Home / Browse projects / Raigarh, Maharashtra / Platinum The Reserve

Registered No litigation declared Others project

Platinum The Reserve

By Escaso Ventures

RG-MH-19135 · RERA P52000078185 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 65%
83 of 121Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Platinum The Reserve is a Others project by Escaso Ventures in Raigarh, Maharashtra, registered with MahaRERA as P52000078185 on 29 Nov 2024. Possession is promised by 31 Dec 2030. 38 of the 121 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NamePlatinum The Reserve
  • TypeOthers
  • Location
    • Sector - 11
    • Kharghar
    • Navi Mumbai
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000078185
  • ReraGenie IDRG-MH-19135

Builder

  • NameEscaso Ventures
  • Entity typePartnership
  • PartnersJignesh Virchand Visaria, Ramesh Dharamshi Patel, Pratik Girish Chheda
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

31%38 of 121 units booked
19.7%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Wing and B WingNA231810417121

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 65%.

A Wing and B Wing: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)65%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure11%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.2%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed417

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots417
Closed/Covered417

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,891 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Dec 2025

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI25091.64
Proposed, not sanctioned21,907 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHAWARE CENTURION MALL,PLOT NO 88-91, SECTOR – 19A,NERUL EAST, NAVI MUMBAI,DIST. THANE, MAHARASHTRA , PIN 400706.
Estimated costRs 96.70 cr
Cost incurredRs 19.02 cr
Work done19.66%
BuildingWingEstimatedIncurred
A Wing and B WingNARs 87.03 crRs 19.02 cr
-NARs 9.67 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerA G Gokhale & Associates
EngineerANAND KAMBLE
Chartered AccountantMs Pratiksha Tulshyan & Associates
Chartered AccountantSINGHAL A & ASSOCIATES
Chartered AccountantARUN BORAD & CO.
PartnerRole in project
Escaso Ventures-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A.pdf26 May 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf26 May 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3.PDF30 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf3 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf3 Apr 2026
Withdrawal Update Form 3File: FORM 3.PDF3 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf2 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf2 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf2 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf2 Apr 2026
Withdrawal Update Form 3File: FORM 3.PDF2 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf2 Apr 2026
Form 1File: FORM 1.pdf31 Mar 2026
Form 2File: FORM 2.pdf31 Mar 2026
Form 3File: FORM 3.PDF31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Sold Details.pdf31 Mar 2026
Form 1File: FORM 1.pdf31 Mar 2026
Form 2File: FORM 2.pdf31 Mar 2026
Form 3File: FORM 3.PDF31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Sold Details.pdf31 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5_FY 2024-25.pdf26 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Platinum The Reserve Form 1 (1).pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Platinum The Reserve Sold Inventory (1).pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Platinum The Reserve Form 1.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Platinum The Reserve Sold Inventory.pdf23 Jan 2025
Copy of the legal title reportFile: Title report - Platinum Reserve.PDF22 Nov 2024
Proforma of Allotment letterFile: Reviewed Allotment Letter_Platinum The Reserve_22112024.pdf22 Nov 2024
Declaration about Commencement CertificateFile: Format D - Platinum.pdf22 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Platinum.pdf22 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Al Platinum.pdf22 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS Platinum.pdf22 Nov 2024
Proforma of Agreement for saleFile: Reviewed AFS_Platinum The Reserve_22112024.pdf22 Nov 2024
Other - LegalFile: Agreement to lease plot no 90-11.pdf19 Nov 2024
Other - TechnicalFile: ATUL PATEL Development permission_CC granted on plot no 90, Sector 11 at Kharghar.pdf19 Nov 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues finance k.pdf11 Nov 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations legal k.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1ST FORM -3 THE PLATINUM RESERVE.pdf11 Nov 2024
CERSAI detailsFile: Declaration of Cersai k.pdf11 Nov 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues finance k.pdf11 Nov 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations legal k.pdf11 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for secured.pdf11 Nov 2024
Other - TechnicalFile: Order No 50 Platinum.pdf9 Nov 2024
Declaration in FORM BFile: form B (3).pdf7 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: escaso Ann-A_merged.pdf7 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Revised.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form -2.PDF30 Oct 2024
Other - LegalFile: Escaso Ventures Partnership Deed_compressed (1).pdf30 Oct 2024
Building plan approvalFile: CC DRG-9-11.pdf28 Oct 2024
Building plan approvalFile: CC DRG-6-8.pdf28 Oct 2024
Building plan approvalFile: CC DRG-3-5.pdf28 Oct 2024
Building plan approvalFile: CC DRG-1-2_compressed.pdf28 Oct 2024
Layout approvalFile: CC DRG-1_compressed.pdf28 Oct 2024
PAN CardFile: ESCASO VENTURES PAN.pdf28 Oct 2024
Copy of Layout Approval (in case of layout)File: CC DRG-1_compressed.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 with sing.PDF28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DRG-9-11.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DRG-1-2_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DRG-3-5.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DRG-6-8.pdf28 Oct 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Platinum EsquireP52000054452Ulawe, Raigarh132Jan 2024OngoingDec 2029Not due yet
PLATINUM MANSIONZP51700053815Nerul, Navi Mumbai, Thane81Dec 2023OngoingDec 2029Not due yet
Platinum WestwoodsP51700050489Nerul, Navi Mumbai, Thane26Apr 2023OngoingDec 2027Not due yet
PLATINUM ELYSIUMP51700050735NERUL, Thane60Apr 2023OngoingDec 2027Not due yet

How this compares with Raigarh

31%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Platinum The Reserve on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar, Navi Mumbai5,900+ in Raigarh

2 kmPlatinum The ReserveCompleted 23Lapsed / revoked 4Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Escaso Ventures

Escaso Ventures has 3 registrations on MahaRERA, including Platinum The Reserve and Platinum Oakwoods. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Platinum The Reserve is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Platinum The Reserve?

The registered promoter entity is Escaso Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Platinum The Reserve?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Platinum The Reserve?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Platinum The Reserve?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: A G Gokhale & Associates; Engineer: ANAND KAMBLE; Chartered Accountant: Ms Pratiksha Tulshyan & Associates; Chartered Accountant: SINGHAL A & ASSOCIATES; Chartered Accountant: ARUN BORAD & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Platinum The Reserve?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Platinum The Reserve. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Platinum The Reserve to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.