PG AVENUE 7
RG-MH-37166 · RERA P52100049232 · Last updated on MahaRERA portal: 20 Dec 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PG AVENUE 7 is a Commercial project by PARMAR REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100049232 on 3 Feb 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. 14 of the 14 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NamePG AVENUE 7
- TypeCommercial
- Location
- CTS 2158 SADASHIV PETH
- VIJAY NAGAR COLONY
- Pune (M Corp.)
- Pune City
- Pune
- 411030
- Pincode411030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049232
- ReraGenie IDRG-MH-37166
Builder
- NamePARMAR REALTORS
- Entity typePartnership
- PartnersKETAN DILIPCHAND GUNDECHA, DHIRAJ RAMESH PARMAR, CHIRAG RAMESH PARMAR, JIMEET SURESH PARMAR, SAMPATRAJ HEMCHAND JAIN, MUKESH GHISULAL JAIN
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Feb 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 20 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PG AVENUE 7 | NA | 8 | 8 | 0 | 14 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
PG AVENUE 7: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PG AVENUE 7 | NA | Rs 6.03 cr | Rs 5.12 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABHIJEET PATASKAR |
| Engineer | MAHESH VHANAMANE |
| Chartered Accountant | CA VIDHI S SHAH |
| Chartered Accountant | SPCM & ASSOCIATE |
| Chartered Accountant | CA SIDDHANT ABHAY BORA |
| Partner | Role in project |
|---|---|
| PARMAR REALTORS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Sep 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Signed Form 5.pdf | 20 Dec 2025 |
| Layout approvalFile: PMC PLAN CC-2357-23 20-12-2023.pdf | 3 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 (31 07 2025).pdf | 13 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Withdrawal Update Form 3File: signed form 3.pdf | 13 Aug 2025 |
| Occupational CertificateFile: Full Occupancy Certificate (25 07 2025).pdf | 13 Aug 2025 |
| Occupational CertificateFile: Form 4 (31 07 2025).pdf | 13 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed form 3.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed form 3.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY PARMAR REALTORS.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf | 16 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PARMAR REALTORS.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIGNED FORM 5.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SIGNED FORM 5 (2)_compressed (1).pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (3).pdf | 18 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (3).pdf | 18 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A (3).pdf | 18 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: PG AVENUE.pdf | 18 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM-3.pdf | 18 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 (3).pdf | 27 Jan 2023 |
| Other - FinanceFile: form 3 final signed (1).pdf | 27 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE PARMAR (1).pdf | 9 Jan 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE PARMAR (1).pdf | 9 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ketan Dilip Gundecha.pdf | 4 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jimeet Suresh Parmar.pdf | 4 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dhiraj Ramesh Parmar.pdf | 4 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sampatraj Hemchand Jain.pdf | 4 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Mukesh Ghisulal Jain.pdf | 4 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Chirag Ramesh Parmar.pdf | 4 Jan 2023 |
| Proforma of Agreement for saleFile: 13-12-2022 PROFORMA OF AGREEMENT TO SALE.pdf | 15 Dec 2022 |
| Copy of the legal title reportFile: Format A Legal Title Report.pdf | 13 Dec 2022 |
| Copy of the legal title reportFile: Search Report Adv Savita Kenchi.pdf | 13 Dec 2022 |
| Copy of the legal title reportFile: Format A Circular 28.pdf | 12 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate .pdf | 6 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer_s Certificate (1).pdf | 6 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A.pdf | 6 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory .pdf | 6 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Declaration.pdf | 6 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report AL (3).pdf | 6 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS (2).pdf | 6 Dec 2022 |
| Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf | 29 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200253422366_For_Asset_Based_Search_29_11_2022_13_40_41_084.pdf | 29 Nov 2022 |
| CERSAI detailsFile: Undertaking for CERSAI.pdf | 29 Nov 2022 |
| Layout approvalFile: 1st PMC Plan CC-1666-2022 03-10-2022.pdf | 28 Nov 2022 |
| Building plan approvalFile: 1st PMC Plan CC-1666-2022 03-10-2022.pdf | 28 Nov 2022 |
| PAN CardFile: PAN PARMAR REALTORS ABBFP6858R.pdf | 28 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep PG AVENUE 7 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIJAY NAGAR COLONY13,700+ in Pune
Filed coordinates, straight-line distance. 500 registered projects within 2 km.
NYATI EVANIA
NYATI CONSTRUCTION PRIVATE LIMITED
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
Builder: PARMAR REALTORS
PARMAR REALTORS has 1 registration on MahaRERA, including PG AVENUE 7. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PG AVENUE 7 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PG AVENUE 7?
The registered promoter entity is PARMAR REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PG AVENUE 7?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PG AVENUE 7?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PG AVENUE 7?
The professionals named in the filing: Architect: ABHIJEET PATASKAR; Engineer: MAHESH VHANAMANE; Chartered Accountant: CA VIDHI S SHAH; Chartered Accountant: SPCM & ASSOCIATE; Chartered Accountant: CA SIDDHANT ABHAY BORA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PG AVENUE 7?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback