ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Prakriti Park-Gulmohar (B Wing)

Registered No litigation declared Others project

Prakriti Park-Gulmohar (B Wing)

By Khwaish Enterprises

RG-MH-25596 · RERA P52000006751 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 60 months
  • 1 extension taken
  • Rs 7.20 crore secured on the land, in favour of Karad Bank

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 60 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
83 of 125Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Prakriti Park-Gulmohar (B Wing) is a Others project by Khwaish Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000006751 on 16 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 60 months from the original filing. 42 of the 125 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NamePrakriti Park-Gulmohar (B Wing)
  • TypeOthers
  • Location
    • Raigarh
    • Panvel
    • Pisarve
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000006751
  • ReraGenie IDRG-MH-25596

Builder

  • NameKhwaish Enterprises
  • Entity typePartnership
  • PartnersJINESH BIPIN PATEL, ASHA BIPIN PATEL
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed105 files

Current status

34%42 of 125 units booked
4.6%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Prakriti Park Gulmohar B wingNA141310619125

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Prakriti Park Gulmohar B wing: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered68
Open Space29

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,470 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKarad Bank
Secured amountRs 7.20 crore
CERSAI search filedYes
Declared on10 Dec 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI6735.83
Proposed, not sanctioned6,736 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVyapar Bhavan H001 APMC Market Market 2 Phase 2 Dana Bazaar Navi Mumbai 400703
Estimated costRs 20.04 cr
Cost incurredRs 92.40 lakh
Work done4.61%
BuildingWingEstimatedIncurred
Prakriti Park Gulmohar B wingNARs 18.33 crRs 92.40 lakh
-NARs 1.71 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAn Arch Architect & Planner.
ArchitectDestination Architecture Interior Designs
EngineerAdharshila consultants.
EngineerSamarth Agarwal
EngineerSandesh Kothavade
Chartered AccountantJagdish Bhagat & Co
Chartered AccountantPratik Kothawale
PartnerRole in project
Khwaish Enterprises-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024350Dec 2023 → Dec 2028

Reason as filed by the promoterThe project has been taken over by the new promoter. Hence Extension would be required for completion of Project. Change in Promoter has been already approved by maharera. Please grant the Extension and there are zero allottees in the project hence consent should not be insisted of 51%.

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000194349Bharti Damji Hurbada & Deepti Darshan BhanushaliMarvel Lifespaces28/10/2020
CC006000000193887Amit Kumar MauryaMarvel Lifespaces01/09/2020
CC006000000199032Shruti VohraMarvel Lifespaces15/11/2021
CC006000000199052Shruti VohraMarvel Lifespaces04/12/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 B wing.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 B Wing.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 B Wing.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 B Wing.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 B Wing.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 03 b wing oct dec 25 - signed.pdf30 Jan 2026
Form 1File: B Wing Form 1.pdf30 Oct 2025
Form 2File: B Wing Form 2.pdf30 Oct 2025
Form 3File: B wing Form 3.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: B Wing Gulmohar Disclosure of sold & Unsold.pdf30 Oct 2025
Form 2A (FY 2024-2025)File: Engineer's Certificate-Form 2-B wing-23-09-2025.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Prakriti Park B wing form 05 fy 24-25 - signed.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: B Wing Gulmohar Disclosure of sold & Unsold as on 30-06-2025.pdf18 Jul 2025
Form 1File: Form 1 B Wing.pdf18 Jul 2025
Form 2File: Form 2 B Wing.pdf18 Jul 2025
Form 3File: Form 3 B Wing.pdf18 Jul 2025
Form 1File: B wing Archtitect Certificate Form 1.pdf27 Jun 2025
Form 2File: Engineer's Certificate-B wing Form 2.pdf27 Jun 2025
Form 3File: B Wing CA Certificate Form 3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold and Unsold.pdf27 Jun 2025
Form 1File: B Wing Architect Certificate Form 1.pdf27 Jun 2025
Form 2File: Engineer's Certificate B wing Form 2.pdf27 Jun 2025
Form 3File: B Wing CA Certificate Form 3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold & Unsold B wing.pdf27 Jun 2025
Form 1File: Architects Certificate B wing Form 1.pdf27 Jun 2025
Form 2File: Engineer Certificate B wing Form 2.pdf27 Jun 2025
Form 3File: CA Certificate form 3 B-Wing.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: B Wing Gulmohar Disclosure of sold andUnsold.pdf27 Jun 2025
Form 1File: Architect's Certificate-B wing Form 1.pdf27 Jun 2025
Form 2File: Engineer's Certificate B wing Form 2.pdf27 Jun 2025
Form 3File: CA B Wing Form 3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold & Unsold B-Wing.pdf27 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate-B wing 31-03-2025.pdf8 May 2025
Certificates of CA (Form 3)File: CA B Wing Signed_11zon.pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-B wing-31-03-2025.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Discolsure of Sold B wing Q2.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Discolsure of Sold B Wing Q3.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-B wing-30-09-24 with Sign.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-B wing-31-12-24 with Sign.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate-B wing 30-09-2024 with Sign_0001.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate-B wing 31-12-2024 with sign.pdf29 Jan 2025
Certificates of CA (Form 3)File: Khwaish Ent B Wing Form 03 Jul - Sep 24 signed.pdf29 Jan 2025
Certificates of CA (Form 3)File: CA Certificate B Wing Form 03 Oct Dec 2024.pdf29 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-B wing-30-09-24 with Sign_0001.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Declaration Registration no-P52000006751-Exhibit A.pdf9 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Declaration Registration no-P52000006751-Exhibit A.pdf9 Aug 2024
CERSAI detailsFile: AB - OTHERS.pdf24 Jul 2024
Declaration in FORM BFile: Form B-Affidavit cum Declaration.pdf23 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRAKRITI PARK WING B Form 1.pdf23 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prakriti Park B Wing EC 19-07-24_0001.pdf23 Jul 2024
Certificates of CA (Form 3)File: B wing prakriti park form 03_compressed.pdf23 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: ASHOKA Declaration about Separate Bank Account for real estate projects.pdf23 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: GULMOHAR Declaration about Separate Bank Account for real estate projects.pdf23 Jul 2024
Certificates of CA (Form 3)File: Wing -B 3 Registration Form_0001_compressed.pdf16 Jun 2024
Layout approvalFile: Layput plan 2_11zon.pdf18 May 2024
Layout approvalFile: Layout plan 2_11zon.pdf18 May 2024
Building plan approvalFile: Wing B Building plan_11zon.pdf18 May 2024
Building plan approvalFile: Wing B building plan 1_11zon.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: Layput plan 2_11zon.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: Layout plan 2_11zon.pdf18 May 2024
Building Plan Approval (IOD)File: Wing B Building plan_11zon.pdf18 May 2024
Building Plan Approval (IOD)File: Wing B building plan 1_11zon.pdf18 May 2024
Certificates of CA (Form 3)File: Khwaish Enterprises form 3_compressed.pdf17 May 2024
PAN CardFile: Khwaish Enterprises-Pan Card.pdf3 May 2024
Details of encumbrancesFile: Declaration of No Financial Encumbrance.pdf3 May 2024
Details of encumbrancesFile: Declaration of No Legal Encumbrances.pdf3 May 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Legal Encumbrances.pdf3 May 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Financial Encumbrance.pdf3 May 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Legal Encumbrances.pdf3 May 2024
Details of encumbrances concerned to LegalFile: Declaration of No Legal Encumbrances.pdf3 May 2024
Details of encumbrances concerned to LegalFile: Declaration of No Financial Encumbrance.pdf3 May 2024
Details of encumbrances concerned to LegalFile: Declaration of No Legal Encumbrances.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Prakriti Park Pisarve- Khwaish CC.pdf3 May 2024
Declaration about Commencement CertificateFile: Declaration CC.pdf3 May 2024
Declaration in FORM BFile: Form B.pdf3 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_0001.pdf3 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-B wing.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Asha Patel.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Jinesh Patel.pdf3 May 2024
Proforma of Agreement for saleFile: Model Agreement_11zon.pdf3 May 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Sai AanganP52000004701panvel, RaigarhAug 2017CompletedJun 2023Registered original: Mar 2020Mar 2023
Asha HarmonyP51700022377Ghansoli, ThaneSep 2019CompletedDec 2022Jun 2022

How this compares with Raigarh

34%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 60 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prakriti Park-Gulmohar (B Wing) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmPrakriti Park-Gulmohar (Completed 15Lapsed / revoked 23Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: Khwaish Enterprises

Khwaish Enterprises has 3 registrations on MahaRERA, including Prakriti Park-Chandan (C Wing) and Prakriti Park-Gulmohar (B Wing). Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Prakriti Park-Gulmohar (B Wing) is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prakriti Park-Gulmohar (B Wing)?

The registered promoter entity is Khwaish Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prakriti Park-Gulmohar (B Wing)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prakriti Park-Gulmohar (B Wing)?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Prakriti Park-Gulmohar (B Wing)?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prakriti Park-Gulmohar (B Wing)?

The professionals named in the filing: Architect: An Arch Architect & Planner.; Architect: Destination Architecture Interior Designs; Engineer: Adharshila consultants.; Engineer: Samarth Agarwal; Engineer: Sandesh Kothavade; Chartered Accountant: Jagdish Bhagat & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prakriti Park-Gulmohar (B Wing)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prakriti Park-Gulmohar (B Wing). Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prakriti Park-Gulmohar (B Wing) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.