Home / Browse projects / Mumbai Suburban, Maharashtra / Prabhu Krupa
Prabhu Krupa
RG-MH-17943 · RERA P51800055997 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Prabhu Krupa is a Residential / Group Housing project by Mehul Kirit Mehta in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055997 on 6 May 2024. Possession is promised by 31 Dec 2027. 1 complaint is on record with the regulator.
At a glance
Project
- NamePrabhu Krupa
- TypeResidential / Group Housing
- Location
- Plot No. 41
- C.T.S. No. 275
- N.S. Road No. 3
- Vile Parle
- Vileparle
- Andheri
- Mumbai Suburban
- 400056
- Pincode400056
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800055997
- ReraGenie IDRG-MH-17943
Builder
- NameMehul Kirit Mehta
- Entity typeIndividual
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 May 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Prabhu Krupa | NA | 16 | 12 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.
Prabhu Krupa: 33% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 70% |
| Podiums (if any) | 0% |
| Plinth | 70% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 30% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed64
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashim Khatri |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | N B Sayed & Associates |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Partner | Role in project |
|---|---|
| Mehul Kirit Mehta | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503493 | Mehul Kirit Mehta | Kokilaben Jayantilal Shah (Tenant) | 30/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Prabhu Krupa as on March 2026.pdf | 17 Apr 2026 |
| Form 2File: Form 2 - Prabhu Krupa as on March 2026.pdf | 17 Apr 2026 |
| Form 3File: Form 3 - Prabhu Krupa as on March 2026.pdf | 17 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Prabhu Krupa as on March 2026.pdf | 17 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Prabhu Krupa for FY 24-25.pdf | 23 Feb 2026 |
| Form 1File: Form 1 - Prabhu Krupa as on Dec 2025.pdf | 20 Jan 2026 |
| Form 2File: Form 2 - Prabhu Krupa as on Dec 2025.pdf | 20 Jan 2026 |
| Form 3File: Form 3 - Prabhu Krupa as on Dec 2025.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Prabhu Krupa as on Dec 2025.pdf | 20 Jan 2026 |
| Form 1File: Form 1 - Prabhu Krupa as on Sep 2025.pdf | 19 Oct 2025 |
| Form 2File: Form 2 - Prabhu Krupa as on Sep 2025.pdf | 19 Oct 2025 |
| Form 3File: Form 3 - Prabhu Krupa as on Sep 2025.pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Prabhu Krupa as on Sep 2025.pdf | 19 Oct 2025 |
| Form 1File: Form 1 - Prabhu Krupa as on June 2025.pdf | 29 Sep 2025 |
| Form 2File: Form 2 - Prabhu Krupa as on June 2025.pdf | 29 Sep 2025 |
| Form 3File: Form 3 - Prabhu Krupa as on June 2025.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Prabhu Krupa as on June 2025.pdf | 29 Sep 2025 |
| Layout approvalFile: Plan 1.pdf | 12 May 2025 |
| Layout approvalFile: 2 Copy of Layout Approval (in case of layout).pdf | 12 May 2025 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 12 May 2025 |
| Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout).pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Prabhu Krupa as on 31-03-2025.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Prabhu Krupa as on March 2025.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Prabhu Krupa as on March 2025.pdf | 4 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Dec 2024.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Dec 2024).pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Prabhu Krupa as on 31-12-2024_compressed.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Prabhu Krupa as on 31-12-2024.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Prabhu Krupa as on 31-12-2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Prabhu Krupa as on 31-12-2024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Prabhu Krupa as on December 2024.pdf | 10 Jan 2025 |
| Layout approvalFile: LAyout Prabhu Krupa_11zon (1).pdf | 28 Dec 2024 |
| Building plan approvalFile: Amended IOD Plan Girish Kunj_Part1_compressed.pdf | 28 Dec 2024 |
| Building plan approvalFile: Amended IOD Plan.pdf | 28 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: LAyout Prabhu Krupa_11zon (1).pdf | 28 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Plan Girish Kunj_Part1_compressed.pdf | 28 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Plan.pdf | 28 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Prabhu Krupa as on 30-09-2024.pdf | 31 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Prabhu Krupa as on 30-09-2024.pdf | 31 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Prabhu Krupa Sep 2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prabhu Krupa - Form 1 (1).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Prabhu Krupa as on June 2024.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Prabhu Krupa as on June 2024.pdf | 18 Jul 2024 |
| Other - TechnicalFile: ANNEXURE A- Declaration Cum Undertaking.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 - Prabhu Krupa.pdf | 30 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf | 30 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf | 30 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for sale.pdf | 30 Mar 2024 |
| Copy of the legal title reportFile: SHORT TITLE_Prabhu Krupa_Mehul Mehta_19032024_11zon.pdf | 19 Mar 2024 |
| Layout approvalFile: Layout pg 1.pdf | 18 Mar 2024 |
| Building plan approvalFile: Layout pg 1.pdf | 18 Mar 2024 |
| Building plan approvalFile: Layout pg 2.pdf | 18 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Layout pg 1.pdf | 18 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 1.pdf | 18 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 2.pdf | 18 Mar 2024 |
| Proforma of Agreement for saleFile: AFS-Prabhu Krupa_Shree Balaji enterprises_08032024.pdf | 18 Mar 2024 |
| Proforma of Allotment letterFile: AL_Prabhu Krupa_Shree Balaji enterprises_08032024.pdf | 18 Mar 2024 |
| Other - LegalFile: Deed of Assignment - 1 to 100.pdf | 18 Mar 2024 |
| Other - LegalFile: Deed of Assignment - 101 to 200.pdf | 18 Mar 2024 |
| Other - LegalFile: Deed of Assignment - 201 to 290.pdf | 18 Mar 2024 |
| Other - LegalFile: Deed of Assignment - 291 to 380.pdf | 18 Mar 2024 |
| Other - LegalFile: Deed of Assignment - 381 to 410.pdf | 18 Mar 2024 |
| Other - LegalFile: Deed of Assignment - 411 to 450.pdf | 18 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf | 15 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations.pdf | 15 Mar 2024 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf | 15 Mar 2024 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations.pdf | 15 Mar 2024 |
| Declaration about Commencement CertificateFile: FORMAT D - For Single Building.pdf | 15 Mar 2024 |
| Declaration in FORM BFile: FORM B.pdf | 15 Mar 2024 |
| CERSAI detailsFile: DECLARATION of Cersai.pdf | 15 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 15 Mar 2024 |
| PAN CardFile: Pan Card - Mehul Mehta - Color.pdf | 12 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 12 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Prabhu Krupa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vile Parle6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 312 registered projects within 2 km.
CHANDAK VANSHAM
CHANDAK REALTORS PRIVATE LIMITED
AJOD ONE
AJOD REALTY LLP
GAUTAM DHAN
NEW INDIA CONSTRUCTIONS
AJMERA SHRINGAAR
H J CORPORATION
Imperial Landmark
Neminath and Disha Realtors
PINAL EVANA
Pinal Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Mehul Kirit Mehta
Mehul Kirit Mehta has 2 registrations on MahaRERA, including Shreenaths Legacy and Prabhu Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Prabhu Krupa is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Prabhu Krupa?
The registered promoter entity is Mehul Kirit Mehta, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Prabhu Krupa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Prabhu Krupa?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Prabhu Krupa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Prabhu Krupa?
The professionals named in the filing: Architect: Ashim Khatri; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Prabhu Krupa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback