ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Prabhakar Smruti

Completed No litigation declared Residential / Group Housing project

Prabhakar Smruti

By Gangotree Greenbuild

RG-MH-23103 · RERA P52100032653 · Last updated on MahaRERA portal: 17 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 99%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Prabhakar Smruti is a Residential / Group Housing project by Gangotree Greenbuild in Pune, Maharashtra, registered with MahaRERA as P52100032653 on 17 Jan 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NamePrabhakar Smruti
  • TypeResidential / Group Housing
  • Location
    • Dahanukar Colony
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • RERA no.P52100032653
  • ReraGenie IDRG-MH-23103

Builder

  • NameGangotree Greenbuild
  • Entity typePartnership
  • PartnersMakarand Vasant Kelkar, Ganesh Dnyanoba Jadhav, Rajendra Dnyaneshwar Awate
  • Other registrations6 more →
  • Completed6 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jan 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Prabhakar SmrutiNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

Prabhakar Smruti: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.49%

Progress on shared amenities16

As on 17 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Solar water heatingYes0%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area708 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Gangotree GreenbuildPune (M Corp.)Pune
Prabhakar Smruti Co Op Hsg Society LtdKothrudPune

Approvals and building plan

Permissible FSI2322.0
Proposed, not sanctioned1,914 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKamala Nehru park Erandwane

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHemant Mahajan
EngineerTushar Deshpande
Chartered AccountantChandorkar & Limaye
PartnerRole in project
Gangotree Greenbuild-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Oct 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - PS.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PS.pdf17 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: 241017205310_0001.pdf17 Oct 2024
Status of ConveyanceFile: PRCard - PS.pdf17 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: PS.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert - PS.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_PS.pdf17 Jul 2024
Building plan approvalFile: 01-03.pdf11 May 2024
Building plan approvalFile: 02-03.pdf11 May 2024
Building plan approvalFile: 03-03.pdf11 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 01-03.pdf11 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 02-03.pdf11 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 03-03.pdf11 May 2024
Commencement Certificates / NA Order for plotted developmentFile: cc compressed.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: PS.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: PS.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Prabhakar smruti.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: Prabhakar Smruti.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prabhakar Smruti_CA Cert.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate -PS.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer - PS.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PrabhakarSmruti-Architect Certificate-16-10-2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Prabhakar Smruti-16-10-23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PrabhakarSmruti-Architect Certificate-04-08-23.pdf26 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PrabhakarSmruti-19-07-23.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun-23 CA certificates (1) 21-7-23_compressed.pdf26 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold details.pdf25 Jul 2023
PAN CardFile: New Pan Card GH.pdf21 Jul 2023
Declaration in FORM BFile: Form B_Prabhakar Smruti.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf3 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf3 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-Prabhakar Smruti.pdf3 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PrabhakarSmruti-Architect Certificate-28-4-23.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - PrabhakarSmruti-19-4-23.pdf2 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Prabhakar Smruti 31-3-22.pdf2 Jun 2023
Building plan approvalFile: DWG1.pdf5 May 2023
Building plan approvalFile: DWG2.pdf5 May 2023
Building plan approvalFile: DWG3.pdf5 May 2023
Details of encumbrancesFile: Encumbrance details - Finance.pdf5 May 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance - Legal.pdf5 May 2023
Details of encumbrances concerned to LegalFile: No Encumbrance - Legal.pdf5 May 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG1.pdf5 May 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG2.pdf5 May 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG3.pdf5 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC1.pdf5 May 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf5 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 May 2023
Proforma of Agreement for saleFile: Agreement - Prabhakar Smruti.pdf15 Apr 2023
Proforma of Agreement for saleFile: Agreement - Prabhakar Smruti.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PrabhakarSmruti- Architect Certificate-16-11-22.pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prabhakar Smruti Architect Certificate-16-1-23.pdf28 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PrabhakarSmruti-17-10-22.pdf28 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Prabhakar Smruti-10-1-23.pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Cert Form 3 GGB Prabhakar Smruti.pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PS-CA Certificate 4-3-23.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report-Prabhakar Smruti.pdf28 Mar 2023
Layout approvalFile: sanction 1.pdf10 Jan 2022
Building plan approvalFile: sanction 1.pdf10 Jan 2022
Building plan approvalFile: sanction 2.pdf10 Jan 2022
Building plan approvalFile: sanction 3.pdf10 Jan 2022
Copy of the legal title reportFile: legal title report rera format.pdf10 Jan 2022
Details of encumbrancesFile: non encumbrances.pdf10 Jan 2022
Copy of Layout Approval (in case of layout)File: sanction 1.pdf10 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: sanction 1.pdf10 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: sanction 2.pdf10 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: sanction 3.pdf10 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement 2.pdf10 Jan 2022
Declaration about Commencement CertificateFile: declaration commencement.pdf10 Jan 2022
PAN CardFile: pan card GGB.pdf29 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement 1.pdf29 Dec 2021
Declaration in FORM BFile: affidavit form b.pdf29 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200227794448_For_Debtor_Based_Search_10_01_2022_16_39_50_673.pdf29 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 gangotree greenb build prabhakarsmruti.pdf29 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
DHANVANTARIPlot No. 68 Rambaug Colony Paud Road Kothrud Pune 41103835CompletedJun 2017May 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prabhakar Smruti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothrud13,700+ in Pune

Builder: Gangotree Greenbuild

Gangotree Greenbuild has 7 registrations on MahaRERA, including Priyadarshan and SUHRUD. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Prabhakar Smruti is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prabhakar Smruti?

The registered promoter entity is Gangotree Greenbuild, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prabhakar Smruti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prabhakar Smruti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prabhakar Smruti?

The professionals named in the filing: Architect: Hemant Mahajan; Engineer: Tushar Deshpande; Chartered Accountant: Chandorkar & Limaye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prabhakar Smruti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prabhakar Smruti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prabhakar Smruti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.