Home / Browse projects / Raigarh, Maharashtra / Prajapati Magnum Phase II

Completed No litigation declared Residential / Group Housing project

Prajapati Magnum Phase II

By PRAJAPATI DEVELOPERS

RG-MH-11918 · RERA P52000001425 · Last updated on MahaRERA portal: 19 Feb 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Prajapati Magnum Phase II is a Residential / Group Housing project by PRAJAPATI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000001425 on 28 Jul 2017. The registration is recorded completed; possession was promised by 28 Dec 2025. The completion date has moved by 30 months from the original filing.

At a glance

Project

  • NamePrajapati Magnum Phase II
  • TypeResidential / Group Housing
  • Location
    • Bokadvira
    • Dronagiri
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001425
  • ReraGenie IDRG-MH-11918

Builder

  • NamePRAJAPATI DEVELOPERS
  • Entity typeOthers
  • Named personsSUNITA PRAJAPATI, PRAJAPATI CONSTRUCTION LTD, PRAJAPATI LAWNS PREMISES PVT LTD, RAJESH PRAJAPATI, RAKESH PRAJAPATI
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2017First promiseJun 2023Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion28 Dec 2025
  • Revised completionRevised to 28 Dec 2025 (originally 30 Jun 2023)
  • Buildings2 building records
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRAJAPATI MAGNUM WING DNA220000
PRAJAPATI MAGNUM WING ENA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

PRAJAPATI MAGNUM WING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PRAJAPATI MAGNUM WING E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed158

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots158
Closed/Covered124
Open Space34
BuildingClosed/CoveredOpen SpaceTotal
PRAJAPATI MAGNUM WING D551469
PRAJAPATI MAGNUM WING E692089

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,836 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7517.0
Proposed, not sanctioned7,517 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTurbhe,plot 34,sector 24, Tk Joshi Road,Mumbai,400705

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOYUZ TALIB ARCHITECTS PVT LTD
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
PartnerRole in project
PRAJAPATI DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000012044Jun 2023 → Dec 2025

Reason as filed by the promoterConstruction of the project has showed down a little due to various factors including huge rise in cost of raw materials as well as labour. Uncertain circumstances & unpredictability of laws & rules may lead to further slowdown in construction activity. Therefore this application for extension is being made to secure the project in case of further delay that may be caused due to any extraneous reasons.

EXT52000008969Jun 2023 → Jun 2024

Reason as filed by the promoterDue to unavoidable circumstances in the coronavirus pandamic our project was inordinately delayed. Finally we received the plinth completion certificate to start further construction activity of the project from CIDCO on 28th December 2020. we are positive that we shall be able to complete the construction of this project upto OC by 29/06/2024.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Dec 2024

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Prajapati Magnum II Form 1 Dec 2024.pdf19 Feb 2025
Certificates of CA (Form 3)File: FORM 3 Prajapati Magnum II Dec 2024.pdf19 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prajapati Magnum II FORM 2 Dec 2024.pdf19 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Form 1 Prajapati Magnum Ph II Sept 2024.pdf25 Jan 2025
Certificates of CA (Form 3)File: Prajapati Magnum Phase 2 CA June 2024.pdf25 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prajaoti Magnum Ph2 Form2 June 2024.pdf25 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prajapati Magnum Ph2 Form2 Sep 2024.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Prajapati Magnum Ph 2 Disclosure of sold unsold June 2024_compressed.pdf25 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Prajapati Magnum Phase II FORM 4 - WING DE-3.pdf6 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Prajapti Magnum Phase II DE Wing OC.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 MagPH2.pdf4 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1Magnum_phaseII_REVISION.pdf16 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_Magnum_II.pdf14 Feb 2024
Form 2AFile: Form_2A_Magnum_II.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_2A_Magnum_II.pdf14 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_MG_PH2_30_09_2023.pdf7 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 78_Construction_work.pdf13 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM_1_Magnum_phase_II_31_03_2023.pdf28 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_31_12_2022_Magnum_phase 2.pdf25 Mar 2023
Form 2AFile: Form_2A_Magnum_P2_Dec_2022_compressed.pdf25 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form_2A_Magnum_P2_Dec_2022_compressed.pdf25 Mar 2023
Details of encumbrancesFile: Encumbrance_Certi_Mag_phase_II.pdf15 Jun 2022
Declaration about Commencement CertificateFile: Declaration_CC_Mag_Ph_II.pdf15 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A_Mag_Ph_II_2020-21.pdf15 Jun 2022
CERSAI detailsFile: CERSAI_Search_for_Asset_Based_Search_19_05_2022.pdf15 Jun 2022
Disclosure of sold/ booked inventoryFile: Disclosure_Sold_Units_Mag_Ph_II.pdf15 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form_5_MAG_Ph_II_FY_18_19.pdf15 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5_Prajapati_Phase-II_FY2020_21.pdf15 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mag_Form1_D_E_30_09_2021.pdf20 Nov 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Mag II.pdf18 Oct 2021
Certificates of CA (Form 3)File: MAGNUM_FORM3_II_Sep_13_2021.pdf27 Sep 2021
Proforma of Allotment letterFile: P_MAGNUM_PH_II_27_9_21.pdf27 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_Mag_Ph_2_March_2021.pdf19 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_Mag_Ph_2_June_2021.pdf19 Jul 2021
Declaration about Commencement CertificateFile: Form1_Magnun_II_30_6_21.pdf15 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Magnun_II_30_6_21.pdf15 Jul 2021
Form 2AFile: Form2A_Magnum_II_31_3_21.pdf15 Jul 2021
Form 2AFile: Form2A_Magnum_II_30_6_21.pdf15 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_Sep20.pdf13 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_Dec20.pdf13 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FM 1 AR CER 30SEP20 PH 2.pdf26 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5_FY1920_Prajapati Developers_Magnum_Phase-II.pdf2 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1-Magnum Ph-2.pdf8 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-Magnum Ph-2.pdf8 Aug 2020
Details of Restarting of Construction work post lockdownFile: Prajapati Magnum (Restart construction)-min.pdf4 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnum Ph2.pdf4 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAGNUM PH2-RERA Form1.pdf6 Jan 2020
Proforma of Allotment letterFile: PRAJAPATI_MAGNUM_PH-2_DRAFT_FORMAT.pdf6 Jan 2020
Certificates of CA (Form 5)File: Form5PRAJAPATIPhasII.pdf3 Oct 2019
Form 2AFile: Magnum Ph2 form 2a.pdf5 Jun 2019
Form 2AFile: ph2.pdf4 Jun 2019
Form 2AFile: ph2,.pdf4 Jun 2019
Form 2AFile: Magnum ph2.pdf3 Jun 2019
Details of encumbrancesFile: Index 2.pdf27 Dec 2018
Certificates of CA (Form 5)File: Form 5_Cert_50_PD_1819.pdf31 Oct 2018
Proforma of Allotment letterFile: AFS FOR RERA UPLOAD DE WING.pdf7 Aug 2018
Proforma of Allotment letterFile: AGREEMENT TO SELL - DRAFT.pdf27 Oct 2017
Details of encumbrancesFile: Declaration of no encumbrances.pdf22 Jul 2017
Details of encumbrancesFile: index II 23.pdf22 Jul 2017
Details of encumbrancesFile: index II 23 1.pdf22 Jul 2017
Details of encumbrancesFile: index II 12.pdf22 Jul 2017
Declaration in FORM BFile: Declaration - Form B.pdf22 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf22 Jul 2017
Proforma of Allotment letterFile: Agreement to Sell.pdf22 Jul 2017
Proforma of Allotment letterFile: Allotment Letter.pdf22 Jul 2017
Building plan approvalFile: Scan-0024.pdf20 Jul 2017
Building plan approvalFile: Scan-0026.pdf20 Jul 2017
Building plan approvalFile: Scan-0027.pdf20 Jul 2017
Building plan approvalFile: Scan-0028.pdf20 Jul 2017
Building plan approvalFile: Scan-0029.pdf20 Jul 2017
Building plan approvalFile: Scan-0030.pdf20 Jul 2017
Building plan approvalFile: Scan-0031.pdf20 Jul 2017
Building plan approvalFile: Scan-0032.pdf20 Jul 2017
Building plan approvalFile: Scan-0032.pdf20 Jul 2017
Building plan approvalFile: Scan-0035.pdf20 Jul 2017
Building plan approvalFile: Scan-0036.pdf20 Jul 2017
Building plan approvalFile: Scan-0037.pdf20 Jul 2017
Layout approvalFile: Layout Approval.pdf20 Jul 2017
Building plan approvalFile: Scan-0034.pdf20 Jul 2017
Building plan approvalFile: Scan-0033.pdf20 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRAJAPATI ELITE3HYDERABAD55CompletedDec 2014Dec 2014
PRAJAPATI ELITE2HYDERABAD48CompletedJan 2014Jan 2014
PRAJAPATI ELITE1HYDERABAD60CompletedJan 2012Jan 2012

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 30 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prajapati Magnum Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dronagiri5,900+ in Raigarh

2 kmPrajapati Magnum Phase ICompleted 59Lapsed / revoked 22Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: PRAJAPATI DEVELOPERS

PRAJAPATI DEVELOPERS has 2 registrations on MahaRERA, including PRAJAPATI MAGNUM and Prajapati Magnum Phase II. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Prajapati Magnum Phase II is delayed beyond 28 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prajapati Magnum Phase II?

The registered promoter entity is PRAJAPATI DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prajapati Magnum Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prajapati Magnum Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prajapati Magnum Phase II?

The professionals named in the filing: Architect: SOYUZ TALIB ARCHITECTS PVT LTD; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prajapati Magnum Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prajapati Magnum Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prajapati Magnum Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.