Completed No litigation declared Residential / Group Housing project

PINNACOLO

By SKD REALTY LLP

RG-MH-25621 · RERA P51700008205 · Last updated on MahaRERA portal: 2 Apr 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 60%
1Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

PINNACOLO is a Residential / Group Housing project by SKD REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700008205 on 18 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. The completion date has moved by 6 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePINNACOLO
  • TypeResidential / Group Housing
  • Location
    • BEVERLY PARK
    • MIRA ROAD
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008205
  • ReraGenie IDRG-MH-25621

Builder

  • NameSKD REALTY LLP
  • Entity typeOthers
  • PartnersNAVIN POPATLAL SHAH, MAHENDRA MILAPCHAND KANUNGO
  • Named personsNAVIN POPATLAL SHAH, MAHENDRA MILAP KANUNGO, DIMPLE REALTORS PRIVATE LIMITED
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017First promiseJun 2018Revised toDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionRevised to 31 Dec 2018 (originally 30 Jun 2018)
  • Buildings2 building records
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PINNACOLO B C D WINGNA260000
PINNACOLO A WINGNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 60%.

PINNACOLO B C D WING96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
PINNACOLO A WING60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed254

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots254
Closed/Covered204
Open Space50
BuildingClosed/CoveredOpen SpaceTotal
PINNACOLO B C D WING14134175
PINNACOLO A WING631679

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,590 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI22355.32
Proposed, not sanctioned22,355 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 122 SAMBHAV DARSHAN BLDG MAIN KASTURBA ROAD MUMBAI 400066

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD N PATEL AND ASSOCIATES
EngineerELLORA PROJECT CONSULTANTS
PartnerRole in project
SKD REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700000468Jun 2018 → Jun 2019

Reason as filed by the promoterOccupation Certificate in respect of wing B, C and D is received and civil construction work of wing A is completed in all respect except the compliance of C.C. order condition like N.O.C. form Fire Department and the same is under process.

Litigation declared1

CaseCourtStatus
45/2013TAHSILDAR THANELitigation Cleared by Tahsildar Order

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000044061PIYUSH G. S. SARASMAHENDRA M. KANUNGO18/05/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Mar 2023

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Pinnacolo Soc - Conveyance Letter.pdf2 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form4.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf24 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC A WING.pdf24 Mar 2023
Status of ConveyanceFile: society certificate.pdf24 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Pinnacolo Soceity.pdf20 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC FROM MBMC.pdf9 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf9 Apr 2018
OtherFile: 2 A wing ground.pdf9 Apr 2018
OtherFile: 3 Plot A podium.pdf9 Apr 2018
OtherFile: 5 a b r block plan.pdf9 Apr 2018
OtherFile: 6 BCD WING.pdf9 Apr 2018
OtherFile: 7 BCD WING.pdf9 Apr 2018
OtherFile: ABCD Wing Stilt.pdf9 Apr 2018
OtherFile: RERA.pdf9 Apr 2018
OtherFile: OC.pdf9 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 new.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 new.pdf29 Jul 2017
Proforma of Allotment letterFile: Final RERA Agreement Pinnacolo SKD Realty.pdf29 Jul 2017
OtherFile: MMRDA NOC NEW COMPRESSED.pdf29 Jul 2017
OtherFile: 7-12 compress.pdf29 Jul 2017
OtherFile: TYPICAL FLOOR PLAN 1.pdf29 Jul 2017
OtherFile: RERA_Amenities.pdf29 Jul 2017
OtherFile: ABCD WING PARKING PLAN COMPRESSED.pdf29 Jul 2017
OtherFile: Pinnacolo_Flat_Plan.pdf29 Jul 2017
Building plan approvalFile: Commencement Certificate.pdf28 Jul 2017
Layout approvalFile: BlockPlan.pdf28 Jul 2017
PAN CardFile: SKDLLP_PAN.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate compressed.pdf28 Jul 2017
Details of encumbrancesFile: Enccumbrance Cert.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: BlockPlan.pdf28 Jul 2017
Building Plan Approval (IOD)File: Commencement Certificate.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Form B compressed.pdf28 Jul 2017
Certificates of CA (Form 3)File: Form 3 compressed.pdf28 Jul 2017
Proforma of Allotment letterFile: RERA_LETTER OF ALLOTMENT.pdf28 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PINNACOLO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD7,600+ in Thane

2 kmPINNACOLOCompleted 102Lapsed / revoked 77Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 284 registered projects within 2 km.

Builder: SKD REALTY LLP

SKD REALTY LLP has 2 registrations on MahaRERA, including PINNACOLO and PINNACOLO NX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PINNACOLO is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PINNACOLO?

The registered promoter entity is SKD REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PINNACOLO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PINNACOLO?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PINNACOLO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PINNACOLO?

The professionals named in the filing: Architect: D N PATEL AND ASSOCIATES; Engineer: ELLORA PROJECT CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PINNACOLO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINNACOLO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINNACOLO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.