Home / Browse projects / Nagpur, Maharashtra / PINNACLE
PINNACLE
RG-MH-03720 · RERA P50500030126 · Last updated on MahaRERA portal: 27 Jun 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 3 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PINNACLE is a Residential / Group Housing project by KAPIL NANDKISHOR NATHANI in Nagpur, Maharashtra, registered with MahaRERA as P50500030126 on 31 Jul 2021. The registration is recorded completed; possession was promised by 7 Jun 2024. The completion date has moved by 3 months from the original filing.
At a glance
Project
- NamePINNACLE
- TypeResidential / Group Housing
- Location
- OLD BAGADGANJ ROAD
- BAGADGANJ
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440008
- Pincode440008
- RERA no.P50500030126
- ReraGenie IDRG-MH-03720
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Jul 2021
- Promised completion7 Jun 2024
- Revised completionRevised to 7 Jun 2024 (originally 31 Mar 2024)
- Buildings1 building record
- Documents filed93 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PINNACLE | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
PINNACLE: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JHAWAR DEVELOPERS | Nagpur (M Corp.) | Nagpur |
| Santdas Sadormal Chawla | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| KAPIL NANDKISHOR NATHANI | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterwe have completed the project and oc has been received as on 07/06/2024, we have already given the possession to customer, kindly allow us the extension so we can complete the compliances.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Dec 2024
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Cert_FO_380754_383707 PINNACLE.pdf | 27 Jun 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a March 2023 pinnacle.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a March 2023 pinnacle.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a pinnacle 2024.pdf | 5 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 pinnacle.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final PINNACLE_FORM 2_SEPT 2024.pdf | 4 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 pinnacle 2024 rectified.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Scan_PINNACLE_FORM 1_JUNE 2024.pdf | 2 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Scan_PINNACLE_FORM 1_SEPT 2024.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan_PINNACLE_FORM 2_SEPT 2024.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan_PINNACLE_FORM 2_JUNE 2024.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep-24 PINNACLE.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June-24 PINNACLE.pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: S and U June-24.pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: S and U Sep-24.pdf | 25 Dec 2024 |
| Declaration in FORM BFile: form b.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PINNACLE MARCH 2024 Rectified.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and unsold Mar-24 rectified.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PINNACLE MARCH 2024.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PINNACLE DEC 2023.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PINNACLE JUNE 2023.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PINNACLE SEPT 2023.pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Pinnacle 30-06-2023.pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Pinnacle 30-09-2023.pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Pinnacle 31-12-2023.pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Pinnacle 31-03-2024.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: pinnacle form-1_Q1.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: pinnacle form-1_Q2.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: pinnacle form-1_Q2.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: pinnacle form-1_Q3.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: pinnacle form-1_Q4.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pinnacle form-2_Q4.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pinnacle form-2_Q3.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pinnacle form-2_Q2.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pinnacle form-2_Q1.pdf | 4 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 pinnacle.pdf | 2 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar-23.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-22.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep-22.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June-22.pdf | 6 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 march 2023 pinnacle.pdf | 19 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 Pinnacle Mar-22.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 Pinnacle June-22.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 Pinnacle Sept-22.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PINNACLE Form 3 Dec-22.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 Pinnacle Mar-23.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 22.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 June 2022.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Sept 22.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 22.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 March 2023.pdf | 18 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: pinnacle 2a March 23.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 June 22.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sept22.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 22.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Marc 23.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Mar-22 of Pinnacle _final.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Dec-21 of Pinnacle _final.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan_FORM5 2022.pdf | 21 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PINNACALE_MALEWAR.pdf | 26 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PINNACALE_engineer.pdf | 26 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: PINNACALE_STOCK.pdf | 26 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CCF_PINNACALE_MALEWAR.pdf | 30 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CCF_PINNACALE_ENGINEER.pdf | 30 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CCF_PINNACALE_QULAITY.pdf | 30 May 2022 |
| Disclosure of sold/ booked inventoryFile: CCF_PINNACALE_STOCK.pdf | 30 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: scan_ENGINEER.pdf | 19 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: scan_MALEWAR.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: scan_QUALITY.pdf | 19 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: scan_STOCK.pdf | 19 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PINNACLE 09.pdf | 13 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PINNACLE 10.pdf | 13 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PINNACLE 11.pdf | 13 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: PINNACLE 13.pdf | 13 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PINNACLE FORM 1.pdf | 14 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PINNACLE FORM 2.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PINNACLE FORM 2A.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PINNACLE FORM 2A.pdf | 14 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: PINNACLE INVENTORY.pdf | 14 Aug 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SOLITARE | PLOT NO. 36 37 SHASTRI NAGAR | 16 | Completed | Dec 2018 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
Keep PINNACLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BAGADGANJ2,800+ in Nagpur
KUKREJA PARIS CITY-WING C & D
KUKREJA INFRASTRUCTURES
kASTURI HEIGHT
SKY DEVELOPERS AND PROMOTERS INDIA PVT. LT
EASTORIA GRACE
EASTORIA BUILDERS AND DEVLOPERS LLP
SDPL Om
SANDEEP DWELLERS PVT. LTD.
UDYOG VIHAR
ALLIANCE REALITIES
KUKREJA INFINITY EAST
KUKREJA INFRASTRUCTURES
See every Nagpur project, with the district possession charts
Builder: KAPIL NANDKISHOR NATHANI
KAPIL NANDKISHOR NATHANI has 8 registrations on MahaRERA, including SOLITAIRE and TIARA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if PINNACLE is delayed beyond 7 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PINNACLE?
The registered promoter entity is KAPIL NANDKISHOR NATHANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PINNACLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PINNACLE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in PINNACLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback