Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PAWAN HEIGHTS is a Others project by PAWAN ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700048857 on 24 Jan 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 24 months from the original filing. 20 of the 56 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NamePAWAN HEIGHTS
- TypeOthers
- Location
- KALYAN
- Thane
- 421301
- Pincode421301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700048857
- ReraGenie IDRG-MH-67387
Builder
- NamePAWAN ENTERPRISES
- Entity typePartnership
- PartnersPRAKASH MANGILAL JAIN, SANJAY SHASHIKANT TELI, KIRAN SHASHIKANT TELI, MUKESH BABULAL DINODIYA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2023
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed77 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PAWAN HEIGHTS | NA | 8 | 8 | 39 | 17 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
PAWAN HEIGHTS: 57% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PURUSHOTTAM WAMAN MARATE | Kalyan | Thane |
| SUPRIYA PURUSHOTTAM MARATHE | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PAWAN HEIGHTS | NA | Rs 5.99 cr | Rs 4.27 cr |
| - | NA | Rs 21.89 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CREDIBLE DESIGNS |
| Engineer | ARUN R KHARKHANIS |
| Chartered Accountant | MUKESH SONI AND ASSOCIATES |
| Chartered Accountant | NITIN BALAJI DHAVAN |
| Partner | Role in project |
|---|---|
| PAWAN ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage or unavailability of critical materials (cement, steel, tiles, electricals). Price escalation making procurement unviable within budgeted timelines Delays in material delivery due to global supply shortages, shipping delays, or import/export restrictions. Unavailability of specialized equipment or construction components
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Pawan_Ent_Form_1.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: Pawan_Ent_Form_2.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: FORM 3 - PAWAN ENT - MARCH 26.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: form 1 pawan dec 25.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: form 2 pawan dec 25.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: form 3 signed.pdf | 6 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 - PAWAN - JUN 25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 - PAWAN - SEPT 25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 - PAWAN - JUN 25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 - PAWAN - SEPT 25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 - PAWAN - JUN 25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 - PAWAN - SEPT 25.pdf | 16 Dec 2025 |
| Form 2A (FY 2024-2025)File: Pawan_Ent_Form_2A.pdf | 21 Jun 2025 |
| Form 5 (FY 2024-2025)File: PAWAN - FORM 5 FY 24-25.pdf | 11 Jun 2025 |
| Form 1File: Pawan_Ent_Form_1__1_.pdf | 10 Jun 2025 |
| Form 2File: Pawan_Ent_Form_2__1_.pdf | 10 Jun 2025 |
| Form 3File: FORM 3 - PAWAN ENT - MARCH 25- SIGN.pdf | 10 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECL - PAWAN ENT - JAN TO MAR.pdf | 10 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE_FOR_SOLD_AND_UNSOLD_UNITS PAWAN ENT PDF.pdf | 10 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2024 - PAWAN HEIGHTS.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 dec 2024 PAWAN HEIGHTS signed.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024 - PAWAN HEIGHTS.pdf | 10 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 2024 - PAWAN ENTERPRISES.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2024- PAWAN ENTERPRISES.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPTEMBER 024- PAWAN ENTERPRISES.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2024- PAWAN ENTERPRISES - SIGN.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2024 - PAWAN ENTERPRISES - SIGN.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2024- PAWAN ENTERPRISES - SIGN (1).pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2024 - PAWAN ENTERPRISES_11zon.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2024- PAWAN ENTERPRISES_11zon.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPTEMBER 2024 - PAWAN ENTERPRISES_11zon.pdf | 13 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23-24- PAWAN ENTERPISES.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24 PAWAN ENTERPRISES SIGN.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 23.pdf | 29 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 23.pdf | 29 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 23 1.pdf | 29 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 23 PAWAN.pdf | 29 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 23 PAWAN_0001.pdf | 29 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 23 PAWAN.pdf | 29 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH PAWAN-1.pdf | 29 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 23 PAWAN.pdf | 29 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 23 PAWAM.pdf | 29 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 29 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD UNSOLD.pdf | 29 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 23 PAWAN_11zon.pdf | 29 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 23 PAWAN_11zon.pdf | 29 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 23 PAWAN_11zon.pdf | 29 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PAWAN 2023.pdf | 29 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE-1.pdf | 11 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE-2.pdf | 11 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE-3.pdf | 11 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE-4.pdf | 11 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE-5.pdf | 11 Jan 2023 |
| Other - TechnicalFile: PLINTH CERTIFICATE.pdf | 29 Dec 2022 |
| Copy of the legal title reportFile: titel.pdf | 21 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: img4.pdf | 21 Dec 2022 |
| Details of encumbrances concerned to LegalFile: img4.pdf | 21 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 21 Dec 2022 |
| Layout approvalFile: APPROVED PLAN COPY_11zon.pdf | 6 Dec 2022 |
| Building plan approvalFile: APPROVED PLAN COPY_11zon.pdf | 6 Dec 2022 |
| PAN CardFile: pawan pan card.pdf | 6 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: APPROVED PLAN COPY_11zon.pdf | 6 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN COPY_11zon.pdf | 6 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 6 Dec 2022 |
| Declaration about Commencement CertificateFile: FORMAT D-DECLARATION FOR CC_rotated.pdf | 6 Dec 2022 |
| Declaration in FORM BFile: FORM B PROMOTER.pdf | 6 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 pawan_11zon.pdf | 6 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 pawan_11zon.pdf | 6 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200254106185_For_Asset_Based_Search_06_12_2022_17_13_19_030.pdf | 6 Dec 2022 |
| Proforma of Allotment letterFile: allotment letter pawan_11zon.pdf | 6 Dec 2022 |
| Proforma of Agreement for saleFile: Annexure 'A' - - DRAFT AGREEMENT.pdf | 6 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank account.pdf | 6 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: deviation allotment letter.pdf | 6 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation report agreement.pdf | 6 Dec 2022 |
| Other - TechnicalFile: LAND SALE VISHNU BEHRE.pdf | 6 Dec 2022 |
| Other - TechnicalFile: LAND SALE RAJGI SHABBIR AHMED.pdf | 6 Dec 2022 |
| Other - TechnicalFile: LAND SALE ARVIND KAPOTE.pdf | 6 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PAWAN HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KALYAN7,600+ in Thane
Filed coordinates, straight-line distance. 243 registered projects within 2 km.
PODDAR RIVIERA PHASE - I
Poddar Housing and Development Limited
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
See every Thane project, with the district possession charts
Builder: PAWAN ENTERPRISES
PAWAN ENTERPRISES has 2 registrations on MahaRERA, including PAWAN HEIGHTS and STONE VISTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if PAWAN HEIGHTS is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PAWAN HEIGHTS?
The registered promoter entity is PAWAN ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PAWAN HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PAWAN HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PAWAN HEIGHTS?
The professionals named in the filing: Architect: CREDIBLE DESIGNS; Engineer: ARUN R KHARKHANIS; Chartered Accountant: MUKESH SONI AND ASSOCIATES; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PAWAN HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback