Home / Browse projects / Pune, Maharashtra / Pinnacle - A4 and A5
Pinnacle - A4 and A5
By Prakruti Constructions Pvt Ltd
RG-MH-82758 · RERA P52100054619 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Pinnacle - A4 and A5 is a Residential / Group Housing project by Prakruti Constructions Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100054619 on 2 Feb 2024. Possession is promised by 21 Feb 2027. 67 of the 84 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NamePinnacle - A4 and A5
- TypeResidential / Group Housing
- Location
- Tadiwala Road
- Sangamwadi
- Pune (M Corp.)
- Pune City
- Pune
- 411001
- Pincode411001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054619
- ReraGenie IDRG-MH-82758
Builder
- NamePrakruti Constructions Pvt Ltd
- Entity typeCompany
- DirectorMr Kewalkumar Kesarimal Jain
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Feb 2024
- Promised completion21 Feb 2027
- Revised completionNone
- Buildings2 building records
- Documents filed86 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A4 | NA | 8 | 7 | 28 | 0 | 28 |
| A5 | NA | 8 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 81%.
A464%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 81% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A548%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 49% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed174
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A4 | 42 | 16 | 58 |
| A5 | 90 | 26 | 116 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A5 | NA | Rs 7.91 cr | Rs 4.43 cr |
| A4 | NA | Rs 6.01 cr | Rs 5.05 cr |
| - | NA | Rs 3.11 cr | Rs 2.60 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vishal J Deshpande |
| Architect | Shilpa Patil |
| Engineer | Mahesh Rasal |
| Engineer | Harshad Pendse |
| Engineer | Vishwas Salunkhe |
| Engineer | Sunil Mane |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Prakruti Constructions Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Nov 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 21 Feb 2027
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: 2_ Engg Certificate.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 15 Jan 2026 |
| Form 2A (FY 2023-2024)File: 1_Form 2A_Mar 24.pdf | 8 Dec 2025 |
| Form 2A (FY 2024-2025)File: 2_Form 2A_Mar 25.pdf | 8 Dec 2025 |
| Form 5 (FY 2023-2024)File: 61_Pinnacle A4 and A5.pdf | 1 Dec 2025 |
| Building plan approvalFile: BUILDING PLAN 2.pdf | 5 Nov 2025 |
| Building plan approvalFile: BUILDING PLAN 3.pdf | 5 Nov 2025 |
| Building plan approvalFile: BUILDING PLAN 4.pdf | 5 Nov 2025 |
| Building plan approvalFile: ELEVATION A5_rotated.pdf | 5 Nov 2025 |
| Building plan approvalFile: A1 and A2UG Parking 8.pdf | 5 Nov 2025 |
| Building plan approvalFile: A1 and A2 LG Parking 9.pdf | 5 Nov 2025 |
| Building plan approvalFile: A2 Bldg refuge fl Plan 12_rotated (1).pdf | 5 Nov 2025 |
| Layout approvalFile: LAYOUT - PINNACLE.pdf | 4 Nov 2025 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 15 Oct 2025 |
| Layout approvalFile: 1_250912_Pin_Layout.pdf | 30 Sep 2025 |
| Building plan approvalFile: 2_250912_Pin_ A4_ Floor plans.pdf | 30 Sep 2025 |
| Building plan approvalFile: 4_250912_Pin _A5_ Floor plans.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Pin A4 A5_Signed.pdf | 23 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_Signed.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold Inventory.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 61_Pinnacle A4 and A5.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 31_Pinnacle - A4 and A5.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf | 8 Mar 2024 |
| Copy of the legal title reportFile: 240123_Legal Title Report_Format A_R1.pdf | 24 Jan 2024 |
| Other - LegalFile: 240124_Sale Deed.pdf | 24 Jan 2024 |
| Proforma of Agreement for saleFile: 240102_AFS_R3.pdf | 2 Jan 2024 |
| Layout approvalFile: 231221_Layout.pdf | 21 Dec 2023 |
| Building plan approvalFile: 231221_Sec Elv_A4.pdf | 21 Dec 2023 |
| Building plan approvalFile: 13_Building Plan_A5.pdf | 21 Dec 2023 |
| Building plan approvalFile: 231221_Sec Elv_A5.pdf | 21 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 231221_Layout.pdf | 21 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 231221_Sec Elv_A4.pdf | 21 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_A5.pdf | 21 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 231221_Sec Elv_A5.pdf | 21 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: 231221_Deviation Report_AFS_R1.pdf | 21 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_CA Certificate.pdf | 29 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DIN_KKJ.pdf | 29 Nov 2023 |
| Other - LegalFile: 20_Clarification_Declaration.pdf | 24 Nov 2023 |
| Building plan approvalFile: 13_Building Plan_A4.pdf | 22 Nov 2023 |
| PAN CardFile: 1_Pan Card.pdf | 22 Nov 2023 |
| Copy of the legal title reportFile: 2_Legal Title Report.pdf | 22 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 3_Encumbrance Certificate_Finance.pdf | 22 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 3_Encumbrance Certificate_Legal.pdf | 22 Nov 2023 |
| Details of encumbrances concerned to LegalFile: 3_Encumbrance Certificate_Finance.pdf | 22 Nov 2023 |
| Details of encumbrances concerned to LegalFile: 3_Encumbrance Certificate_Legal.pdf | 22 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_A4.pdf | 22 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 11_Commencement Certificate.pdf | 22 Nov 2023 |
| Declaration about Commencement CertificateFile: 14_Declaration about CC.pdf | 22 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Pinnacle - A4 and A5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sangamwadi13,700+ in Pune
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
HUES OF SKY
Bramhacorp Limited
Birla Punya Phase II
Birla Estates Private Limited
Birla Punya Phase 1
Birla Estates Private Limited
BOULEVARD TOWER A2
Bramhacorp Limited
One Place-Bund Garden Road
TOPSPACE LANDMARKS LLP
Eternia Phase 2
VENTURESPRO PROJECTS LLP
Builder: Prakruti Constructions Pvt Ltd
Prakruti Constructions Pvt Ltd has 1 registration on MahaRERA, including Pinnacle - A4 and A5. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Pinnacle - A4 and A5 is delayed beyond 21 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Pinnacle - A4 and A5?
The registered promoter entity is Prakruti Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Pinnacle - A4 and A5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Pinnacle - A4 and A5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Pinnacle - A4 and A5?
The professionals named in the filing: Architect: Vishal J Deshpande; Architect: Shilpa Patil; Engineer: Mahesh Rasal; Engineer: Harshad Pendse; Engineer: Vishwas Salunkhe; Engineer: Sunil Mane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pinnacle - A4 and A5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback