Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 90%
64 of 118Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

PAWSHE PRIDE is a Others project by PAWSHE GROUP BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700051148 on 1 Jun 2023. Possession is promised by 30 Apr 2028. 54 of the 118 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePAWSHE PRIDE
  • TypeOthers
  • Location
    • KAILASH NAGAR
    • KALYAN EAST
    • KATEMANEVALI
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • RERA no.P51700051148
  • ReraGenie IDRG-MH-05771

Builder

  • NamePAWSHE GROUP BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABBFP4222B1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2023PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

46%54 of 118 units booked

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PAWSHE PRIDENA17171117118

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

PAWSHE PRIDE: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered1
Open Space28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,310 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityADTP, KALYAN DOMBIVALI MUNICIPAL CORPORATION, KALYAN
Permissible FSI5183.14
Proposed, not sanctioned5,183 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI NARIMAN POINT

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTUSHAR TENDOLKAR
EngineerBHIRUD AND ASSOCIATES
Chartered AccountantMAYUR K JAIN AND CO
Chartered AccountantMOHIT PRAKASH JAIN & ASSOCIATES
PartnerRole in project
PAWSHE GROUP BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 till 31 MARCH 2026.pdf9 May 2026
Form 3File: Pawashe pride Form signed.pdf9 May 2026
Form 2File: Form 2 Enginere Certificate till 31 March 2026.pdf9 May 2026
Disclosure of Sold and Booked InventoryFile: Fill Sold and Unsold list 31 March 2026.pdf9 May 2026
Form 1File: FORM 1 till 31 DEC 2025.pdf25 Mar 2026
Form 2File: Form 2 Enginere Certificate till 31 Dec 2025.pdf25 Mar 2026
Form 3File: form 3 31-12-2025.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: Fill Sold and Unsold list 31 Dec 2025.pdf25 Mar 2026
Form 1File: FORM 1 till 30 Sept 2025.pdf10 Jan 2026
Form 2File: Form 2 Enginere Certificate till 30 Sept 2025.pdf10 Jan 2026
Form 3File: Pawashe pride Form 3 till 30th Sept 2025.pdf10 Jan 2026
Disclosure of Sold and Booked InventoryFile: Fill Sold and Unsold list 30 Sept 2025.pdf10 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 2024-25 Signed.pdf3 Oct 2025
Form 1File: Form-1 30-06-2025.pdf7 Aug 2025
Form 2File: Form-2 30-06-2025.pdf7 Aug 2025
Form 3File: Form-3 30-06-2025.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Fill Sold and Unsold list 30 June 2025.pdf7 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-03-2025 Sign_compressed.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final 31-03-2025 Sign.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Fill Sold and Unsold list 31 March 2025.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-03-2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 till 31 MARCH 2025.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 till 31 MARCH 2025.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Fill Sold and Unsold list 31 Dec 2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 till 31 DEC 2024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2024 Sign.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Pawshe Pride 30-09-2024_compressed.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Fill Sold and Unsold list 30 June 2024.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Fill Sold and Unsold list 30-09-2024.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Pawshe Pride 30-06-2024 Sign_compressed.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised FORM 1 30-09-2024.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Form 2 Enginere Certificate till 30 Sept 2024.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Sign Copy.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 till 30 JUNE 2024.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginere Certificate till 31 June 2024.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A FY 2023-24.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-03-2024 Sing_compressed.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form-2 31-03-2024.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold 31-03-2024.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2024.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-03-2024.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginere Certificate till 31 Dec 2023.pdf1 Feb 2024
Disclosure of sold/ booked inventoryFile: Revised Fill Sold and Unsold list 31 Dec 2023 (1).pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Pawshe Pride_compressed.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 till 31 DEC 2023.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pawashe pride Form 3 SIGNED compressed.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 till 23 Oct 2023.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginere Certificate till 13th Oct 2023.pdf27 Oct 2023
Disclosure of sold/ booked inventoryFile: Fill Sold and Unsold list - Corrected.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 20042023.pdf13 Oct 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Financial Encumbrance.pdf3 Oct 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Legal Encumbrance.pdf3 Oct 2023
Details of encumbrances concerned to LegalFile: Self Declaration Financial Encumbrance.pdf3 Oct 2023
Details of encumbrances concerned to LegalFile: Self Declaration Legal Encumbrance.pdf3 Oct 2023
Copy of the legal title reportFile: New Legal Title report_compressed.pdf19 May 2023
Copy of the legal title reportFile: new flow of the title report_compressed.pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-REVISED.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200268058921_For_Asset_Based_Search_08_05_2023_11_30_04_643.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A1.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A 2.pdf8 May 2023
Layout approvalFile: MYSCAN_20230413_0001_compressed.pdf1 May 2023
Layout approvalFile: MYSCAN_20230413_0002_compressed.pdf1 May 2023
Building plan approvalFile: MYSCAN_20230413_0001_compressed.pdf1 May 2023
Building plan approvalFile: MYSCAN_20230413_0002_compressed.pdf1 May 2023
PAN CardFile: Pawshe Group Pan Card.pdf1 May 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCES.pdf1 May 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCES.pdf1 May 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCES.pdf1 May 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCES.pdf1 May 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230413_0001_compressed.pdf1 May 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230413_0002_compressed.pdf1 May 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0001_compressed.pdf1 May 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0002_compressed.pdf1 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Pawshe Pride Commencement Certificate.pdf1 May 2023
Declaration about Commencement CertificateFile: FORM D FORMAT.pdf1 May 2023
Declaration in FORM BFile: FORM B M-S PAWSHE GROUP BUILDER AND DEVELOPERS .pdf1 May 2023
CERSAI detailsFile: No Cersai declaration.pdf1 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 PAWSHE GROUP BUILDERS AND DEVELOPERS_compressed (1).pdf1 May 2023

How this compares with Thane

46%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PAWSHE PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN EAST7,600+ in Thane

Builder: PAWSHE GROUP BUILDERS AND DEVELOPERS

PAWSHE GROUP BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including PAWSHE PRIDE and Pawshe Arcade. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PAWSHE PRIDE is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PAWSHE PRIDE?

The registered promoter entity is PAWSHE GROUP BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABBFP4222B1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PAWSHE PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PAWSHE PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PAWSHE PRIDE?

The professionals named in the filing: Architect: TUSHAR TENDOLKAR; Engineer: BHIRUD AND ASSOCIATES; Chartered Accountant: MAYUR K JAIN AND CO; Chartered Accountant: MOHIT PRAKASH JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PAWSHE PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PAWSHE PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PAWSHE PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.