Home / Browse projects / Pune, Maharashtra / Pinnacle - A4 and A5

Registered No litigation declared Residential / Group Housing project

Pinnacle - A4 and A5

By Prakruti Constructions Pvt Ltd

RG-MH-82758 · RERA P52100054619 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 81%
17 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Pinnacle - A4 and A5 is a Residential / Group Housing project by Prakruti Constructions Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100054619 on 2 Feb 2024. Possession is promised by 21 Feb 2027. 67 of the 84 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NamePinnacle - A4 and A5
  • TypeResidential / Group Housing
  • Location
    • Tadiwala Road
    • Sangamwadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054619
  • ReraGenie IDRG-MH-82758

Builder

  • NamePrakruti Constructions Pvt Ltd
  • Entity typeCompany
  • DirectorMr Kewalkumar Kesarimal Jain

Key dates

this monthRegisteredFeb 2024PromisedFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion21 Feb 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Current status

80%67 of 84 units booked
70.9%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A4NA8728028
A5NA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 81%.

A464%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises81%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A548%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises49%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed174

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots174
Closed/Covered132
Open Space42
BuildingClosed/CoveredOpen SpaceTotal
A4421658
A59026116

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,512 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5046.32
Proposed, not sanctioned5,046 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Office A-20, Solitaire Business Hub, Near Neco Garden, Viman Nagar, Lohagaon, Pune- 41
Estimated costRs 17.03 cr
Cost incurredRs 12.08 cr
Work done70.92%
BuildingWingEstimatedIncurred
A5NARs 7.91 crRs 4.43 cr
A4NARs 6.01 crRs 5.05 cr
-NARs 3.11 crRs 2.60 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal J Deshpande
ArchitectShilpa Patil
EngineerMahesh Rasal
EngineerHarshad Pendse
EngineerVishwas Salunkhe
EngineerSunil Mane
Chartered AccountantSupriya Abhijit Mundada
Chartered AccountantGMKS & Co.
PartnerRole in project
Prakruti Constructions Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 21 Feb 2027

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf18 Apr 2026
Withdrawal Update Form 2File: 2_ Engg Certificate.pdf18 Apr 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf18 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf15 Jan 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf15 Jan 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf15 Jan 2026
Form 2A (FY 2023-2024)File: 1_Form 2A_Mar 24.pdf8 Dec 2025
Form 2A (FY 2024-2025)File: 2_Form 2A_Mar 25.pdf8 Dec 2025
Form 5 (FY 2023-2024)File: 61_Pinnacle A4 and A5.pdf1 Dec 2025
Building plan approvalFile: BUILDING PLAN 2.pdf5 Nov 2025
Building plan approvalFile: BUILDING PLAN 3.pdf5 Nov 2025
Building plan approvalFile: BUILDING PLAN 4.pdf5 Nov 2025
Building plan approvalFile: ELEVATION A5_rotated.pdf5 Nov 2025
Building plan approvalFile: A1 and A2UG Parking 8.pdf5 Nov 2025
Building plan approvalFile: A1 and A2 LG Parking 9.pdf5 Nov 2025
Building plan approvalFile: A2 Bldg refuge fl Plan 12_rotated (1).pdf5 Nov 2025
Layout approvalFile: LAYOUT - PINNACLE.pdf4 Nov 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf15 Oct 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf15 Oct 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf15 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate.pdf15 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate.pdf15 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate.pdf15 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf15 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf15 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf15 Oct 2025
Layout approvalFile: 1_250912_Pin_Layout.pdf30 Sep 2025
Building plan approvalFile: 2_250912_Pin_ A4_ Floor plans.pdf30 Sep 2025
Building plan approvalFile: 4_250912_Pin _A5_ Floor plans.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5_Pin A4 A5_Signed.pdf23 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_Signed.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold Inventory.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 61_Pinnacle A4 and A5.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 31_Pinnacle - A4 and A5.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf8 Mar 2024
Copy of the legal title reportFile: 240123_Legal Title Report_Format A_R1.pdf24 Jan 2024
Other - LegalFile: 240124_Sale Deed.pdf24 Jan 2024
Proforma of Agreement for saleFile: 240102_AFS_R3.pdf2 Jan 2024
Layout approvalFile: 231221_Layout.pdf21 Dec 2023
Building plan approvalFile: 231221_Sec Elv_A4.pdf21 Dec 2023
Building plan approvalFile: 13_Building Plan_A5.pdf21 Dec 2023
Building plan approvalFile: 231221_Sec Elv_A5.pdf21 Dec 2023
Copy of Layout Approval (in case of layout)File: 231221_Layout.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 231221_Sec Elv_A4.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_A5.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 231221_Sec Elv_A5.pdf21 Dec 2023
Deviation Report with respect to model copy of AgreementFile: 231221_Deviation Report_AFS_R1.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_CA Certificate.pdf29 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 19_DIN_KKJ.pdf29 Nov 2023
Other - LegalFile: 20_Clarification_Declaration.pdf24 Nov 2023
Building plan approvalFile: 13_Building Plan_A4.pdf22 Nov 2023
PAN CardFile: 1_Pan Card.pdf22 Nov 2023
Copy of the legal title reportFile: 2_Legal Title Report.pdf22 Nov 2023
Details of encumbrances concerned to FinanceFile: 3_Encumbrance Certificate_Finance.pdf22 Nov 2023
Details of encumbrances concerned to FinanceFile: 3_Encumbrance Certificate_Legal.pdf22 Nov 2023
Details of encumbrances concerned to LegalFile: 3_Encumbrance Certificate_Finance.pdf22 Nov 2023
Details of encumbrances concerned to LegalFile: 3_Encumbrance Certificate_Legal.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_A4.pdf22 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 11_Commencement Certificate.pdf22 Nov 2023
Declaration about Commencement CertificateFile: 14_Declaration about CC.pdf22 Nov 2023

How this compares with Pune

80%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pinnacle - A4 and A5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sangamwadi13,700+ in Pune

2 kmPinnacle - A4 and A5Completed 12Lapsed / revoked 19Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: Prakruti Constructions Pvt Ltd

Prakruti Constructions Pvt Ltd has 1 registration on MahaRERA, including Pinnacle - A4 and A5. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pinnacle - A4 and A5 is delayed beyond 21 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pinnacle - A4 and A5?

The registered promoter entity is Prakruti Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pinnacle - A4 and A5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pinnacle - A4 and A5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pinnacle - A4 and A5?

The professionals named in the filing: Architect: Vishal J Deshpande; Architect: Shilpa Patil; Engineer: Mahesh Rasal; Engineer: Harshad Pendse; Engineer: Vishwas Salunkhe; Engineer: Sunil Mane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pinnacle - A4 and A5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pinnacle - A4 and A5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pinnacle - A4 and A5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.