Home / Browse projects / Pune, Maharashtra / PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE

Completed No litigation declared Residential / Group Housing project

PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE

By PMAY CELL,PUNE MUNICIPAL CORPORATION

RG-MH-16153 · RERA P52100026784 · Last updated on MahaRERA portal: 12 Dec 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE is a Residential / Group Housing project by PMAY CELL,PUNE MUNICIPAL CORPORATION in Pune, Maharashtra, registered with MahaRERA as P52100026784 on 25 Oct 2020. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NamePMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE
  • TypeResidential / Group Housing
  • Location
    • -
    • HADAPSAR
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • RERA no.P52100026784
  • ReraGenie IDRG-MH-16153

Builder

  • NamePMAY CELL,PUNE MUNICIPAL CORPORATION
  • Entity typePublic Authority
  • Other registrations9 more →
  • Completed7 of 10
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2020PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Oct 2020
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA60000
BUILDING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,250 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3507.55
Proposed, not sanctioned3,508 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPMC MAIN BUILDING,SHIVAJI NAGAR, PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAMAKANT BHUTADA
EngineerMRS MEERA SHRINIVAS SABNIS
Chartered AccountantPAVAN JAIN AND CO
Chartered AccountantA R SULAKHE & COMPONY
PartnerRole in project
PMAY CELL,PUNE MUNICIPAL CORPORATION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Nov 2023

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: layout1-2.pdf12 Dec 2023
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances (1).pdf12 Dec 2023
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (1).pdf12 Dec 2023
Copy of Layout Approval (in case of layout)File: layout1-2.pdf12 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 100 ts revised layout plan CC.pdf12 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: pmay hadapsar CC_compressed.pdf12 Dec 2023
Declaration about Commencement CertificateFile: 100 ts revised layout plan CC.pdf12 Dec 2023
Declaration about Commencement CertificateFile: pmay hadapsar CC_compressed.pdf12 Dec 2023
Declaration about Commencement CertificateFile: pmay hadapsar CC_compressed.pdf12 Dec 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Aradhana Pmay Certificate.pdf12 Dec 2023
Layout approvalFile: HPSC0112.pdf4 Dec 2023
Building plan approvalFile: HPSC0113.pdf4 Dec 2023
Building plan approvalFile: HPSC0115.pdf4 Dec 2023
Copy of Layout Approval (in case of layout)File: HPSC0112.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0113.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0115.pdf4 Dec 2023
Architect’s Certificate on Completion of Project (Form 4)File: HADAPSAR 100 FORM 04.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINERS CERTIFICATE-31-3-2022_compressed.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINERS CERTIFICATE-30-06-2022_compressed.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINERS CERTIFICATE-30-09-2022_compressed.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINERS CERTIFICATE-31-12-2022_compressed.pdf8 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: भोगावटा पत्र_compressed (1).pdf1 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL COMPLITION HADAPSAR-100.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PMAY HADAPSAR 100TS RERA JUNE 2023.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122022.pdf16 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092022_compressed.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062022.pdf5 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: had106-12b-3103-22.pdf7 Apr 2022
Declaration about Commencement CertificateFile: format-Dhadp 100EWS.pdf11 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HAD106-12 31-12-21.pdf11 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 31-12-21had 106-12-3.pdf28 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 300921had106-12-3.pdf14 Dec 2021
Declaration about Commencement CertificateFile: CC 100 Hadapsar_compressed.pdf15 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: had12-30092021.pdf15 Nov 2021
Copy of the legal title reportFile: Hadapsar 106A-12B Search Report.pdf24 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2020-1_compressed.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2021-1_compressed.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2021-1_compressed.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-2020-2.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2021-2.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-06-2021-2.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31-12-2020-21.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31-03-2021-21.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 30-06-2021-21.pdf13 Aug 2021
Layout approvalFile: 106A 12B Plan.pdf21 Oct 2020
Building plan approvalFile: 106A 12B Plan.pdf21 Oct 2020
Copy of the legal title reportFile: search report 106A 12B-1-3.pdf21 Oct 2020
Copy of the legal title reportFile: search report 106A 12B-4-6.pdf21 Oct 2020
Copy of the legal title reportFile: Title Declaration 106A.pdf21 Oct 2020
Copy of Layout Approval (in case of layout)File: 106A 12B Plan.pdf21 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: 106A 12B Plan.pdf21 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC hadpasar 106 A.pdf21 Oct 2020
Declaration in FORM BFile: Declaration 106A 12B HDP_compressed.pdf21 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 106A 12B compressed.pdf21 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate 106A12B (1) (1).pdf21 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form NEW 106 Final FINAL-signed FINAL FINAL_compressed.pdf21 Oct 2020
Proforma of Allotment letterFile: करारनामा रेरा नोंदणी builder buyer.pdf21 Oct 2020
PAN CardFile: PMAY PAN.pdf8 Apr 2020
Details of encumbrancesFile: No Encum 106A 12B.pdf8 Apr 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf8 Apr 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HADAPSAR13,700+ in Pune

Builder: PMAY CELL,PUNE MUNICIPAL CORPORATION

PMAY CELL,PUNE MUNICIPAL CORPORATION has 10 registrations on MahaRERA, including 39 PART PLUS 40 PART WADGAON KH TAL HAVELI DIST PUNE PHASE I and PMAY SCHEME SURVEY NO 57 HISSA NO 5 PART PLOT NO 1A OLD PLOT NO 1 KHARADI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE?

The registered promoter entity is PMAY CELL,PUNE MUNICIPAL CORPORATION, a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE?

The professionals named in the filing: Architect: RAMAKANT BHUTADA; Engineer: MRS MEERA SHRINIVAS SABNIS; Chartered Accountant: PAVAN JAIN AND CO; Chartered Accountant: A R SULAKHE & COMPONY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HADAPSAR, TAL HAVELI, DIST PUNE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PMAY SCHEME AT SURVEY NO 106A/12B/3B PART HA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.