Registered No litigation declared Residential / Group Housing project

POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6

By UNIQUE SHANTI VENTURES LLP

RG-MH-17855 · RERA P51700055810 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
18 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 80%
239 of 365Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6 is a Residential / Group Housing project by UNIQUE SHANTI VENTURES LLP in Thane, Maharashtra, registered with MahaRERA as P51700055810 on 22 Apr 2024. Possession is promised by 31 Dec 2027. 126 of the 365 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete.

At a glance

Project

  • NamePOONAM ESTATE CLUSTER-II BUILDING NO 4,5,6
  • TypeResidential / Group Housing
  • Location
    • Srishti Road
    • Opp. Surya Shopping Centre
    • Mira Road (E)
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700055810
  • ReraGenie IDRG-MH-17855

Builder

  • NameUNIQUE SHANTI VENTURES LLP
  • Entity typePartnership
  • PartnersDILESH SHAH, KUNAL DOSHI, HEMAL DOSHI

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed88 files

Current status

35%126 of 365 units booked
34.4%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B-2, BUILDING NO 4NA24201166122
B-3, BUILDING NO 5NA24201156121
B-4, BUILDING NO 6NA24201166122

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.

B-2, BUILDING NO 471%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-3, BUILDING NO 570%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-4, BUILDING NO 670%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed207

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots207
Closed/Covered207
BuildingClosed/CoveredTotal
B-2, BUILDING NO 46969
B-3, BUILDING NO 56969
B-4, BUILDING NO 66969

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,244 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025
LandownerVillageDistrict
MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITYGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
RAVI DEVELOPMENTSGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI26937.83
Proposed, not sanctioned26,938 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchE-41 Poonam Chambers Phase-III, Shanti Park, Mira Road East 401 107
Estimated costRs 195.67 cr
Cost incurredRs 67.23 cr
Work done34.36%
BuildingWingEstimatedIncurred
B-2, BUILDING NO 4NARs 65.16 crRs 22.41 cr
B-3, BUILDING NO 5NARs 65.16 crRs 22.41 cr
B-4, BUILDING NO 6NARs 65.16 crRs 22.41 cr
-NARs 20.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH MHATRE & ASSOCIATES
ArchitectSQUARE ARCHITECTS
EngineerELLORA PROJECT CONSULTANTS
Chartered AccountantHITESH SHAH AND ASSOCIATES
Chartered AccountantAJAY SHAH & CO.
PartnerRole in project
UNIQUE SHANTI VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf21 Apr 2026
Withdrawal Update Form 1File: Form1.pdf17 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 31-12-2025.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - 2025 Cluster II 4-5-6.pdf5 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf20 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf18 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf18 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
Form 1File: Architect Certificate.pdf7 Jul 2025
Form 2File: FORM 2 Engineers Certificate 300924.pdf7 Jul 2025
Form 3File: CA Certificate Form 3 Cl-II Bldg No 4-5-6.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf7 Jul 2025
Form 1File: Architect Certificate.pdf7 Jul 2025
Form 2File: FORM 2 Engineers Certificate.pdf7 Jul 2025
Form 3File: CA Certificate Form 3 - Cluster-II Bldg No 4-5-6.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf7 Jul 2025
Form 1File: FORM 1 Architect Certificate.pdf7 Jul 2025
Form 2File: FORM 2 Engineers Certificate.pdf7 Jul 2025
Form 3File: CA Certificate PECL-II 456.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf7 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate PECL-II 456.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A March 2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 - Cluster-II Bldg No 4-5-6.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Dec 2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Cl-II Bldg No 4-5-6.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate 300924.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Sep 2024.pdf16 Dec 2024
Other - TechnicalFile: Letter from MBMC for Typographical error.pdf22 Apr 2024
Copy of the legal title reportFile: Title Certificate.pdf11 Apr 2024
Copy of the legal title reportFile: Flow of the Title.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Culster-II 4-5-6.pdf10 Apr 2024
Layout approvalFile: Layout Plan 2018.pdf28 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout Plan 2018.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate 190324.pdf28 Mar 2024
Other - FinanceFile: Letter to MAHARERA for explanation.pdf28 Mar 2024
Other - TechnicalFile: Letter to MAHARERA for Typographical error.pdf28 Mar 2024
Other - TechnicalFile: Annexure A Declaration cum Undertaking.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumberances Certificate Finance200324.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumberances Certificate Finance200324.pdf21 Mar 2024
CERSAI detailsFile: Undertaking NO CERSAI REPORT 200324.pdf21 Mar 2024
Building plan approvalFile: Bldg no 4.pdf2 Mar 2024
Building plan approvalFile: Bldg no 4A.pdf2 Mar 2024
Building plan approvalFile: Bldg no 5.pdf2 Mar 2024
Building plan approvalFile: Bldg no 5A.pdf2 Mar 2024
Building plan approvalFile: Bldg no 6.pdf2 Mar 2024
Building plan approvalFile: Bldg no 6A.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumberances Certificate Finance.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumberances Certificate Legal.pdf2 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumberances Certificate Finance.pdf2 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumberances Certificate Legal.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 4.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 4A.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 5.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 5A.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 6.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 6A.pdf2 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Mar 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf2 Mar 2024
Declaration in FORM BFile: Form B Affidavit cum Declaration USVLLP.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf2 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A certificate no 1.pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in Other Real Estate Org Dilesh Shah.pdf2 Mar 2024

How this compares with Thane

35%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira Road (E)7,600+ in Thane

Builder: UNIQUE SHANTI VENTURES LLP

UNIQUE SHANTI VENTURES LLP has 1 registration on MahaRERA, including POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6?

The registered promoter entity is UNIQUE SHANTI VENTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6?

The professionals named in the filing: Architect: AVINASH MHATRE & ASSOCIATES; Architect: SQUARE ARCHITECTS; Engineer: ELLORA PROJECT CONSULTANTS; Chartered Accountant: HITESH SHAH AND ASSOCIATES; Chartered Accountant: AJAY SHAH & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POONAM ESTATE CLUSTER-II BUILDING NO 4,5,6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.