ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / PRATHAMESH CHSL

Completed No litigation declared Others project

PRATHAMESH CHSL

By NIRMAL DEVELOPERS

RG-MH-33506 · RERA P51700049627 · Last updated on MahaRERA portal: 1 May 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

PRATHAMESH CHSL is a Others project by NIRMAL DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700049627 on 22 Feb 2023. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 6 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePRATHAMESH CHSL
  • TypeOthers
  • Location
    • SURVEY NO 26 HISSA NO 2A PLOT NO 3 MAUJE SHIRGAON
    • BADLAPUR EAST
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700049627
  • ReraGenie IDRG-MH-33506

Builder

  • NameNIRMAL DEVELOPERS
  • Entity typePartnership
  • PartnersNIRMALA MANSUKHLAL SHAPARIYA, TEJAL MEHUL CHOTHANI
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023First promiseDec 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Feb 2023
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRATHMESH CHSLNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

PRATHMESH CHSL: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Open Space35

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area502 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
ALBELARAM JANSHER BALMIKIBadlapur (M Cl)Thane
PRADEEP KUMAR LALDHARI MEHTABadlapur (M Cl)Thane
MILIND NAWAL WAGHBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI1448.77
Proposed, not sanctioned1,449 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9-13,SAWANT PLAZA ,DATTA CHOWK,BELAVALI ,BADLAPUR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGNERS
EngineerKB CONSULTANTS
Chartered AccountantVIJAY KOTAK & CO
PartnerRole in project
NIRMAL DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700025880Dec 2024 → Jun 2025

Reason as filed by the promoterWe have already applied for Project Completion Certificate to Kulgaon Badlapur Municipal Corporation on 16/12/2024, but till date we have not received completion certificate and our project completion date as per RERA is 31/12/2024.Therefore we hereby applying for Extension of date for Project completion U/s 7(3).

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604346Ospal Masicharan ChavanNIRMAL DEVELOPERS11/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Apr 2025

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf1 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE CERTIFICATE.pdf1 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 REVISED.pdf4 Apr 2025
Declaration in FORM BFile: FORM B EXTENTION.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 _RERA_31_03_2024.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner Apr 20, 2024 11-53 AM.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: DocScanner Apr 20, 2024 3-39 PM.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf24 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance- Nirmal Developers.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure SOLD UNSOLD Q4 22-23.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure SOLD UNSOLD Q1 23-24.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure SOLD UNSOLD Q2 23-24.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure SOLD UNSOLD Q3 23-24.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT JUN-23 ND.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SEPT23 ND.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER JUN-23 ND.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER SEPT23 ND.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 ND JUN23_11zon.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 ND SEPT23_11zon.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA AUDIT FORM 5 NIRMAL.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Nirmal Developers_11zon.pdf17 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate- Nirmal Developers_11zon.pdf1 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate- Nirmal Developers_11zon.pdf1 May 2023
Building plan approvalFile: PLAN.pdf14 Feb 2023
Layout approvalFile: PLAN.pdf14 Feb 2023
Copy of the legal title reportFile: Legal title report _11zon.pdf14 Feb 2023
Copy of Layout Approval (in case of layout)File: PLAN.pdf14 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf14 Feb 2023
PAN CardFile: COMPANY PAN.pdf2 Feb 2023
Details of encumbrances concerned to FinanceFile: Non encumbrances certificate (finance).pdf2 Feb 2023
Details of encumbrances concerned to FinanceFile: Non encumbrances certificate (legal).pdf2 Feb 2023
Details of encumbrances concerned to LegalFile: Non encumbrances certificate (finance).pdf2 Feb 2023
Details of encumbrances concerned to LegalFile: Non encumbrances certificate (legal).pdf2 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate_11zon.pdf2 Feb 2023
Declaration about Commencement CertificateFile: Declaration about commencement certificate _11zon.pdf2 Feb 2023
Declaration in FORM BFile: FORM B BUILDER.pdf2 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259184693_For_Asset_Based_Search_01_02_2023_14_13_32_223.pdf2 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE2_11zon with sign.pdf2 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest mansukhlal sapariya.pdf2 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest nirmala sapariya.pdf2 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest tejal chothani.pdf2 Feb 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE - NIRMAL.pdf2 Feb 2023
Proforma of Allotment letterFile: Allotment Letter_11zon.pdf2 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account .pdf2 Feb 2023
Deviation Report with respect to Allotment letterFile: Declaration for no deviation .pdf2 Feb 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT -AFS_11zon.pdf2 Feb 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRATHAMESH CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR EAST7,600+ in Thane

Builder: NIRMAL DEVELOPERS

Nirmal Developers has 4 registrations on MahaRERA, including OLYMPIA C D and NIRMAL NIWARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PRATHAMESH CHSL is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRATHAMESH CHSL?

The registered promoter entity is NIRMAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRATHAMESH CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRATHAMESH CHSL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRATHAMESH CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRATHAMESH CHSL?

The professionals named in the filing: Architect: SPACE DESIGNERS; Engineer: KB CONSULTANTS; Chartered Accountant: VIJAY KOTAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRATHAMESH CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRATHAMESH CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRATHAMESH CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.