ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / PAWAR PLAZZA

Registration lapsed No litigation declared Commercial project

PAWAR PLAZZA

By VAISHNAVI SPACE CREATOR

RG-MH-17400 · RERA P52100029028 · Last updated on MahaRERA portal: 26 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 85%
1Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

PAWAR PLAZZA is a Commercial project by VAISHNAVI SPACE CREATOR in Pune, Maharashtra, registered with MahaRERA as P52100029028 on 23 Apr 2021. Possession was promised by 25 Mar 2025 and is now 19 months past that date. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePAWAR PLAZZA
  • TypeCommercial
  • Location
    • NR.Indira college
    • Tathawade
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100029028
  • ReraGenie IDRG-MH-17400

Builder

  • NameVAISHNAVI SPACE CREATOR
  • Entity typePartnership
  • PartnersGIRISHKUMAR DAHYABHAI PATEL, TARUNKUMAR AMBALAL PATEL, SANDEEP GOPAL PATEL
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

19 months past promisethis monthRegisteredApr 2021First promiseMar 2023Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Apr 2021
  • Promised completion25 Mar 2025
  • Revised completionRevised to 25 Mar 2025 (originally 31 Mar 2023)
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIAL BUILDINGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 85%.

COMMERCIAL BUILDING: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises58%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,707 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Mr.SUNIL RAMCHANDRA PAWARTathwadePune
GURUNATH PAWARPune (M Corp.)Pune
SUNNY JYOTIBA PAWARPune (M Corp.)Pune

Approvals and building plan

Permissible FSI1225.19
Proposed, not sanctioned595 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEmpire Estate, Chinchwad, pune -411019

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIMAYA ASSOCIATES
EngineerAADHAR ENGINEERS
Chartered AccountantCA VIREN RAMESHBHAI POKAR
PartnerRole in project
VAISHNAVI SPACE CREATOR-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019458Mar 2023 → Mar 2025

Reason as filed by the promoterwe have delayed our project due to slow booking due to covide effect as well as internal fund issue due to slower booking still we have completed almost 80% of work only finishing work pending.

EXT52100015111Mar 2023 → Mar 2024

Reason as filed by the promoterDelay due to covide-19 pendemic.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501718Vikram KachruVAISHNAVI SPACE CREATOR26/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 - QUERTER ENDED -31-3-2024.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-QUERTER ENDED -31-3-2024.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD - QUERTER ENDED -31-3-2024.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-FOR QUERTER ENDED -31-3-2024.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf17 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200303503197_For_Debtor_Based_Search_08_04_2024_22_13_29_965.pdf8 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATION.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5.pdf8 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT DISCLOSURE.pdf8 Apr 2024
Declaration in FORM BFile: FORM-B-PROMOTERS.pdf29 Mar 2024
Declaration in FORM BFile: FORM-B- CO-PROMOTERS.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECT CERTIFICATE.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-ENGINEER CERTIFICATE.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2-ENGINEER CERTIFICATE.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf29 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5.pdf29 Mar 2024
Disclosure of sold/ booked inventoryFile: ANNEXTURE -A - SOLD UNSOLD.pdf24 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3- 13-12-2023.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf7 Dec 2023
Declaration about Commencement CertificateFile: DECLARATION TO COMMENCEMENT (1).pdf21 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf21 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-2019-20.pdf21 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-2020-21.pdf21 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A-2021-22.pdf21 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5-2019-20.pdf21 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5-2020-21.pdf21 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5-2021-22.pdf21 Mar 2023
Layout approvalFile: LAYOUT_compressed.pdf27 Jan 2022
Building plan approvalFile: COMMERCIAL -BASMENT-GROUND-1ST FLOOR PLAN_compressed.pdf27 Jan 2022
Building plan approvalFile: COMMERCIAL ALLIVATION PLAN_compressed.pdf27 Jan 2022
Building plan approvalFile: COMMERCIAL 2-3-4 FLOOR PLAN_compressed.pdf27 Jan 2022
Building plan approvalFile: SECTION AND ELIVATION PLAN_compressed.pdf27 Jan 2022
Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf27 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: COMMERCIAL -BASMENT-GROUND-1ST FLOOR PLAN_compressed.pdf27 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: COMMERCIAL ALLIVATION PLAN_compressed.pdf27 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: COMMERCIAL 2-3-4 FLOOR PLAN_compressed.pdf27 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: SECTION AND ELIVATION PLAN_compressed.pdf27 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT_compressed.pdf27 Jan 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf17 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf17 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT NEW_compressed.pdf7 Apr 2021
Layout approvalFile: LAYOUT PLAN_compressed.pdf16 Mar 2021
Building plan approvalFile: FLOOR PLAN.pdf16 Mar 2021
PAN CardFile: COMPANY PAN.pdf16 Mar 2021
Details of encumbrancesFile: NO ENCUMBRENCE.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_compressed.pdf16 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLAN.pdf16 Mar 2021
Declaration in FORM BFile: FORM B- PROMOTORE.pdf16 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf16 Mar 2021
Proforma of Allotment letterFile: AGREEMENT TO SALES_compressed.pdf16 Mar 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
STARWOODS NO 58 OPP INDIRA COLLEGE MUMBAI PUNE HIGHWAY TATHWADE PUNE 3358CompletedApr 2017Apr 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PAWAR PLAZZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathawade13,700+ in Pune

Builder: VAISHNAVI SPACE CREATOR

Vaishnavi Space Creator has 3 registrations on MahaRERA, including Star Woods Phase I and Star Woods Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that PAWAR PLAZZA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PAWAR PLAZZA is delayed beyond 25 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PAWAR PLAZZA?

The registered promoter entity is VAISHNAVI SPACE CREATOR, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PAWAR PLAZZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PAWAR PLAZZA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PAWAR PLAZZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PAWAR PLAZZA?

The professionals named in the filing: Architect: KIMAYA ASSOCIATES; Engineer: AADHAR ENGINEERS; Chartered Accountant: CA VIREN RAMESHBHAI POKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PAWAR PLAZZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PAWAR PLAZZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PAWAR PLAZZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.