder
- NameVL GAJAMUKH DEVELOPERS LLP
- Entity typePartnership
- PartnersHARSHADA RAMDAS SANGLE, ADITYA RAMDAS SANGLE, RAMDAS MARUTI SANGLE, ANITA RAMDAS SANGLE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Sep 2021
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings3 building records
- Documents filed121 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EAST SYDE WING A | NA | 19 | 19 | 80 | 0 | 80 |
| East Syde Wing B | NA | 18 | 18 | 94 | 0 | 94 |
| East Syde Wing C | NA | 18 | 18 | 63 | 0 | 63 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
EAST SYDE WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
East Syde Wing B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
East Syde Wing C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| EAST SYDE WING A | 12 | 12 |
| East Syde Wing B | 45 | 45 |
| East Syde Wing C | 28 | 28 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PANT NAGAR GAJMUKH CHSL | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EAST SYDE WING A | NA | Rs 23.73 cr | Rs 14.92 cr |
| East Syde Wing B | NA | Rs 23.73 cr | Rs 14.92 cr |
| East Syde Wing C | NA | Rs 23.73 cr | Rs 14.92 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kishor Lotlikar |
| Engineer | AJAY MAHALE |
| Chartered Accountant | NARENDRA KADAV |
| Chartered Accountant | Kapure and Kapure Chartered Accoutant |
| Chartered Accountant | V C Shah and Co. |
| Partner | Role in project |
|---|---|
| VL GAJAMUKH DEVELOPERS LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 13020/2021 | High Court | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: 13082024.pdf | 7 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 13-08-2024.pdf | 7 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 13082024_compressed.pdf | 7 Jul 2026 |
| Form 2A (FY 2024-2025)File: MahaRera New Format of Form 2A FY 2023-24.pdf | 7 Jul 2026 |
| Form 5 (FY 2024-2025)File: Signed Form 5 March 24.pdf | 7 Jul 2026 |
| Form 1File: 13082024.pdf | 22 Apr 2026 |
| Form 2File: FORM 2 13-08-2024.pdf | 22 Apr 2026 |
| Form 3File: Form 3 13082024_compressed.pdf | 22 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - August 2024.pdf | 22 Apr 2026 |
| Form 1File: 13082024.pdf | 22 Apr 2026 |
| Form 2File: FORM 2 13-08-2024.pdf | 22 Apr 2026 |
| Form 3File: Form 3 13082024_compressed.pdf | 22 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - August 2024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: 13082024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: 13082024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: 13082024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: 13082024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 13-08-2024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 13-08-2024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 13-08-2024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 13-08-2024.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 13082024_compressed.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 13082024_compressed.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 13082024_compressed.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 13082024_compressed.pdf | 22 Apr 2026 |
| Form 2A (FY 2021-2022)File: 1. MahaRera New Format of Form 2A F.Y. 2021-22..pdf | 7 Feb 2026 |
| Form 2A (FY 2022-2023)File: 2. MahaRera New Format of Form 2A F.Y. 2022-23..pdf | 7 Feb 2026 |
| Form 2A (FY 2023-2024)File: 3. MahaRera New Format of Form 2A F.Y. 2023-24..pdf | 7 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form-5_VL gajamukh FY-2021-22.pdf | 7 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 March 23.pdf | 7 Feb 2026 |
| Form 5 (FY 2023-2024)File: Signed Form 5 March 24.pdf | 7 Feb 2026 |
| Form 1File: DEc 23.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 31-03-2023.pdf | 14 Jan 2026 |
| Form 3File: Form 3 Dec 23_compressed.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Dece 2023.pdf | 14 Jan 2026 |
| Form 1File: March 24.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 31-03-2024.pdf | 14 Jan 2026 |
| Form 3File: Form 3 March 24_compressed.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - March 2024.pdf | 14 Jan 2026 |
| Form 1File: June 24.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 30-06-2024.pdf | 14 Jan 2026 |
| Form 3File: Form 3 June 24_compressed.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - June 2024.pdf | 14 Jan 2026 |
| Form 1File: 13082024.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 13-08-2024.pdf | 14 Jan 2026 |
| Form 3File: Form 3 13082024_compressed.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - August 2024.pdf | 14 Jan 2026 |
| Form 1File: March 22.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 31-03-2022.pdf | 13 Jan 2026 |
| Form 3File: Form 3 - East syde Mar 2022_Compress..pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - March 2022.pdf | 13 Jan 2026 |
| Form 1File: June 22.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 30-06-2022.pdf | 13 Jan 2026 |
| Form 3File: Form 3 Jun 22_compressed..pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - June 2022.pdf | 13 Jan 2026 |
| Form 1File: Sep 22.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 30-09-2022.pdf | 13 Jan 2026 |
| Form 3File: Form 3 Sep 22_compressed..pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Sep 2022.pdf | 13 Jan 2026 |
| Form 1File: Dec 22.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 31-12-2022.pdf | 13 Jan 2026 |
| Form 3File: Form 3 Dec 22_compressed..pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - December 2022.pdf | 13 Jan 2026 |
| Form 1File: March 23.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 31-03-2023.pdf | 13 Jan 2026 |
| Form 3File: Form 3 - March 2023_compressed..pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - March 2023.pdf | 13 Jan 2026 |
| Form 1File: June 23.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 30-06-2023.pdf | 13 Jan 2026 |
| Form 3File: Form 3 June 23 VL Gajmukh_compressed..pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - June 2023.pdf | 13 Jan 2026 |
| Form 1File: Sep 23.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 30-09-2023.pdf | 13 Jan 2026 |
| Form 3File: Form 3 Sep 23_compressed.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Sept 2023.pdf | 13 Jan 2026 |
| Details of encumbrancesFile: Encumbrance certificate.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 For GAJMUKH.pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 22_compressed (1).pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 22_compressed.pdf | 22 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep East Syde on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BUILDING NO 77 & 79, GHATKOPAR6,700+ in Mumbai Suburban
THE VIEWS
AGNEL DEVELOPERS
THE VIEWS II
AGNEL DEVELOPERS
Drushti Emerald
SAMARTH DRUSHTI DEVELOPERS
ROYAL ALTEZZA
SHRI GANESH DEVELOPERS
Damji Shamji Corporate Square - Wing C
Coronate Constructions
Samarpan
HS Construction
See every Mumbai Suburban project, with the district possession charts
Builder: VL GAJAMUKH DEVELOPERS LLP
VL GAJAMUKH DEVELOPERS LLP has 1 registration on MahaRERA, including East Syde. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that East Syde shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if East Syde is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of East Syde?
The registered promoter entity is VL GAJAMUKH DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in East Syde?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for East Syde?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at East Syde?
The professionals named in the filing: Architect: Kishor Lotlikar; Engineer: AJAY MAHALE; Chartered Accountant: NARENDRA KADAV; Chartered Accountant: Kapure and Kapure Chartered Accoutant; Chartered Accountant: V C Shah and Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in East Syde?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback