Home / Browse projects / Raigarh, Maharashtra / Prakriti Park-Ashoka (A Wing)
Prakriti Park-Ashoka (A Wing)
RG-MH-25670 · RERA P52000008575 · Last updated on MahaRERA portal: 25 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 60 months
- 1 extension taken
- Rs 9.60 crore secured on the land, in favour of Karad Bank
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Prakriti Park-Ashoka (A Wing) is a Residential / Group Housing project by Khwaish Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000008575 on 19 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 74 of the 106 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NamePrakriti Park-Ashoka (A Wing)
- TypeResidential / Group Housing
- Location
- Raigarh
- Panvel
- Pisarve
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000008575
- ReraGenie IDRG-MH-25670
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed111 files
Current status
Figures as on 25 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Prakriti Park-Ashoka A Wing | NA | 14 | 12 | 106 | 0 | 106 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 50%.
Prakriti Park-Ashoka A Wing: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed75
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Prakriti Park-Ashoka A Wing | NA | Rs 13.88 cr | Rs 8.56 cr |
| - | NA | Rs 1.29 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Destination Architect Interior Designs |
| Engineer | Adharshila consultants. |
| Engineer | Samarth Agrawal |
| Engineer | Sandesh Kothavade |
| Chartered Accountant | Jagdish Bhagat & Co |
| Chartered Accountant | Pratik Kothawale |
| Partner | Role in project |
|---|---|
| Khwaish Enterprises | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere is change in promoter from Marvel life space to Khwaish Enterprises hence for swift completion of entire project we require extension till 31.12.27. Also there are zero allottees in the project so no consent to be insisted.Please grant the Certificate.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 A wing.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 A Wing.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 A wing.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 A Wing.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 A Wing.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 A Wing.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 A Wing.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 03 a wing oct dec 25 - signed.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 03 a wing oct dec 25 - signed.pdf | 30 Jan 2026 |
| Form 1File: A Wing Form 1.pdf | 30 Oct 2025 |
| Form 2File: A Wing Form 2.pdf | 30 Oct 2025 |
| Form 3File: A Wing Form 3.pdf | 30 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: A Wing Ashoka Disclosure of sold & Unsold.pdf | 30 Oct 2025 |
| Form 2A (FY 2024-2025)File: Engineer's Certificate-Form-2-A wing 23-09-2025.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: Prakriti Park A wing form 05 fy 24-25 - signed.pdf | 30 Sep 2025 |
| Form 1File: Form 1 A Wing.pdf | 18 Jul 2025 |
| Form 2File: Form 2 A Wing.pdf | 18 Jul 2025 |
| Form 3File: Form 3 A Wing.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: A Wing Ashoka Disclosure of sold & Unsold as on 30-06-2025.pdf | 18 Jul 2025 |
| Form 1File: ARCHITECT'S CERTIFICATE-Form 1-A-Wing-19 July 2024 with sign.pdf | 26 Jun 2025 |
| Form 2File: Engineer's Certificate-Form-2-A wing 24 April 2024.pdf | 26 Jun 2025 |
| Form 3File: CA Certificate Form 3 A Wing.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Unsold A Wing.pdf | 26 Jun 2025 |
| Form 1File: A wing Archtitect Certificate Form 1.pdf | 26 Jun 2025 |
| Form 2File: A Wing Eng Certificate Form 2.pdf | 26 Jun 2025 |
| Form 3File: A Wing CA Certificate Form 3.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of Sold and Unsold A-Wing.pdf | 26 Jun 2025 |
| Form 1File: A Wing Archtitect Certificate Form 1.pdf | 26 Jun 2025 |
| Form 2File: A Wing Engineer Certificate Form 2.pdf | 26 Jun 2025 |
| Form 3File: A Wing CA certificate Form 3.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of Sold and Unsold A-Wing.pdf | 26 Jun 2025 |
| Form 1File: ARCHITECT'S CERTIFICATE-Form 1-A-Wing.pdf | 26 Jun 2025 |
| Form 2File: Engineer's Certificate-Form-2-A wing.pdf | 26 Jun 2025 |
| Form 3File: Form 3 CA A Wing.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold inventry.pdf | 26 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRAKRITI PARK WING - A _ Form 1 ARCHITECT'S CERTIFICATE.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE-Form 1-A-Wing-31-03-2025.pdf | 8 May 2025 |
| Certificates of CA (Form 3)File: CA A Wing_Signed_11zon.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-Form-2-A wing 31-03-2025.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A Wing Archtitect Certificate.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold A Wing Q2.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold A Wing Q3.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A Wing Eng Certificate.pdf | 30 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A Wing Engineer Certificate.pdf | 30 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE-Form 1-A-Wing-30-09-2024 with sign_0001.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRAKRITI PARK WING - A _ Form 1 ARCHITECT'S CERTIFICATE.pdf | 29 Jan 2025 |
| Certificates of CA (Form 3)File: Khwaish A wing Form 03 Jul Sep 24 Signed.pdf | 29 Jan 2025 |
| Certificates of CA (Form 3)File: khwaish enterprises A wing form 03 Oct Dec 24 - signed.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-Form-2-A wing 30-09-2024_0001.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prakriti Park Ashoka -- A Wing EC 31-12-24.pdf | 29 Jan 2025 |
| Declaration in FORM BFile: form b.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Declaration Registration no- P52000008575-Exhibit A (1).pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Declaration Registration no- P52000008575-Exhibit A (1).pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold A wing Ashoka (2).pdf | 13 Aug 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200316979592_For_Asset_Based_Search_13_08_2024_20_24_28_001.pdf | 13 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: ASHOKA Declaration about Separate Bank Account for real estate projects.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Declaration Registration no- P52000008575-Exhibit A.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: A Wing Ashoka Disclosure of sold and Unsold as on 30th jun 24.pdf | 26 Jul 2024 |
| Certificates of CA (Form 3)File: A wing prakriti park Form 03 -signed_0001_compressed.pdf | 26 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Declaration Registration no- P52000008575-Exhibit A.pdf | 26 Jul 2024 |
| Declaration about Commencement CertificateFile: Declaration CC.pdf | 3 Jul 2024 |
| Certificates of CA (Form 3)File: Wing -A 03 Registration Form_0001.pdf | 3 Jul 2024 |
| Layout approvalFile: Layout plan 2_11zon.pdf | 18 May 2024 |
| Layout approvalFile: Layput plan 2_11zon.pdf | 18 May 2024 |
| Building plan approvalFile: Wing A Building plan_11zon.pdf | 18 May 2024 |
| Copy of Layout Approval (in case of layout)File: Layout plan 2_11zon.pdf | 18 May 2024 |
| Copy of Layout Approval (in case of layout)File: Layput plan 2_11zon.pdf | 18 May 2024 |
| Building Plan Approval (IOD)File: Wing A Building plan_11zon.pdf | 18 May 2024 |
| Certificates of CA (Form 3)File: Khwashish Enterprises Form 3_compressed.pdf | 17 May 2024 |
| PAN CardFile: Khwaish Enterprises-Pan Card.pdf | 3 May 2024 |
| Details of encumbrancesFile: Declaration of No Financial Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrancesFile: Declaration of Non Legal Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of Non Legal Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of No Financial Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of Non Legal Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of Non Legal Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of No Financial Encumbrances_0001.pdf | 3 May 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of Non Legal Encumbrances_0001.pdf | 3 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Declaration CC.pdf | 3 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Prakriti Park Pisarve- Khwaish CC.pdf | 3 May 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sai AanganP52000004701 | panvel, Raigarh | Aug 2017 | Completed | Jun 2023Registered original: Mar 2020 | Mar 2023 |
| Asha HarmonyP51700022377 | Ghansoli, Thane | Sep 2019 | Completed | Dec 2022 | Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Prakriti Park-Ashoka (A Wing) on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
Filed coordinates, straight-line distance. 88 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Khwaish Enterprises
Khwaish Enterprises has 3 registrations on MahaRERA, including Prakriti Park-Chandan (C Wing) and Prakriti Park-Gulmohar (B Wing). Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Prakriti Park-Ashoka (A Wing) is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Prakriti Park-Ashoka (A Wing)?
The registered promoter entity is Khwaish Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Prakriti Park-Ashoka (A Wing)?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Prakriti Park-Ashoka (A Wing)?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Prakriti Park-Ashoka (A Wing)?
The professionals named in the filing: Architect: Destination Architect Interior Designs; Engineer: Adharshila consultants.; Engineer: Samarth Agrawal; Engineer: Sandesh Kothavade; Chartered Accountant: Jagdish Bhagat & Co; Chartered Accountant: Pratik Kothawale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Prakriti Park-Ashoka (A Wing)?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback