ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Plan I

Registered Litigation declared Commercial project

Plan I

By M/S. Tescon Plan-I LLP

RG-MH-05854 · RERA P51700051273 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 80%
163 of 495Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Plan I is a Commercial project by M/S. Tescon Plan-I LLP in Thane, Maharashtra, registered with MahaRERA as P51700051273 on 8 Jun 2023. Possession is promised by 31 Dec 2026. 332 of the 495 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NamePlan I
  • TypeCommercial
  • Location
    • Shirawane
    • Trans Thane Creek
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051273
  • ReraGenie IDRG-MH-05854

Builder

  • NameM/S. Tescon Plan-I LLP
  • Entity typeOthers
  • Named personsSiddharth Khanna, Subhash Pareek

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

67%332 of 495 units booked
21.3%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Plan INA440495495

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

Plan I: 7% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,003 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI12000.93
Proposed, not sanctioned3,775 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVashi Branch Sector - 1
Estimated costRs 130.00 cr
Cost incurredRs 27.67 cr
Work done21.28%
BuildingWingEstimatedIncurred
Plan INARs 123.50 crRs 27.67 cr
-NARs 6.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimensions Architects Pvt Ltd
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
M/S. Tescon Plan-I LLP-

Litigation declared1

CaseCourtStatus
CC12500520/2025BEFORE THE MAHARASHTRA REAL ESTATE REGULATORY AUTHORITYClosed

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12500520Jignesh GamdhaM/S. Tescon Plan-I LLP15/02/2025
CC12503886Satyendra Ratan JainM/S. Tescon Plan-I LLP06/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 -Plan I as on Dec 2025.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 -Plan I as on Dec 2025.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 - Plan I as on March 2026.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2 - Plan I as on Sept 2025.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2 - Plan I as on Dec 2025.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2 - Plan I as on March 2026.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 - Plan I as on Sept 2025.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 - Plan I as on Dec 2025.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 - Plan I as on March 2026.pdf6 Jun 2026
Building plan approvalFile: Approved Drwgs.pdf22 Dec 2025
Form 1File: Form 1 - Plan I as on June 2025.pdf24 Jul 2025
Form 2File: Form 2 - Plan I as on June 2025.pdf24 Jul 2025
Form 3File: Form 3 - Plan I as on June 2025.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Plan I as on June 2025.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on March 2025.pdf16 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Plan I as on Fy 23-24.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Plan I as on Dec 2024.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Plan I as on Dec 2024.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on Dec 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Plan I as on Sep 2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Plan I as on Sep 2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on Sep 2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Plan I as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Plan I as on 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on June 2024.pdf12 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Plan I.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Plan I as on March 2024.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Plan I as on 31-03-24.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on March 2024.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on Dec 2023.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Plan I as on Dec 2023.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Plan I as on Dec 2023.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KA.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Plan I as on Sep 23_Revised.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Plan I as on June 2023.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Plan I as on Sep 2023.pdf5 Feb 2024
Layout approvalFile: Plan I - Layout.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: Plan I - Layout.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on June 2023.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Plan I as on Sep 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Plan I as on June 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Plan I as on Sep 2023.pdf1 Feb 2024
Proforma of Agreement for saleFile: Agreement for Sale_Plan I.pdf20 Dec 2023
Details of encumbrances concerned to FinanceFile: Plan I Encumbrance (2).pdf14 Oct 2023
Details of encumbrances concerned to LegalFile: Plan I Encumbrance (2).pdf14 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Subhash Pareek (1).pdf30 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank details .pdf30 May 2023
CERSAI detailsFile: CERSAI Report (1).pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Disclosures.pdf21 May 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf19 May 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf19 May 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf12 May 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1)_compressed.pdf12 May 2023
Proforma of Agreement for saleFile: Plan I AFS.pdf12 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation sheet_1mb.pdf12 May 2023
Layout approvalFile: Approved Drwaings D522.pdf11 May 2023
Building plan approvalFile: Approved Drwaings D522.pdf11 May 2023
PAN CardFile: Tescon Plan I LLP E Pan.pdf11 May 2023
Copy of the legal title reportFile: RERA Title Report.pdf11 May 2023
Copy of Layout Approval (in case of layout)File: Approved Drwaings D522.pdf11 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Drwaings D522.pdf11 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC D 522 (1).pdf11 May 2023
Declaration about Commencement CertificateFile: Format D.pdf11 May 2023
Declaration in FORM BFile: FORM B.pdf11 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 .pdf11 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 May 2023
CERSAI detailsFile: Cersai Report.pdf11 May 2023
Proforma of Allotment letterFile: Allotment Letter.pdf11 May 2023
Deviation Report with respect to Allotment letterFile: Deviation Sheet.pdf11 May 2023

How this compares with Thane

67%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Plan I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Trans Thane Creek7,600+ in Thane

2 kmPlan ICompleted 3Lapsed / revoked 3Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: M/S. Tescon Plan-I LLP

M/S. Tescon Plan-I LLP has 1 registration on MahaRERA, including Plan I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Plan I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Plan I?

The registered promoter entity is M/S. Tescon Plan-I LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Plan I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Plan I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Plan I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Plan I?

The professionals named in the filing: Architect: Dimensions Architects Pvt Ltd; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Plan I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Plan I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Plan I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.