De-registered No litigation declared Residential / Group Housing project

Playtor Paud D- Phase 2

By SANGAM REALTY

RG-MH-95525 · RERA P52100018651 · Last updated on MahaRERA portal: 21 Nov 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 177 documents Report an error

Playtor Paud D- Phase 2 is a Residential / Group Housing project by SANGAM REALTY in Pune, Maharashtra, registered with MahaRERA as P52100018651 on 22 Nov 2018. Possession was promised by 25 Sep 2026 and is now 1 months past that date.

At a glance

Project

  • NamePlaytor Paud D- Phase 2
  • TypeResidential / Group Housing
  • Location
    • Paud-Mulshi Road
    • Next to Tehsil Office
    • Paud
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018651
  • ReraGenie IDRG-MH-95525

Builder

  • NameSANGAM REALTY
  • Entity typePartnership
  • PartnersSANTOSH MOTILAL BHANSALI, NANDKUMAR SOPAN GADHAVE
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live4 lapsed, de-registered or revoked

Key dates

1 months past promisethis monthRegisteredNov 2018PromisedSep 2026

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on22 Nov 2018
  • Promised completion25 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed177 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D1NA50000
D2NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

D10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 21 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Retaining WallYes0%
EarthworkYes0%
Compound WallYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,482 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4266.86
Proposed, not sanctioned4,267 sq m
Buildings approved2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchII-5C, MITTAL COURT, 224, NARIMAN POINT, MUMBAI- 400021

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH NAWATHE
EngineerSatish Marathe
PartnerRole in project
SANGAM REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed177

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Cert no 1 FY2018 2019.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Cert no 2 FY2019 2020.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Cert no 3 FY2020 2021.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Cert no 3 FY2020 2021.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Cert no 5 FY2022 2023.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Cert no 1 FY2018 2019.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Cert no 2 FY2019 2020.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Cert no 3 FY2020 2021.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Cert no 5 FY2022 2023.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Cert no 3 FY2020 2021.pdf21 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 6 Oct Dec 2019.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 7 Jan Mar 2020.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 8 April June 2020.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 9 July Sept 2020.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 10 Oct Dec 2020.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 11 Jan Mar 2021.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 12 April June 2021.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 13 July Sept 2021.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 14 Oct Dec 2021.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 15 Jan Mar 2022.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 16 April June 2022.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 17 July Sept 2022.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 18 Oct Dec 2022.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 19 Jan Mar 2023.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 20 April June 2023.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 21 July Sept 2023.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 22 Oct Dec 2023.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 23 Jan Mar 2024.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 24 April June 2024.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 1 Apr Jun 2018.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 2 July Sept 2018.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 3 Oct Dec 2018.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 4 Jan Mar 2019.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 5 Apr June 2019.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 6 July Sept 2019.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 7 Oct Dec 2019.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 8 Jan Mar 2020.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 9 Apr June 2020.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 10 July Sept 2020.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 11 Oct Dec 2020.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 12 Jan Mar 2021.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 13 Apr Jun 2021.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 14 July Sept 2021.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 15 Oct Dec 2021.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 16 Jan Mar 2022.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 17 Apr June 2022.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 18 July Sept 2022.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 19 Oct Dec 2022.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 20 Jan Mar 2023.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 21 Apr June 2023.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 22 July Sept 2023.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 23 Oct Dec 2023.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 24 Jan Mar 2024.pdf8 Oct 2024
Certificates of CA (Form 3)File: Cert no 25 Apr June 2024.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 24 Jan Mar 2024.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 24 Jan Mar 2024.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 1 Oct Dec 2018.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 2 Jan Mar 2019.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 3 April Jun 2019.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 4 July Sept 2019.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 5 Oct Dec 2019.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 6 Jan Mar 2020.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 7 April Jun 2020.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 8 July Sept 2020.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 9 Oct Dec 2020.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 10 Jan Mar 2021.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 11 April Jun 2021.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 12 July Sept 2021.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 13 Oct Dec 2021.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 14 Jan Mar 2022.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 15 April Jun 2022.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 16 July Sept 2022.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 17 Oct Dec 2022.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 18 Jan Mar 2023.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 19 April Jun 2023.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 20 July Sept 2023.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 21 Oct Dec 2023.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 22 Jan Mar 2024.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cert no 23 April Jun 2024.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cert no 1 July Sept 2018.pdf8 Oct 2024

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Playtor Paud D- Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Next to Tehsil Office13,700+ in Pune

2 kmPlaytor Paud D- Phase 2Completed 2Lapsed / revoked 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: SANGAM REALTY

SANGAM REALTY has 5 registrations on MahaRERA, including Playtor Paud C- Phase 1 and Playtor Paud C- Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Playtor Paud D- Phase 2 shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Playtor Paud D- Phase 2 is delayed beyond 25 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Playtor Paud D- Phase 2?

The registered promoter entity is SANGAM REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Playtor Paud D- Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Playtor Paud D- Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Playtor Paud D- Phase 2?

The professionals named in the filing: Architect: AVINASH NAWATHE; Engineer: Satish Marathe. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Playtor Paud D- Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Playtor Paud D- Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Playtor Paud D- Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.