ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / PRAMUKH PARADISE

Registered No litigation declared Residential / Group Housing project

PRAMUKH PARADISE

By AASHAPURA ASSOCIATE

RG-MH-17709 · RERA P51700055845 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
8 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 80%
212 of 246Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

PRAMUKH PARADISE is a Residential / Group Housing project by AASHAPURA ASSOCIATE in Thane, Maharashtra, registered with MahaRERA as P51700055845 on 23 Apr 2024. Possession is promised by 31 Dec 2029. 34 of the 246 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.

At a glance

Project

  • NamePRAMUKH PARADISE
  • TypeResidential / Group Housing
  • Location
    • RAILWAY STATION PARALLEL ROAD
    • NEAR VANGANI RAILWAY STATION EAST FOOTOVER BRIDGE
    • Vangani (CT)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055845
  • ReraGenie IDRG-MH-17709

Builder

  • NameAASHAPURA ASSOCIATE
  • Entity typePartnership
  • PartnersMAGANLAL BHANJI PATEL, HITEN MAGANLAL PATEL
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed83 files

Current status

14%34 of 246 units booked

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 2 WING BNA8851051
BUILDING NO 2 WING CNA8852052
BUILDING NO 3 WING DNA8856056
BUILDING NO 1 WING ANA77632487

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 80%.

BUILDING NO 2 WING B56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.13%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 WING C34%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1 WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered4
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 2 WING B112
BUILDING NO 2 WING C112
BUILDING NO 3 WING D112
BUILDING NO 1 WING A112

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,990 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Dec 2025
LandownerVillageDistrict
S R A CONSTRUCTIONNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityADDITIONAL TOWN PLANNING, THANE, COLLECTOR OF THANE
Permissible FSI9946.0
Proposed, not sanctioned8,952 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHATMA PHULE ROAD, DOMBIVLI WEST, THANE, MAHARASHTRA 421202

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN POTDAR
EngineerS V PATEL & ASSOCIATES
Chartered AccountantK V LATHIA & COMPANY
PartnerRole in project
AASHAPURA ASSOCIATE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 ARCHITECT Q4 31-03-2026.pdf18 Apr 2026
Form 2File: FORM 2 ENGINEER Q4 31-03-2026.pdf18 Apr 2026
Form 3File: FORM 3 CA Q4 31-03-2026.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q4 31-03-2026.pdf18 Apr 2026
Form 1File: FORM 1 ARCHITECT Q3 31-12-2025.pdf14 Feb 2026
Form 2File: FORM 2 ENGINEER Q3 31-12-2025.pdf14 Feb 2026
Form 3File: FORM 3 CA Q3 31-12-2025.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q3 31-12-2025.pdf14 Feb 2026
Form 1File: FORM 1 ARCHITECT Q1 30-06-2024.pdf28 Dec 2025
Form 2File: FORM 2 ENGINEER Q1 30-06-2024.pdf28 Dec 2025
Form 3File: FORM 3 CA Q1 30-06-2024.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q1 30-06-2024.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT Q2 30-09-2024.pdf28 Dec 2025
Form 2File: FORM 2 ENGINEER Q2 30-09-2024.pdf28 Dec 2025
Form 3File: FORM 3 CA Q2 30-09-2024.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q2 30-09-2024.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT Q3 31-12-2024.pdf28 Dec 2025
Form 2File: FORM 2 ENGINEER Q3 31-12-2024.pdf28 Dec 2025
Form 3File: FORM 3 CA Q3 31-12-2024.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q3 31-12-2024.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT Q4 31-03-2025.pdf28 Dec 2025
Form 2File: FORM 2 ENGINEER Q4 31-03-2025.pdf28 Dec 2025
Form 3File: FORM 3 CA Q4 31-03-2025.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q4 31-03-2025.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT Q1 30-06-2025.pdf28 Dec 2025
Form 2File: FORM 2 ENGINEER Q1 30-06-2025.pdf28 Dec 2025
Form 3File: FORM 3 CA Q1 30-06-2025.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q1 30-06-2025.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT Q2 30-09-2025.pdf28 Dec 2025
Form 2File: FORM 2 ENGINEER Q2 30-09-2025.pdf28 Dec 2025
Form 3File: FORM 3 CA Q2 30-09-2025.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY Q2 30-09-2025.pdf28 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM NO 1 11-04-2025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 2025 RERA CERTIFICATE 17-04-2025.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Q4 31-03-2025.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASHAPURA FORM 1 31-12-2024 com.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA 31_12_2024 COM.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1688 - RERA CERTIFICATE 31-12-2024.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT From 1 Certificate work 19-10-2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE DATED 31-10-24.pdf9 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 30-9-24 (Engineer Quality Assurance).pdf9 Nov 2024
Copy of the legal title reportFile: COPY OF TITLE REPORT.pdf17 Oct 2024
Proforma of Agreement for saleFile: 12) RERA DRAFT AGREEMENT FOR SALE.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AASHAPURA ASSOCIATE_compressed.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA CERTIFICATE.pdf8 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 30-6-24 (Engineer Quality Assurance).pdf8 Aug 2024
Layout approvalFile: ADTP PLAN 1 ff-compressed_compressed.pdf20 Apr 2024
Copy of Layout Approval (in case of layout)File: ADTP PLAN 1 ff-compressed_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AASHAPURA_cc.pdf15 Apr 2024
Declaration about Commencement CertificateFile: 8) DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf9 Mar 2024
Declaration in FORM BFile: 9) DECLARATION IN FORM B PROMOTER 11-3-24.pdf9 Mar 2024
Other - TechnicalFile: 43) OTHER TECHNICAL ANNEXURE A.pdf9 Mar 2024
Layout approvalFile: 5) COPY OF LAYOUT 1 ADTP PLAN 1 Com.pdf27 Feb 2024
Layout approvalFile: 5) COPY OF LAYOUT 2 ADTP PLAN 2 com.pdf27 Feb 2024
Layout approvalFile: 5) COPY OF LAYOUT 3 ADTP PLAN 3 Com.pdf27 Feb 2024
Building plan approvalFile: 6) BUILDING PLAN APPROVAL 1 ADTP PLAN 1 Com.pdf27 Feb 2024
Building plan approvalFile: 6) BUILDING PLAN APPROVAL 2 ADTP PLAN 2 com.pdf27 Feb 2024
Building plan approvalFile: 6) BUILDING PLAN APPROVAL 3 ADTP PLAN 3 Com.pdf27 Feb 2024
PAN CardFile: 1) PAN CARD.pdf27 Feb 2024
Copy of the legal title reportFile: 2) TITLE REPORT.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: 4) DETAILS OF ENCUMBRANCES CONCERNED TO LEGAL.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: 3) DETAILS OF ENCUMBRANCES CONCERNED TO FINANCE.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: 4) DETAILS OF ENCUMBRANCES CONCERNED TO LEGAL.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: 3) DETAILS OF ENCUMBRANCES CONCERNED TO FINANCE.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 5) COPY OF LAYOUT 1 ADTP PLAN 1 Com.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 5) COPY OF LAYOUT 2 ADTP PLAN 2 com.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 5) COPY OF LAYOUT 3 ADTP PLAN 3 Com.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 6) BUILDING PLAN APPROVAL 1 ADTP PLAN 1 Com.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 6) BUILDING PLAN APPROVAL 2 ADTP PLAN 2 com.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 6) BUILDING PLAN APPROVAL 3 ADTP PLAN 3 Com.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 7) Commencement certficate NA order 06-02-2.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10) ARCHITECT'S FORM 1 PERCENTAGE OF WORK COMPLETED.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11) ENGINEERS FORM 2 RERA CERTIFICATE.pdf27 Feb 2024
CERSAI detailsFile: 17) 1 CERSAI Search Report.pdf27 Feb 2024
CERSAI detailsFile: 17) 2 CERSAI DETAILS.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19) 1 DISCLOSER OF INTEREST IN OTHER REAL ESTATE ORG MBP.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19) 2 DISCLOSER OF INTEREST IN OTHER REAL ESTATE ORG HMP.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19) 3 DISCLOSER OF INTEREST IN OTHER REAL ESTATE ORG BMP.pdf27 Feb 2024
Proforma of Agreement for saleFile: 25) PROFORMA OF AGREEMENT FOR SALE.pdf27 Feb 2024
Proforma of Allotment letterFile: 26) PROFORMA OF ALLOTTMENT LETTER.pdf27 Feb 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HARIOM NXTGANSHYAM GUPTE ROAD DOMBIVLI WEST23CompletedMay 2024Apr 2023
SHUBH AANGANHENDRE PADA BADLAPUR WEST135CompletedDec 2021Dec 2019
PRAMUKH DARSHANDHAMOTE NERAL62CompletedMay 2019Apr 2019

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAMUKH PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR VANGANI RAILWAY STATION EAST FOOTOVER BRIDGE7,600+ in Thane

2 kmPRAMUKH PARADISECompleted 3Lapsed / revoked 7Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: AASHAPURA ASSOCIATE

AASHAPURA ASSOCIATE has 1 registration on MahaRERA, including PRAMUKH PARADISE. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PRAMUKH PARADISE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAMUKH PARADISE?

The registered promoter entity is AASHAPURA ASSOCIATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAMUKH PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRAMUKH PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAMUKH PARADISE?

The professionals named in the filing: Architect: SACHIN POTDAR; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: K V LATHIA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAMUKH PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAMUKH PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAMUKH PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.