Registered No litigation declared Residential / Group Housing project

PINK TOPAZ

By PINK TOPAZ AOP

RG-MH-52909 · RERA P52100049390 · Last updated on MahaRERA portal: 5 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

PINK TOPAZ is a Residential / Group Housing project by PINK TOPAZ AOP in Pune, Maharashtra, registered with MahaRERA as P52100049390 on 7 Feb 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NamePINK TOPAZ
  • TypeResidential / Group Housing
  • Location
    • SANGVI
    • Sangavi
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • RERA no.P52100049390
  • ReraGenie IDRG-MH-52909

Builder

  • NamePINK TOPAZ AOP
  • Entity typeOthers
  • Named personsMANISH ISHWAR BHATEWARA, DEEPESH RAMANLAL SHAH, ASHISH KESHAVJI CHARLA, RAHUL RAM MOHTA, GOPAL MAHAVIRPRASAD JANGIR, PARAG DILIP SHAH, ASHISH DURGAPRASAD KASAT

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings6 building records
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA50000
WING BNA50000
WING CNA50000
WING DNA50000
WING ENA50000
WING FNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 5 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 5 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
LIFTYes0%

Parking filed1128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,128
Open Space1,128
BuildingOpen SpaceTotal
WING A188188
WING B188188
WING C188188
WING D188188
WING E188188
WING F188188

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,812 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15080.72
Proposed, not sanctioned14,581 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch266B BHAWANI PETH TIMBER MARKET PUNE 411042

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRIPAD PADHYE
EngineerG. A. BHILARE CONSULTANTS PVT. LTD.
Chartered AccountantSBH & COMPANY
PartnerRole in project
PINK TOPAZ AOP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - 2019-20.pdf5 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate - 2020-21.pdf5 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate - 2021-22.pdf5 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate - 2022-23.pdf5 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate - 2023-24.pdf5 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate - 2024-25.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 Arch Certificate Dec 24.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 Arch Certificate Mar 25.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 Form 3.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Eng Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 Eng Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Q3.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certificate on Project Cost Fund withdrawal (Form 3) June 24.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate on Project Cost Fund withdrawal (Form 3) Sep 24.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Q2.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 Comp.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Comp.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form no 5 signed.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Q1.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold Signed_compressed.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signed_11zon.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Audit Certificate_Signed.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_compressed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert - Signed_compressed.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 Architect Certificate - Signed Copy.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 Architech Certificate - Signed Copy.pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_April23_compressed.pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_June23_compressed.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold_compressed.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unlsod_compressed.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signed_compressed.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signed_compressed.pdf29 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - LEGAL and FINANCE.pdf31 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - LEGAL and FINANCE.pdf31 Jan 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT - BY LEGAL REALTY LLP.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf30 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate_Bank_Details.pdf30 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement Sale.pdf30 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf26 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf26 Jan 2023
CERSAI detailsFile: CERSAI RECEIPT.pdf12 Jan 2023
Layout approvalFile: 1.pdf11 Jan 2023
Building plan approvalFile: 4.pdf11 Jan 2023
Building plan approvalFile: 3.pdf11 Jan 2023
Building plan approvalFile: 2.pdf11 Jan 2023
Building plan approvalFile: 5.pdf11 Jan 2023
Building plan approvalFile: 6.pdf11 Jan 2023
Building plan approvalFile: 6.pdf11 Jan 2023
Copy of the legal title reportFile: SEARCH REPORT.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: 1.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf10 Jan 2023
Declaration in FORM BFile: Form B - Promoter.pdf3 Jan 2023
PAN CardFile: PAN CARD - PINK TOPAZ AOP.pdf9 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf9 Dec 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf9 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf9 Dec 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PINK TOPAZ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANGVI13,700+ in Pune

Builder: PINK TOPAZ AOP

PINK TOPAZ AOP has 1 registration on MahaRERA, including PINK TOPAZ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PINK TOPAZ is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PINK TOPAZ?

The registered promoter entity is PINK TOPAZ AOP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PINK TOPAZ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PINK TOPAZ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PINK TOPAZ?

The professionals named in the filing: Architect: SHRIPAD PADHYE; Engineer: G. A. BHILARE CONSULTANTS PVT. LTD.; Chartered Accountant: SBH & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PINK TOPAZ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINK TOPAZ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINK TOPAZ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.