Registered No litigation declared Residential / Group Housing project

PATELS INFINIA

By R CITY DEVELOPERS

RG-MH-05789 · RERA P51700051222 · Last updated on MahaRERA portal: 3 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 75%
93 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

PATELS INFINIA is a Residential / Group Housing project by R CITY DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700051222 on 8 Jun 2023. Possession is promised by 1 May 2027. 57 of the 150 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NamePATELS INFINIA
  • TypeResidential / Group Housing
  • Location
    • SHIVGANGA NAGAR
    • AMBERNATH EAST
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051222
  • ReraGenie IDRG-MH-05789

Builder

  • NameR CITY DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAMFR6424R1ZC
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBHUSHAN ARVIND WALEKAR, GIRISH RAMCHAND KUKREJA, PRASHANT HARILAL VERAT, SURESH MANJIBHAI PATEL, ANKIT SANJAY AGARWAL, SANJAY B AGARWAL, PATEL RPL REALTY PRIVATE LIMITED THROUGH ITS DIRECTOR ANKIT B PATEL
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion1 May 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Current status

38%57 of 150 units booked
53.1%Work done, per cost certificate

Figures as on 3 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA141278078
WING BNA121172072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.

WING A56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B57%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,985 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAMBERNATH MUNICIPAL COUNCIL
Permissible FSI12752.0
Proposed, not sanctioned12,752 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMBERNATH EAST
Estimated costRs 39.71 cr
Cost incurredRs 21.10 cr
Work done53.14%
BuildingWingEstimatedIncurred
WING ANARs 19.50 crRs 10.53 cr
WING BNARs 18.32 crRs 10.51 cr
-NARs 1.89 crRs 6.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASAD K GARAD
EngineerSV PATEL PVT LTD
EngineerGANESH PATIL
Chartered AccountantMEHTA SINGHVI & ASSOCIATES
Chartered AccountantDINESH NARWANI & CO
PartnerRole in project
R CITY DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 May 2027

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RCity Form 1 30JUN25.pdf3 Dec 2025
Withdrawal Update Form 2File: RCity Form 2 30JUN25.pdf3 Dec 2025
Withdrawal Update Form 3File: RCity Form 3 30JUN25.pdf3 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rcity Form 1 31MAR25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RCity Form 3 31MAR25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCity Form 2 31MAR25.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rcity Form 5 2024.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rcity Form 3 30JUN24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rcity Form 3 30SEP24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rcity Form 3 31DEC24.pdf14 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Rcity Form 3 30JUN24.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rcity Form 1 30JUN24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rcity Form 1 30SEP24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rcity Form 1 31DEC24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rcity Form 3 31MAR24.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rcity Form 3 31MAR24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rcity Form 2 31MAR24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCITY Form 2 30JUN24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCITY Form 2 30SEP24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCITY Form 2 31DEC24.pdf13 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rcity Form 2A 2024.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RCITYBANKDETAILS.pdf26 Feb 2024
Other - FinanceFile: RCITYBFORM.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Omkar Form 1 31DEC2023.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R CIty Form 1 31DEC2023.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rcity Form 2 31DEC2023.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R CIty Form 3 31DEC2023.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: R CITY BHFL Index II.pdf1 Sep 2023
Details of encumbrances concerned to LegalFile: R CITY BHFL Index II.pdf1 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: r city form2.pdf30 May 2023
Building plan approvalFile: R CITY CC 2 OF 5.pdf29 May 2023
Building plan approvalFile: R CITY CC 3 OF 5.pdf29 May 2023
Building plan approvalFile: R CITY CC 4 OF 5.pdf29 May 2023
Building plan approvalFile: R CITY CC 5 OF 5.pdf29 May 2023
Details of encumbrances concerned to FinanceFile: NON ENC TO FINANCE LEGAL.pdf29 May 2023
Details of encumbrances concerned to LegalFile: NON ENC TO FINANCE LEGAL.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: R CITY CC 2 OF 5.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: R CITY CC 3 OF 5.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: R CITY CC 4 OF 5.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: R CITY CC 5 OF 5.pdf29 May 2023
CERSAI detailsFile: RCITY NO CERSAI.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R CITY FORM 3.pdf29 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RCITY SEPERATE BANK DETAILS.pdf29 May 2023
Deviation Report with respect to Allotment letterFile: DEVIATION IN AL.pdf29 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION IN AFS.pdf29 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf27 May 2023
Proforma of Agreement for saleFile: RCITY AFS.pdf19 May 2023
Copy of the legal title reportFile: RCITY TITLE.pdf11 May 2023
Layout approvalFile: R CITY CC 1OF5.pdf6 May 2023
PAN CardFile: RCITY PAN.pdf6 May 2023
Copy of Layout Approval (in case of layout)File: R CITY CC 1OF5.pdf6 May 2023
Commencement Certificates / NA Order for plotted developmentFile: R CITY CC1 21APR23.pdf6 May 2023
Declaration about Commencement CertificateFile: RCITY DECLARATION ABOUT CC.pdf6 May 2023
Declaration in FORM BFile: RCITY FORMB.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RCITY FORM1.pdf6 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RCITY DISCLOSURE OF INTREST IN OTHER PROJECTS ALL PARTNERS.pdf6 May 2023

How this compares with Thane

38%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PATELS INFINIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH EAST7,600+ in Thane

2 kmPATELS INFINIACompleted 100Lapsed / revoked 40Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: R CITY DEVELOPERS

R CITY DEVELOPERS has 2 registrations on MahaRERA, including PATELS INFINIA and PATELS AIRICA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PATELS INFINIA is delayed beyond 1 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PATELS INFINIA?

The registered promoter entity is R CITY DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAMFR6424R1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PATELS INFINIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PATELS INFINIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PATELS INFINIA?

The professionals named in the filing: Architect: PRASAD K GARAD; Engineer: SV PATEL PVT LTD; Engineer: GANESH PATIL; Chartered Accountant: MEHTA SINGHVI & ASSOCIATES; Chartered Accountant: DINESH NARWANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PATELS INFINIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PATELS INFINIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PATELS INFINIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.