PINK CITY TRIDENT PHASE 2

By AMI INFRA

RG-MH-12284 · RERA P51700001716 · Last updated on MahaRERA portal: 15 Jul 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 54 months past the filed date
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2022Possession promised54 months past this date
23 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

PINK CITY TRIDENT PHASE 2 is a Others project by AMI INFRA in Thane, Maharashtra, registered with MahaRERA as P51700001716 on 29 Jul 2017. Possession was promised by 30 Apr 2022 and is now 54 months past that date. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NamePINK CITY TRIDENT PHASE 2
  • TypeOthers
  • Location
    • P 9353 GUT NO 48 PINK CITY NEAR ROYAL PARK NAVARE NAGAR
    • AMBERNATH EAST DISTRICT THANE
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001716
  • ReraGenie IDRG-MH-12284

Builder

  • NameAMI INFRA
  • Entity typePartnership
  • PartnersDILIP MOTIRAM DALAL, GURMUKHDAS SABUMAL MORYANI, AMIT MORYANI THROUGH SARASWATI SAMADHAN LLP, MAHENDRA JAIN THROUGH BHARTI BULLION AND CONSTRUCTIONS LLP
  • Declared earlier projects1 →

Key dates

54 months past promisethis monthRegisteredJul 2017First promiseOct 2020Revised toApr 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jul 2017
  • Promised completion30 Apr 2022
  • Revised completionRevised to 30 Apr 2022 (originally 30 Oct 2020)
  • Buildings3 building records
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA90000
WING BNA140000
WING CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15
BuildingClosed/CoveredTotal
WING A55
WING B44
WING C66

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,825 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
JAYANTILAL DEDHIAAmbarnath(M Cl)Thane
MANJULA DEEPAK HARIAAmbarnath(M Cl)Thane

Approvals and building plan

Sanctioning authorityAMBERNATH MUNCIPAL COUNCIL
Permissible FSI5366.84
Proposed, not sanctioned4,913 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR JAIN PLAZA SHIVAJI CHOWK SHIV MANDIR ROAD AMBERNATH EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD SHANKAR KAMBLE KAMBLE
EngineerPRAMOD SHANKAR KAMBLE KAMBLE
Chartered AccountantVIKAS KAMRA
PartnerRole in project
AMI INFRA-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700006384Oct 2020 → Mar 2021

Reason as filed by the promoterThe project is under construction & we have completed more than 95% work on the project. However due to imposition of lockdown and consequently migration of labour and contractors we are facing difficulty in arranging the manpower to complete the project on time. Though while registering the project under RERA we were sure to complete the project on time i.e. on our proposed date, but due to this pandemic COVID - 19 it is getting delayed. Hence we request you to grant us the revised date of completion as 31/03/2021 for our Project - “Pink City Trident Phase - 2” bearing Registration No. P51700

EXT51700009914Oct 2020 → Oct 2021

Reason as filed by the promoterWe, Ami Infra, have registered for our real estate project "Ami Infra Trident Phase 2" bearing registration no. P51700001716.The date of completion of the project was given as 31.03.2021. However, we couldn’t complete said project within the stipulated period due Covid-19 pandemic, inadequate labour supply and changes in policies. We request to kindly accept our application and grant us the extension till 31.10.2021

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (Apr-June 2020)-final.pdf15 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (July-Sept 2020) final.pdf15 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (Oct-Dec 2020) final.pdf15 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (Jan-March 2021) final.pdf15 Jul 2021
Declaration about Commencement CertificateFile: FORM-D.pdf8 Jul 2021
Declaration about Commencement CertificateFile: FORM-B FINAL.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance-2A.pdf7 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold and Unsold.pdf7 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ami Infra Form 5 FY 19-20.pdf7 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Ami Infra.pdf31 Dec 2019
Certificates of CA (Form 5)File: ami infra.pdf13 Oct 2018
Certificates of CA (Form 3)File: CA certificate final.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Final Engineer Certificate form 2.pdf23 Jul 2017
Details of encumbrancesFile: no encumberance-rotated.pdf22 Jul 2017
Declaration in FORM BFile: SKMBT_C22017071704400 NITIN MORYANI-compressed-rotated.pdf22 Jul 2017
Layout approvalFile: Layout Plan.pdf21 Jul 2017
Building plan approvalFile: compressed_Commencement Certificate.pdf21 Jul 2017
PAN CardFile: Ani Infra - PAN Copy.pdf21 Jul 2017
Copy of the legal title reportFile: Title Certificate-compressed.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf21 Jul 2017
Building Plan Approval (IOD)File: compressed_Commencement Certificate.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: compressed_Commencement Certificate.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-compressed.pdf21 Jul 2017
Proforma of Allotment letterFile: letter and sale agreement.pdf21 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PINK CITY PHASE 1Ami Infra Pink City Gut No 48 Near Royal Park Navare Nagar Ambernath E 421 501 Dist Thane29CompletedMay 2017May 2017
PINK CITY PHASE 1Ami Infra Pink City Gut No 48 Near Royal Park Navare Nagar Ambernath E 421 501 Dist Thane71CompletedJul 2016Jul 2016
PINK CITY PHASE 1Ami Infra Pink City Gut No 48 Near Royal Park Navare Nagar Ambernath E 421 501 Dist Thane227CompletedJul 2015Jul 2015

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PINK CITY TRIDENT PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH EAST DISTRICT THANE7,600+ in Thane

2 kmPINK CITY TRIDENT PHASE Completed 113Lapsed / revoked 38Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 235 registered projects within 2 km.

Builder: AMI INFRA

AMI INFRA has 1 registration on MahaRERA, including PINK CITY TRIDENT PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that PINK CITY TRIDENT PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PINK CITY TRIDENT PHASE 2 is delayed beyond 30 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PINK CITY TRIDENT PHASE 2?

The registered promoter entity is AMI INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PINK CITY TRIDENT PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PINK CITY TRIDENT PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PINK CITY TRIDENT PHASE 2?

The professionals named in the filing: Architect: PRAMOD SHANKAR KAMBLE KAMBLE; Engineer: PRAMOD SHANKAR KAMBLE KAMBLE; Chartered Accountant: VIKAS KAMRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PINK CITY TRIDENT PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINK CITY TRIDENT PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINK CITY TRIDENT PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.