ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Sai Aangan

Completed No litigation declared Residential / Group Housing project

Sai Aangan

By VIR Enterprises

RG-MH-85995 · RERA P52000004701 · Last updated on MahaRERA portal: 30 Nov 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 39 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Sai Aangan is a Residential / Group Housing project by VIR Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000004701 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 39 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSai Aangan
  • TypeResidential / Group Housing
  • Location
    • Dhansar
    • panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000004701
  • ReraGenie IDRG-MH-85995

Builder

  • NameVIR Enterprises
  • Entity typePartnership
  • PartnersJinesh Bipin Patel, Bipin Rasiklal Patel
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017First promiseMar 2020Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Mar 2020)
  • Buildings2 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RIDDHINA80000
SIDDHINA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

RIDDHI91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SIDDHI91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered63
BuildingClosed/CoveredTotal
RIDDHI6161
SIDDHI22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,030 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3003.16
Proposed, not sanctioned2,194 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishal Shopping Centre Sir MV Road Opp GYMKHANA Andheri East Mumbai 400069

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANARCH ARCHITECT AND PLANNER
EngineerSAMARTH AGARWAL
PartnerRole in project
VIR Enterprises-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000011609Mar 2020 → Mar 2023

Reason as filed by the promoterWe Vir enterprises would want an extension for our project Sai Aangan Situated at Survey Number 273, Dhansar , Navi Mumbai, as the CC issued to us by Panvel Municipal Corporation was on 7th April 2021 which was delayed by almost 15 months, kindly extend the date to 30/3/2023. Thanking You.

EXT52000005986Mar 2020 → Mar 2021

Reason as filed by the promoterProject was delay because of change in promoter from " Marvel Life Space LLP" to "Vir Enterprises" and we expect to received Occupancy Certificate within the period of one year. We request time limit of project to be extended up to March 2021.

EXT52000015104Mar 2020 → Jun 2023

Reason as filed by the promoterUnfortunately, we have completed only 95% work of construction. So, we required time to complete remaining work of construction and also required time for receiving occupancy certificate. Therefore, we are now requesting an extension of the completion date. We understand the importance of this project, and we are doing our utmost to ensure that it is completed as soon as possible. We make request for Project delivery date to be extended till June 30, 2023.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000058051Rupa Hitesh SaytaMarvel Lifespaces LLP11/02/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Oct 2023

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf30 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineer's Certificate.pdf24 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 17102023 Upload.pdf23 Nov 2023
Certificates of CA (Form 3)File: Form 3 Sai Aangan signed.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 2020-21.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Sales MIS 10102023.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA-Certificate-Annual Report.pdf12 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cert_FO_294222_178d1KkHSign.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory.pdf21 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory 15032023.pdf20 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RERA CERTIFICATE 1st Jan 2023.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA certificate 21-22.pdf18 Oct 2022
Copy of the legal title reportFile: Encumbrance Certificate.pdf7 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Concerned to Legal.pdf7 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Architects's Certificate).pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 (Engineer's Certificate).pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory (Building Wise).pdf7 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate Projects ( format-A).pdf7 Oct 2022
Building plan approvalFile: Building Plan 1.pdf1 Apr 2022
Building plan approvalFile: Building Plan 2.pdf1 Apr 2022
Building plan approvalFile: Building Plan 3.pdf1 Apr 2022
Building plan approvalFile: Building Plan 4.pdf1 Apr 2022
Building Plan Approval (IOD)File: Building Plan 1.pdf1 Apr 2022
Building Plan Approval (IOD)File: Building Plan 2.pdf1 Apr 2022
Building Plan Approval (IOD)File: Building Plan 3.pdf1 Apr 2022
Building Plan Approval (IOD)File: Building Plan 4.pdf1 Apr 2022
Declaration about Commencement CertificateFile: Declaration About CC.pdf1 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventory.pdf1 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019 2020.pdf1 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020 2021.pdf1 Apr 2022
Layout approvalFile: SHEET NO 01.pdf23 Mar 2022
Layout approvalFile: Amended Plan Sheet No 02.pdf23 Mar 2022
Layout approvalFile: SHEET NO 03.pdf23 Mar 2022
Layout approvalFile: Amended Plan Sheet No 04.pdf23 Mar 2022
PAN CardFile: 3 Vir Enterprises pancard.PDF23 Mar 2022
Copy of Layout Approval (in case of layout)File: SHEET NO 01.pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: Amended Plan Sheet No 02.pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: SHEET NO 03.pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: Amended Plan Sheet No 04.pdf23 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf23 Mar 2022
Declaration about Commencement CertificateFile: CC declaration for rera.pdf23 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch letter for rera.pdf23 Mar 2022
Proforma of Allotment letterFile: sai angan agreement for sale.pdf6 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: vir enterprises.pdf3 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf30 Mar 2018
Layout approvalFile: 1 (1).pdf31 Jul 2017
Layout approvalFile: 2.pdf31 Jul 2017
Layout approvalFile: 3.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 (1).pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 3.pdf31 Jul 2017
Declaration in FORM BFile: FORM -B.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dhasnar Engineer certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE 07312017 new.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement For Sale 1 new.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement For Sale 2 new.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement For Sale 3 new.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter07302017 new.pdf31 Jul 2017
Building plan approvalFile: Comencement Certificate.pdf30 Jul 2017
PAN CardFile: Signed Pan Card Of Marvel Lifespaces LLP07302017.pdf30 Jul 2017
Copy of the legal title reportFile: Title Certificate by jayesh Nishar with pencil 01.pdf30 Jul 2017
Building Plan Approval (IOD)File: Comencement Certificate.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Architect Certificate Dhansar 01.pdf30 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 39 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Aangan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near panvel5,900+ in Raigarh

2 kmSai AanganCompleted 1Lapsed / revoked 2Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: VIR Enterprises

VIR Enterprises has 2 registrations on MahaRERA, including Sai Aangan and Asha Harmony. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai Aangan is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Aangan?

The registered promoter entity is VIR Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Aangan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sai Aangan?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sai Aangan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Aangan?

The professionals named in the filing: Architect: ANARCH ARCHITECT AND PLANNER; Engineer: SAMARTH AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Aangan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Aangan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Aangan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.